Foster electrical reliability upgrades

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W9127N20R0060
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Sweet Home, Oregon 97386, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Portland District seeks to replace aging electrical equipment at Foster Dam and Powerhouse through solicitation W9127N21R0060. Work includes replacing existing 4160V and 480V switchgear, station service equipment, transformers, motor control centers, DC system batteries, preferred AC equipment, and related components. Proposals will be evaluated on technical qualifications, past performance, and price, with award made to the offeror presenting the best value. The closing date for all questions is August 26, 2021, with proposals due by September 9, 2021.

The solicitation has no set-aside designations. The primary NAICS code is 238210 and PSC code R499 for electrical work. Site visits were held on August 16, 2021 with seven firms represented. The estimated value is between $5-10 million to replace components exceeding 40 years old at the 1960s-era facility located in Sweet Home, Oregon, to be completed within 18 months of award.

Notice text

2 versions

Update #2 · Latest ·

THE NOTICE ID FOR THIS SOLICITATION IS W9127N21R0060

Please refer to https://sam.gov/opp/031f9333839f441faa94cf26f6e0cebb/view

for the corrected posting. 

Foster Dam and Powerhouse was constructed in the 1960s and most of the electrical equipment throughout the facility is over 40 years old. While there does not appear to be a standard expected design life for electrical equipment, the industry standard is 35 to 40 years. Some of the factors that affect the expected design life are equipment loading, maintenance, and environmental factors. As such, most of the electrical equipment in the Foster powerhouse should be considered for replacement. Replacement of the existing air blast main unit breakers; new station service equipment, new station service transformers, and new powerhouse motor control centers are recommended.

The U. S. Army Corps of Engineers (USACE), Portland District, requires a contractor to replace the existing 4160 V switchgear (including the original air blast main unit breakers with vacuum breakers); replace the existing 480 V double ended-switchgear (including new station service transformers); new powerhouse motor control centers; replacement of powerhouse 480 V CQ panels; the DC system (including new station battery); preferred AC equipment; related protection and controls; new wiring for power, protection, controls, annunciation and ancillaries.

Update #1 ·

Foster Dam and Powerhouse was constructed in the 1960s and most of the electrical equipment throughout the facility is over 40 years old. While there does not appear to be a standard expected design life for electrical equipment, the industry standard is 35 to 40 years. Some of the factors that affect the expected design life are equipment loading, maintenance, and environmental factors. As such, most of the electrical equipment in the Foster powerhouse should be considered for replacement. Replacement of the existing air blast main unit breakers; new station service equipment, new station service transformers, and new powerhouse motor control centers are recommended.

The U. S. Army Corps of Engineers (USACE), Portland District, requires a contractor to replace the existing 4160 V switchgear (including the original air blast main unit breakers with vacuum breakers); replace the existing 480 V double ended-switchgear (including new station service transformers); new powerhouse motor control centers; replacement of powerhouse 480 V CQ panels; the DC system (including new station battery); preferred AC equipment; related protection and controls; new wiring for power, protection, controls, annunciation and ancillaries.

Files

Show all 14

Notice history

Notice Type Posted
Foster electrical reliability upgrades Award Award Notice
Foster electrical reliability upgrades Latest solicitation Solicitation
This notice Solicitation
Foster electrical reliability upgrades Pre-Solicitation
John Day Turbine Rehabilitation Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning Foster Dam, Linn County, Oregon 93745 · NAICS 237990 ENDIST Portland Total Small Business
John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 Location and Access Details. Oregon Side Physical Access, Near Rufus, OR 97050 accessible via I-84, Exit 109. Washington Side (Closest Town), Goldendale, WA 98620 approximately 20 miles north across the river. River Location, Mile 216.6 on the Columbia River, joining Sherman County, Oregon, and Klickitat County, Washington. 98628 · NAICS 237990 ENDIST Portland No set-aside
John day DAM unit 10 packing box replacement John Day Dam, Sherman County, Oregonthe John Day Dam On The Columbia River Between Sherman County, Oregon, And Klickitat County, Washington. Rufus, Oregon 97050, United States · NAICS 237990 ENDIST Portland No set-aside
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT Mansfield Center, Connecticut, United States · NAICS 238290 ENDIST New England Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity