DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan

Open Solicitation Posted

Solicitation number
W912HV26RA009
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Yokota Air Base, Japan

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Japan seeks construction of a bulk fuel storage tank facility at Yokota Air Base, Japan, with proposals due January 25, 2027, at 1400 hours JST. Award will be made on a Lowest Price Technically Acceptable basis. Offerors must be local sources physically located and authorized to perform construction in Japan, holding either a Japanese civil construction (doboku isshiki koji) or architectural construction (kenchiku isshiki koji) license by the proposal due date.

Place of performance is Yokota Air Base, Fussa, Tokyo 197-8503, Japan. The project requires construction of one 100,000-barrel cut-and-cover JP-8 storage tank with a reinforced concrete pump house on top, containing four 600-gpm and one 50-gpm vertical turbine pumps; high-level valve, independent level alarms, and automatic tank gauging system hardware; piping, valves, vaults, and appurtenances connecting to an existing filter separator building; and a product saver tank. The tank structure will be steel with concrete outer wall and rolling cover; the pump house roof will be low-slope concrete with built-up roofing and overhangs.

Evaluation factors are Construction Experience (minimum of one project completed within 20 years with contract value YEN1 billion, involving new fuel facility construction with bulk storage tanks), System Supplier Subcontractor Experience (minimum of five projects within five years demonstrating systems for dispensing liquid petroleum fuel with pumps, controls, piping, and valves), Past Performance, and Price. The period of performance is 1,020 calendar days after Notice to Proceed, with liquidated damages of YEN615,000 per day of delay. The estimated project magnitude is between YEN7.5 billion and YEN15 billion. Construction material must be U.S. or designated country (Japan) manufactured. Requests for Information are due October 5, 2026, at 2359 hours JST via MS-Forms. The NAICS code is 237120, Oil and Gas Pipeline and Related Structures Construction; PSC is Y1NA, Construction Of Fuel Supply Facilities.

Notice text

5 versions

Update #5 · Latest ·

Update 19 October 2026: Updated RFI Response Report has been posted to PIEE.

Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE.

Update 14 September 2026: Attached Site Visit Roster.

Update 10 September 2026: Attached Pre-Proposal Conference Slides.

Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.

Update #4 ·

Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE.

Update 14 September 2026: Attached Site Visit Roster.

Update 10 September 2026: Attached Pre-Proposal Conference Slides.

Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.

Update #3 ·

Update 14 September 2026: Attached Site Visit Roster.

Update 10 September 2026: Attached Pre-Proposal Conference Slides.

Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.

Update #2 ·

Update 10 September 2026: Attached Pre-Proposal Conference Slides.

Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.

Update #1 ·

Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
DESC2103C - Bulk Fuel Storage Tanks Phase II Yokota Air Base, Japan Pre-Solicitation
DESC2103C - Bulk Fuel Storage Tanks Phase II Yokota Air Base, Japan Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
FY26 ZNRE224305P3 Improve Military Family Housing PAIP 9 Phase 3, Yokota Air Base, Japan Yokota Air Base, Japan · NAICS 236220 ENDIST Japan No set-aside
Market Intelligence - Progressive Design-Build - Blood Donation Center Japan · NAICS 236220 ENDIST Mobile No set-aside
Vehicle Maintenance Shop, Kadena Air Base, Okinawa, Japan Kadena Air Base, Okinawa, Japan · NAICS 236220 ENDIST Japan No set-aside
Tank,liquid storage Construction and Equipment No set-aside