FY23 AFSOC103008, Squadron Operations / MSRP Parts Warehouse / Group HQ Facilities, Yokota Air Base, Japan
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912HV23B0003
- Agency
-
ENDIST Japan
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Local Area Set-Aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Japan
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District Japan seeks to award a design-bid-build contract to construct group and squadron operations facilities, an aircraft parts warehouse, and a Mobility Readiness Spare Packages warehouse at Yokota Air Base in Japan. The facilities are to include administrative, planning, briefing, storage and maintenance areas with concrete foundations, steel frames, masonry walls and sloped metal roofs. The warehouses require utilities, pavements, site improvements and communications. The deadline for questions is March 31, 2023 and bids are due through PIEE by August 22, 2023. Evaluation will be based on price.
The solicitation is set aside for local area sources located and authorized to perform construction work in Japan. The estimated price range for the work is between 2.5 and 10 billion Japanese yen. Potential contractors include Nippo Takamatsu Corporation-Unite Corporation JV. The facilities must be completed within 930 days of notice to proceed and the place of performance is Yokota Air Base in Japan.
Notice text
8 versions
Update #8 · Latest ·
19 January 2023 Note: The AM0001 and attached Excel file for requesting site visit were successfully uploaded to PIEE portal.
18 January 2023 Update: W912HV-23-B-0003-AM0001 is released to add pre-bid conference information and revise site visit information. Please note, the amendment was not able to be uploaded to PIEE at the time of amendment release. The Government will upload them to PIEE at a later date when available. The files can be downloaded on SAM.gov for the time being.
AFSOC Squadron Operations / MRSP Parts Warehouse / Group HQ Facilities. Design-Bid-Build. Construct group and squadron operations facilities with concrete foundation and floor slab, steel frame, masonry walls and sloped metal roof. Functional areas include areas such as staff and administration, planning and briefing areas, mobility storage, life support/aircrew flight equipment storage and maintenance. Construct aircraft parts and Mobility readiness Spare Packages (MRSP) warehouse with associated external covered and uncovered storage elements. Concrete foundation and floor slab, steel frame, masonry and/or steel walls, sloped metal roof, structured for material handling equipment and racking systems and associated uncovered storage. All facilities include utilities, pavements, campus parking, site improvements, communications and all other necessary support.
Link to PIEE can be found here:: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HV23B0003
07 February 2023 Update: The Pre-Preposal slides, Pre-Proposal roster and Site Visit roster are hereby provided.
26 April 2023 Update: The bid due date is hereby extended to 2:00PM on 18 August 2023.
23 May 2023 Update: Amendment 0004 is hereby issued to address RFI responses. Bid due date remains 18 August 2023.
20 August 2023 Update: Amendment 0005 is hereby issued to provide minor revisions to Section 01 11 00.00 10, extend the bid due date to 22 August 2023, at 2:00 PM JST, incorporate Clause 52.204-27 and revise Provision 52.211-14.
22 August 2023 Update: Abstract of bids has been attached.
Due to technical difficulties, the bid opening for Solicitation W912HV23B0003 will be held with the following information:
Meeting link:
https://usace1.webex.com/usace1/j.php?MTID=m9ef0d974d35901f01c9dd1fd940fcea7
Meeting number:
2762 827 3476
Meeting password:
8ncXgyeF?96
Join from a video or application
Dial 27628273476@usace1.webex.com
You can also dial 207.182.190.20 and enter your meeting number.
Join by phone
+1-844-800-2712 US Toll Free
+1-669-234-1177 US Toll
Access code: 27628273476
Global call-in numbers
https://usace1.webex.com/usace1/globalcallin.php?MTID=mf5e1ca15acf1398ba7280ea2612417f4
Toll-free calling restrictions
https://usace1.webex.com/usace1/customer_tollfree_restrictions.pdf
Update #7 ·
19 January 2023 Note: The AM0001 and attached Excel file for requesting site visit were successfully uploaded to PIEE portal.
18 January 2023 Update: W912HV-23-B-0003-AM0001 is released to add pre-bid conference information and revise site visit information. Please note, the amendment was not able to be uploaded to PIEE at the time of amendment release. The Government will upload them to PIEE at a later date when available. The files can be downloaded on SAM.gov for the time being.
AFSOC Squadron Operations / MRSP Parts Warehouse / Group HQ Facilities. Design-Bid-Build. Construct group and squadron operations facilities with concrete foundation and floor slab, steel frame, masonry walls and sloped metal roof. Functional areas include areas such as staff and administration, planning and briefing areas, mobility storage, life support/aircrew flight equipment storage and maintenance. Construct aircraft parts and Mobility readiness Spare Packages (MRSP) warehouse with associated external covered and uncovered storage elements. Concrete foundation and floor slab, steel frame, masonry and/or steel walls, sloped metal roof, structured for material handling equipment and racking systems and associated uncovered storage. All facilities include utilities, pavements, campus parking, site improvements, communications and all other necessary support.
