W912HV23B0003-0004.pdf
PDF 375 KB Posted
- Attached to
- FY23 AFSOC103008, Squadron Operations / MSRP Parts Warehouse / Group HQ Facilities, Yokota Air Base, Japan
- Solicitation number
- W912HV23B0003
About this file
This is a contract modification document for Federal Solicitation Number W912HV23B0003 for FY23 AFSOC103008 at Yokota Air Base in Japan. The modification revises specifications and drawings for the construction of group and squadron operations facilities, an aircraft parts warehouse, and mobility readiness spare packages storage. Revisions include updated sections and drawings for site work, utilities, foundations, structures, and mechanical, electrical, and communications systems. The proposal due date is unchanged. The solicitation involves design-build construction by the Department of the Army Corps of Engineers Engineering District Japan to build concrete and steel facilities with functional areas for staff, operations, storage, and maintenance at Yokota Air Base.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY23 AFSOC103008, Squadron Operations / MSRP Parts Warehouse / Group HQ Facilities, Yokota Air Base, Japan
See Block 14 Continuation Page(s)
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HV23B0003
X 9B. DATED (SEE ITEM 11)
12-Jan-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-May-2023
CODE
CONTRACTING DIVISION
JAPAN DISTRICT, U.S. ARMY CORPS OF ENGINEERS
RM 147, BLDG. 250
CAMP ZAMA
ZAMA 252-8511
JAPAN
W912HV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HV23B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
A. CHANGES TO SPECIFICATIONS – The amendment mark “AM-0004” is shown on each page of the amended specification section(s).
(1) Revised Section(s) and Revised Section Attachment(s) to Project Specifications. Attached hereto are the following revised section(s) and revised section attachment(s) to the specifications. Revised section(s) replace like numbered section(s) in the subject solicitation specifications, though some existing section attachment(s) pertaining to these sections remain in effect, as identified below. Revised section attachment(s) replace like-numbered section attachment(s) in the subject solicitation specifications.
Changes are indicated by a red line in the left margin of revised areas. All portions of the revised section(s) and revised section attachment(s) shall apply whether or not changes have been indicated.
Revised Specification Section(s):
01 50 00, Section 3.5.10.1.4 01 50 00, Section 3.5.10.6 01 50 00, Section 3.5.10.7 14 21 23, Section 1.2 23 03 00.00 20, Section 1.1 23 03 00.00 20, Section 3.1.1 23 07 00, Section 3.2.1.1 23 09 00, Section 1.10.1.1 23 09 00, Section 1.10.1.2 23 23 00, Section 2.6 23 30 00, Section 2.5 26 05 71.00 40, Section 2.2.1.3 26 05 71.00 40, Section 2.3.1 26 20 00, Section 1.1 26 20 00, Section 1.3 26 20 00, Section 2.7.4 26 20 00, Section 2.11 26 20 00, Section 2.12 26 20 00, Section 2.13.3.2 26 20 00, Section 2.18 26 20 00, Section 2.31 26 20 00, Section 3.1.2 26 20 00, Section 3.1.5.5 26 20 00, Section 3.5.6 26 24 13, Section 2.6 26 51 00, Section 1.7.1.1 26 51 00, Section 1.7.1.2 33 71 02, Section 1.4 33 71 02, Section 2.16
Revised Attachment(s):
None
(2) Added Section(s). The following section(s) are attached hereto and added to the specifications:
Added Section(s):
None
(3) Deleted Section(s). The following section(s) are deleted entirely from the specifications:
Deleted Section(s):
14 21 23, Section 1.4 23 09 00, Section 3.7
(3) Deleted Specification(s). The following specification(s) are deleted entirely:
Deleted Specification(s):
12 93 00 26 20 20 2.2.9 26 28.00 10 26 28 21.00 40 26 29 23
B. CHANGES TO DRAWINGS (ISSUED) – The amendment mark “AM-0004” is shown on each sheet of the amended drawing sheet(s).
(1) Revised Sheet(s) to Drawings. Attached hereto are the following revised sheets to the drawings. Revised sheets will replace like-numbered sheets in the subject solicitation drawings. Changes are indicated in revision clouds. All portions of the revised sheet(s) shall apply whether or not changes have been indicated.
Revised Sheet(s) to Drawing:
G-100 G-101
ES-503
3S-511 3S-607 3A-401 3A-601 3A-602 3I-201
3FA101
3FA601
3P-504 3E-001
3EP201
3EP202
3E-401 3E-603 3E-604 4A-121 4A-132 4A-201 4A-301 4A-511 4A-601 4A-602 4I-201
4FA601
4P-504 4E-001
4EP201
4E-602 4E-603 5S-102A 5A-121B 5A-431 5A-601 5A-602 5I-201A 5I-201B 5I-710 5I-711
5FA601
5P-503 5E-001
5EG201
5EP201A
5EP201B
5EY301A
5E-501 5E-603
(2) Added Sheet(s) to Drawings. Attached hereto are the following added sheets to the drawings:
Added Sheet(s) to Drawings: (None)
(3) Deleted Sheet(s). The following sheet(s) are deleted entirely from the drawings:
Deleted Sheet(s) to Drawings: (None)
C. All questions and the Government responses regarding this solicitation are to be viewed through the web-based program “Bidder Inquiry Module”. This program is located on the internet and can be accessed at https://www.projnet.org/projnet. Answers provided to the respective questions through the ProjNet do not amend the solicitation (specifications, drawings, etc.) unless revision to the specifications or drawings is specifically noted and incorporated into the solicitation via an amendment.
D. "As-Built" drawings are provided for informational purposes only. These "As-builts" drawings are not part of the solicitation (and will not become part of the contract) and do not amend the solicitation (specifications, drawings, etc.). "As-builts" drawings may not be complete or depict existing conditions. The contractor will be responsible for verifying actual conditions at the site.
F. The proposal due date and time is unchanged.
G. FAR Clause 52.211-14 is hereby incorporated by full text.
H. FAR Clause 52.211-15 is hereby incorporated by full text.
I. DFARS Clause 252.232-7017 is hereby removed from this solicitation.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by full text:
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be DX rated order; DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]
(End of provision)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
(End of clause)
The following have been deleted:
252.232-7017 Accelerating Payments to Small Business Subcontractors--
Prohibition on Fees and Consideration
APR 2020
(End of Summary of Changes)
File details come from the government source that posted it. Updated .