John Day Turbine Rehabilitation
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9127N20R0060
- Agency
-
ENDIST Portland
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
- Place of performance
- Wasco OR 97065 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks responses from contractors interested in a supply and installation project to rehabilitate sixteen turbine generator units at the John Day Lock and Dam located on the Columbia River between Oregon and Washington. The U.S. Army Corps of Engineers is seeking to procure replacement of turbine runners, generator rewinds, and other associated work. Respondents must demonstrate experience with projects valued between $50-200 million involving hydraulic design, turbine component manufacturing and installation, and generator work. Responses are due by July 31, 2020 and must include the contractor's small business status, descriptions of up to three similar past projects, and the percentage of work to be self-performed.
The NAICS code for this procurement is 237990 and there is no set-aside designated. The estimated value of the contract is over $500 million to replace the turbine runners and rewind the generators of the existing sixteen units, each with a rating of 212,400 horsepower. Replacement turbines will be designed to improve fish passage while balancing performance, and may include adjustable-blade or fixed-blade designs. Responses to this pre-solicitation notice will be used for acquisition planning purposes only and do not constitute a commitment by the Government.
Notice text
2 versions
Update #2 · Latest ·
- General. This is a SPECIAL NOTICE and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2.
Notice Details. The U.S. Army Corps of Engineers (USACE), Northwestern Division, Portland District (NWP) is seeking industry input as it evaluates project risks, industry capabilities, and the potential acquisition strategy for a major rehab at John Day Dam on the Columbia River. The project is titled, “John Day Dam Turbine Replacement and Generator Rewind”.
The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990, “Other Heavy and Civil Engineering Construction”. The related size standard is $39.5M.
Project Site Background/Scope. The purpose of this requirement is to provide a hybrid design, manufacturing, and construction type contract with an estimated magnitude of over $500,000,000 for the turbine runner replacement and generator rehabilitation of up to sixteen turbines and generators and John Day Dam, spanning the Columbia River between Washington and Oregon.
The goals of the project are to address decreasing reliability and efficiency of the hydroelectric generating units and to maximize the net economic benefits over the next several decades, while maintaining an acceptable level of operational flexibility, all within the hydraulic and environmental constraints imposed on the project. Economic benefits will be realized through increasing reliability and efficiency of the hydroelectric generating units after replacing existing turbines with improved fish passage turbines that provide improved power generating efficiency, rewinding the generators, and replacing and refurbishing other powertrain equipment. The design of the state-of-the-art turbines will be an iterative and collaborative process that focuses on improved fish passage design features and criteria to improve survival of turbine-passed fish. Finally, this project will decrease the risk of oil entering the water passageway and river through improved sealing technologies, design considerations for new adjustable-blade turbine runners, and the introduction of some fixed-blade turbine runners.
Anticipated period of performance: Portland District anticipates soliciting the requirement in 02/2023 for a contract award in 12/2023. The contract will include three main stages of performance: design, manufacture/fabrication, installation/on-site work. These stages will begin in approximately 2024 for a period which could exceed fifteen years.
Acquisition Strategy Methods and Considerations. A similar requirement (McNary Turbine Replacement) was awarded by USACE as a Fixed-Price “C” type contract with economic price adjustment. Portland District is considering the use of a Single Award Task Order Contract (SATOC). The following is a limited description of how each strategy would be utilized and considerations the Government is evaluating:
Fixed-Price Contract w/ EPA – The Government, at time of contract award, would have a defined requirement with optional CLINs which may or may not be exercised dependent upon final design elements. Each CLIN would include a schedule and scope, each which may require modification should there be changes in either.
SATOC – The Government, at time of award, would include the defined work on the base SATOC. Through performance it would issue task orders for particular functions defined on the base SATOC. At award, it would issue a task order for a, “minimum guarantee,” simultaneous with a task order for the design phase. Additional task orders would be issued by the Government as it determined appropriate based on the schedule. As the majority of work would not be issued at the time of contract award, changes in schedule or the requirement may not require modification; they would be defined by the task order at time of task order issuance. Provisions for economic price adjustment dependent on when task orders were issued would be included in the SATOC.
Communications for Industry. Portland District is interested in feedback from interested firms capable of performing as a prime contractor on the requirement, particularly in relation to the following questions. Firms must follow the submission instructions below to coordinate a date and time for a one-on-one, which Portland District will host via teleconference or Webex meeting, to discuss concerns that that firm sees for the requirement, the firm’s capabilities, and any recommendations.
Portland District Questions:
- In developing the requirement, what information can the Government provide to industry to assist in developing the best possible pricing? Specifically, is there a minimum number of turbine refurbishments required to address economies of scale?
- With a contract of this length, the Government anticipates using an Equitable Price Adjustment clause to accommodate any potential increased prices.
- With a SATOC method, the Government would request offerors to provide pricing in “today’s dollars” in a price book for future task orders to include a breakout of percentage labor and percentage material. Using the Bureau of Labor Statistics industry standard WPU101707 for Steel and WPU102403 for Secondary Copper, alloyed and unalloyed, the Government would consider escalating those prices based on changes to those market indexes. To accommodate labor changes, the Government would use the Wage Rate Requirements (Construction), formerly known as the Davis-Bacon Act. A specific labor category would be selected as a “yardstick” and, should that wage rate increase, the Government would consider escalating prices accordingly.
- With a stand-alone “C” type contract, the Government would only consider escalation on materials and would only consider escalating prices if the Bureau of Labor Statistics industry standard WPU101707 for Steel and WPU102403 for Secondary Copper, alloyed and unalloyed increased by such an amount that the total contract value would increase by 3% or more.