Link to PIEE can be found here:: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HV23B0003
07 February 2023 Update: The Pre-Preposal slides, Pre-Proposal roster and Site Visit roster are hereby provided.
26 April 2023 Update: The bid due date is hereby extended to 2:00PM on 18 August 2023.
23 May 2023 Update: Amendment 0004 is hereby issued to address RFI responses. Bid due date remains 18 August 2023.
20 August 2023 Update: Amendment 0005 is hereby issued to provide minor revisions to Section 01 11 00.00 10, extend the bid due date to 22 August 2023, at 2:00 PM JST, incorporate Clause 52.204-27 and revise Provision 52.211-14.
Update #6 ·
19 January 2023 Note: The AM0001 and attached Excel file for requesting site visit were successfully uploaded to PIEE portal.
18 January 2023 Update: W912HV-23-B-0003-AM0001 is released to add pre-bid conference information and revise site visit information. Please note, the amendment was not able to be uploaded to PIEE at the time of amendment release. The Government will upload them to PIEE at a later date when available. The files can be downloaded on SAM.gov for the time being.
AFSOC Squadron Operations / MRSP Parts Warehouse / Group HQ Facilities. Design-Bid-Build. Construct group and squadron operations facilities with concrete foundation and floor slab, steel frame, masonry walls and sloped metal roof. Functional areas include areas such as staff and administration, planning and briefing areas, mobility storage, life support/aircrew flight equipment storage and maintenance. Construct aircraft parts and Mobility readiness Spare Packages (MRSP) warehouse with associated external covered and uncovered storage elements. Concrete foundation and floor slab, steel frame, masonry and/or steel walls, sloped metal roof, structured for material handling equipment and racking systems and associated uncovered storage. All facilities include utilities, pavements, campus parking, site improvements, communications and all other necessary support.
Link to PIEE can be found here:: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HV23B0003
07 February 2023 Update: The Pre-Preposal slides, Pre-Proposal roster and Site Visit roster are hereby provided.
26 April 2023 Update: The bid due date is hereby extended to 2:00PM on 18 August 2023.
23 May 2023 Update: Amendment 0004 is hereby issued to address RFI responses. Bid due date remains 18 August 2023.
Update #5 ·
19 January 2023 Note: The AM0001 and attached Excel file for requesting site visit were successfully uploaded to PIEE portal.
18 January 2023 Update: W912HV-23-B-0003-AM0001 is released to add pre-bid conference information and revise site visit information. Please note, the amendment was not able to be uploaded to PIEE at the time of amendment release. The Government will upload them to PIEE at a later date when available. The files can be downloaded on SAM.gov for the time being.
AFSOC Squadron Operations / MRSP Parts Warehouse / Group HQ Facilities. Design-Bid-Build. Construct group and squadron operations facilities with concrete foundation and floor slab, steel frame, masonry walls and sloped metal roof. Functional areas include areas such as staff and administration, planning and briefing areas, mobility storage, life support/aircrew flight equipment storage and maintenance. Construct aircraft parts and Mobility readiness Spare Packages (MRSP) warehouse with associated external covered and uncovered storage elements. Concrete foundation and floor slab, steel frame, masonry and/or steel walls, sloped metal roof, structured for material handling equipment and racking systems and associated uncovered storage. All facilities include utilities, pavements, campus parking, site improvements, communications and all other necessary support.
Link to PIEE can be found here:: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HV23B0003
07 February 2023 Update: The Pre-Preposal slides, Pre-Proposal roster and Site Visit roster are hereby provided.
26 April 2023 Update: The bid due date is hereby extended to 2:00PM on 18 August 2023.
Update #4 ·
19 January 2023 Note: The AM0001 and attached Excel file for requesting site visit were successfully uploaded to PIEE portal.
18 January 2023 Update: W912HV-23-B-0003-AM0001 is released to add pre-bid conference information and revise site visit information. Please note, the amendment was not able to be uploaded to PIEE at the time of amendment release. The Government will upload them to PIEE at a later date when available. The files can be downloaded on SAM.gov for the time being.
AFSOC Squadron Operations / MRSP Parts Warehouse / Group HQ Facilities. Design-Bid-Build. Construct group and squadron operations facilities with concrete foundation and floor slab, steel frame, masonry walls and sloped metal roof. Functional areas include areas such as staff and administration, planning and briefing areas, mobility storage, life support/aircrew flight equipment storage and maintenance. Construct aircraft parts and Mobility readiness Spare Packages (MRSP) warehouse with associated external covered and uncovered storage elements. Concrete foundation and floor slab, steel frame, masonry and/or steel walls, sloped metal roof, structured for material handling equipment and racking systems and associated uncovered storage. All facilities include utilities, pavements, campus parking, site improvements, communications and all other necessary support.