What concerns, if any, does industry see with escalation and not knowing specific construction dates at contract award?
- The final weights and sizes for some components of the installation will be unknown at time of contract award. Final weights and sizes will be determined through the iterative design process between the Contractor and the Government. For the items in question, the Government is considering calling out specific component weights to be assumed by the bidder at solicitation to ensure an apples-to-apples comparison across bids. Should the final weights upon completion of design vary, the prices will be adjusted accordingly. What issues does industry foresee with this approach?
- Knowing the scope as provided, how much time does industry anticipate between finalization of design and delivering all new components onsite? Are there any financial implications associated with long-lead items and early coordination with foundries? If so, how significant are they?
- The Government is considering advertising for 90 days. Is this enough time to develop a proposal for a project of this magnitude?
- Would your firm consider not submitting a proposal should the Government select a single award task order type acquisition plan? Would your firm consider not submitting a proposal should the Government select a “C” type acquisition plan?
Portland District will schedule one-on-ones on a rolling basis as it receives responses to this announcement. This announcement closes March 29th, 2021 at 10 AM PST. Portland District hopes to conclude all one-on-ones by close of business March 31st, 2021.
Submission Instructions. To be offered a one-on-one, interested parties must contact both POCs listed on this announcement via email, in the following format:
SUBJECT: “JD TRGR – One-on-one Request”
CONTENT: Firm name and CAGE code, responses to the questions included in section 5 (recognizing further detail may be discussed during a one-on-one), and any questions, recommendations, or concerns the firm has which may influence the acquisition strategy.
*PLEASE NOTE: The Government will use responses to the questions in section 5 and information discussed in one-on-ones for it’s own purposes and in making decisions concerning the acquisition strategy, but no responses will be released publicly. The Government will use the responses to the questions to determine if a contractor is capable of performing as a prime contractor on the requirement and should be offered a one-on-one
Disclaimer. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Special Notice or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted.
Update #1 ·
A market survey is being conducted to assist the Government in determining the best possible acquisition strategy for this procurement. If your firm is interested in this project, please respond appropriately.
Project Location: John Day Lock and Dam, OR / WA
Project Description: A Supply with Install project for the rehabilitation of up to sixteen turbine generator units at John Day Lock and Dam. This project will include turbine runner replacements, generator rewinds, and other associated work. The scope will include all disassembly, reassembly, and testing of the turbine generating units as required to replace the turbine runner, rewind the generator, and complete other associated work. The replacement turbines will be state-of-the art and will be designed to improve fish passage through the turbine environment. The Turbine Replacement Generator Replacement (TRGR) turbine design will include an iterative and collaborative design effort between the Government and Contractor to improve fish passage survival while also balancing performance. At this time, both adjustable-blade and fixed-blade turbine runner types are planned to be installed. The existing sixteen turbines have a rating of 212,400 hp. The generator stator windings will be replaced to accommodate a rating of 170 MVA with a 0.95 power factor and 13,800 volts. The existing sixteen main unit generators have a rating of 163.4 MVA with a 0.95 power factor and 13,800 volts. There is potential for replacement of the stator cores, reinsulating of field poles, and other generator work to be included. Successful bidders shall be familiar with widely accepted and generally acknowledged successful practices for local construction.
The estimated cost range is over $500,000,000.00. NAICS code is 237990. All interested contractors should respond to this survey via email by Friday, July 31, 2020 at 10:00 AM Pacific Standard Time.
Responses should include:
- Identification and verification of the company’s small business status.
- Contractor’s DUNs Number(s) and CAGE Code(s).
- Point of contact for a brief phone survey to be conducted at the close of the market survey.
- Description of Experience – Provide descriptions of your firm’s past experience on NO MORE than THREE (3) projects with greater than 90% construction completion or projects completed within the last fifteen years which are similar to this project in size and scope. Provide documentation demonstrating hydroelectric construction experience and managing multiple sub-contractors. Demonstrate experience including self-performing at least 15% of the construction.
- Projects similar in Scope to this project include: Hydraulic design, modeling, and analysis experience; runner component design, manufacture, and installation experience; and unit stator winding design, manufacture and installation experience.
- Projects similar in size to this project include: Significant turbine and generator repair projects valued between $50,000,000 and $200,000,000.
- Based on definitions above, for each project submitted include:
- Current percentage of construction complete and the date when it was or will be completed.
- Size of the project.
- Scope of the project.
- The dollar value of the contract.
- The percentage of work that was self-performed.
- Identify the number of subcontractors by trade utilized for each project.
- Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished.
NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed.
Email responses and any questions to Kristina Morrow at Kristina.k.morrow@usace.army.mil. This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately for responses to this market survey.
NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought.
All contractors must be registered in the System for Award Management (www.beta.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website https://www.beta.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from www.beta.SAM.gov. Refer to www.beta.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.
Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.
ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.
Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.
Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM.
To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
Files
| File | Type | Posted |
|---|---|---|
| Industry Survey.docx | DOCX document | |
| Market Survey Document.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Foster electrical reliability upgrades | Award Notice | |
| Foster electrical reliability upgrades | Solicitation | |
| Foster electrical reliability upgrades | Solicitation | |
| Foster electrical reliability upgrades | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 | ENDIST Portland | No set-aside | |
| John day DAM unit 10 packing box replacement | ENDIST Portland | No set-aside | |
| John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007) | ENDIST Portland | No set-aside | |
| Navigation lock tainter valve (TV) repair, TV1 | ENDIST Portland | No set-aside | |
| LLA Navigation Lock Switchgear | ENDIST Walla Walla | Total Small Business |