Link to PIEE can be found here:: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HV23B0003
07 February 2023 Update: The Pre-Preposal slides, Pre-Proposal roster and Site Visit roster are hereby provided.
Update #3 ·
19 January 2023 Note: The AM0001 and attached Excel file for requesting site visit were successfully uploaded to PIEE portal.
18 January 2023 Update: W912HV-23-B-0003-AM0001 is released to add pre-bid conference information and revise site visit information. Please note, the amendment was not able to be uploaded to PIEE at the time of amendment release. The Government will upload them to PIEE at a later date when available. The files can be downloaded on SAM.gov for the time being.
AFSOC Squadron Operations / MRSP Parts Warehouse / Group HQ Facilities. Design-Bid-Build. Construct group and squadron operations facilities with concrete foundation and floor slab, steel frame, masonry walls and sloped metal roof. Functional areas include areas such as staff and administration, planning and briefing areas, mobility storage, life support/aircrew flight equipment storage and maintenance. Construct aircraft parts and Mobility readiness Spare Packages (MRSP) warehouse with associated external covered and uncovered storage elements. Concrete foundation and floor slab, steel frame, masonry and/or steel walls, sloped metal roof, structured for material handling equipment and racking systems and associated uncovered storage. All facilities include utilities, pavements, campus parking, site improvements, communications and all other necessary support.
Link to PIEE can be found here:: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HV23B0003
Update #2 ·
18 January 2023 Update: W912HV-23-B-0003-AM0001 is released to add pre-bid conference information and revise site visit information. Please note, the amendment was not able to be uploaded to PIEE at the time of amendment release. The Government will upload them to PIEE at a later date when available. The files can be downloaded on SAM.gov for the time being.
AFSOC Squadron Operations / MRSP Parts Warehouse / Group HQ Facilities. Design-Bid-Build. Construct group and squadron operations facilities with concrete foundation and floor slab, steel frame, masonry walls and sloped metal roof. Functional areas include areas such as staff and administration, planning and briefing areas, mobility storage, life support/aircrew flight equipment storage and maintenance. Construct aircraft parts and Mobility readiness Spare Packages (MRSP) warehouse with associated external covered and uncovered storage elements. Concrete foundation and floor slab, steel frame, masonry and/or steel walls, sloped metal roof, structured for material handling equipment and racking systems and associated uncovered storage. All facilities include utilities, pavements, campus parking, site improvements, communications and all other necessary support.
Link to PIEE can be found here:: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HV23B0003
Update #1 ·
AFSOC Squadron Operations / MRSP Parts Warehouse / Group HQ Facilities. Design-Bid-Build. Construct group and squadron operations facilities with concrete foundation and floor slab, steel frame, masonry walls and sloped metal roof. Functional areas include areas such as staff and administration, planning and briefing areas, mobility storage, life support/aircrew flight equipment storage and maintenance. Construct aircraft parts and Mobility readiness Spare Packages (MRSP) warehouse with associated external covered and uncovered storage elements. Concrete foundation and floor slab, steel frame, masonry and/or steel walls, sloped metal roof, structured for material handling equipment and racking systems and associated uncovered storage. All facilities include utilities, pavements, campus parking, site improvements, communications and all other necessary support.
Link to PIEE can be found here:: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HV23B0003
Files
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| FY 22 Airfield Damage Repair Equipment Storage Facility | Award Notice | |
| This notice | Solicitation | |
| FY23 AFSOC103008, Squadron Operations / MSRP Parts Warehouse / Group HQ Facilities, Yokota Air Base, Japan | Pre-Solicitation | |
| FY 22 Airfield Damage Repair Equipment Storage Facility | Solicitation | |
| FY 22 Airfield Damage Repair Equipment Storage Facility | Pre-Solicitation | |
| ADR & AFSOC Squad Ops/WH - Yokota | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FY26 ZNRE224305P3 Improve Military Family Housing PAIP 9 Phase 3, Yokota Air Base, Japan | ENDIST Japan | No set-aside | |
| Vehicle Maintenance Shop, Kadena Air Base, Okinawa, Japan | ENDIST Japan | No set-aside | |
| DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan | ENDIST Japan | No set-aside | |
| FY2026 - FY2027 Projections | ENDIST Japan | No set-aside | |
| Renovate military family housing tower 4511, camp courtney | ENDIST Japan | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity