DK Heart Butte Dam Safety Modification

Closed Solicitation Posted

Solicitation number
140R6026R0004
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Interior Bureau of Reclamation seeks a contractor to perform comprehensive dam safety modifications at Heart Butte Dam, located approximately 80 miles west of Bismarck, North Dakota, with proposals due June 18, 2026 at 12:00 Mountain Time. This is a firm fixed-price procurement under Part 15 of the FAR with no set-aside, open to full and open competition.

The NAICS code is 237990 (Other Heavy and Civil Engineering Construction) with a small business size standard of $45 million. Estimated project value exceeds $10 million. The period of performance runs from December 31, 2026 through June 30, 2030, with work to commence within 10 calendar days of notice to proceed and completion required within 1,277 calendar days, subject to liquidated damages of $15,789.47 per calendar day of delay (maximum $1,500,000).

Scope encompasses jet grouting treatment of the spillway and outlet works conduit (minimum unconfined compressive strength 300 psi and permeability 1.0E-06 cm/sec at 28 days), backfill grouting, concrete demolition and repair of outlet works, excavation of approximately 20,000 cubic yards, installation of filter systems and drainage infrastructure (1,100 linear feet of 12-inch perforated HDPE pipe, 440 linear feet of 12-inch nonperforated, and 250 linear feet of 18-inch nonperforated), embankment construction with multiple soil zones, mechanically stabilized earth wall installation, riprap placement, dewatering and unwatering systems across four construction phases with deep wells and observation wells, temporary cofferdam and channel crossing construction, and site restoration and revegetation across 17.5 acres. The contractor must design and install a temporary conduit shoring system capable of sustaining 600 cubic feet per second of discharge flow.

Mandatory site visit is scheduled for April 28, 2026. Offers require 20 percent bid guarantee or $8 million (whichever is less), and performance and payment bonds within 10 days of award. Insurance requirements include workers' compensation ($100,000 minimum), general liability ($500,000 per occurrence), and automobile liability ($200,000 per person/$500,000 per occurrence). All contractor personnel must comply with a government-issued identification and background check site security program.

Proposals must be submitted electronically via Kiteworks in four separate volumes: Business Proposal (Representations, Certifications, and Offer), Technical Proposal/Past Performance, Small Business Subcontracting Plan, and Price Proposal. Government acceptance deadline is 180 calendar days after proposal due date. Evaluation factors in order of importance are Technical Plan for Construction (Work Plan Narrative and Construction Schedule), Project Management/Quality Control/Safety Plans, Experience with similar projects, Past Performance (via CPARS reports and Past Performance Questionnaires), and Small Business Participation (weighted equally), with Price as the least important factor. DOI small business subcontracting goals are 45.87% small business overall, 5% small disadvantaged business, 5% women-owned small business, 5% service-disabled veteran-owned small business, 3% HUBZone, and 3% Indian Small Business Economic Enterprise.

Construction wage rate requirements apply for Grant County, North Dakota. Contractors must register in the System for Award Management (SAM) prior to submittal and use the Invoice Processing Platform (IPP) for payment requests. Work is subject to Reclamation Safety and Health Standards, OSHA requirements, environmental protection standards, water pollution control, and protection of historical and archaeological resources. Amendment 0006 (effective June 3, 2026) extended the deadline solely because Kiteworks was offline June 17, 2026, 15:00–17:00 MT. Contracting Specialist is Mitchell Frost; Contracting Officer is Travis Stephens.

Notice text

7 versions

Update #7 · Latest ·

DK Heart Butte Dam Safety Modification

Amendment 0006 is issued solely to extend the deadline for proposal submittals to June 18, 2026, at 1200 MT because Kiteworks will be offline on June 17, 2026, from 1500-1700MT.

Update #6 ·

DK Heart Butte Dam Safety Modification

Please see the attachments entitled "140R6026R0004 - Amendment No. 0005" for all details related to solicitation amendment 0005.

Update #5 ·

DK Heart Butte Dam Safety Modification

Please see the attachments entitled "140R6026R0004 - Amendment No. 0004" for all details related to solicitation amendment 0004.

Update #4 ·

DK Heart Butte Dam Safety Modification

Please see the attachments entitled "140R6026R0004 - Amendment No. 0003" and "Pre-bid Site Visit Presentation" for all details related to solicitation amendment 0003.

Update #3 ·

DK Heart Butte Dam Safety Modification

Please see the attachments entitled "Solicitation 140R6026R0004 0002 4.24.26" and "03B_00 00 02_Drawings 11x17 4.23.26" for the full solicitation details.

Please also see the following attachments for more supporting documentation relating to this solicitation:
Geology Package_Rev 04-21-26
8530-2018-54_Geotech Lab_Conduit Sediment
8550-2020-06_Heart Butte Dam Lab Testing Report
8550-2024-25_Heart Butte FD Borrow
TM 8550-2025-02 Geotechnical Laboratory in Support of Final Design Modifications Heart Butte Dam
Heart Butte Dam 2024 Final Design Geologic Investigations

A copy of the 2018-2021 Heart Butte Dam Corrective Action Study Geologic Exploration Report and the Revised Geology Package (4.21.2026) can be requested from the Contracting Specialist at mitchell_frost@ios.doi.gov.

Update #2 ·

DK Heart Butte Dam Safety Modification

Please see the attachments entitled "Solicitation 140R6026R0004 0001 4.14.26" and "03B_00 00 02_Drawings 11x17" for the full solicitation details.

A copy of the 2018-2021 Heart Butte Dam Corrective Action Study Geologic Exploration Report can be requested from the Contracting Specialist at mitchell_frost@ios.doi.gov.

Update #1 ·

DK Heart Butte Dam Safety Modification

Please see the attachments entitled "Solicitation 140R6026R0004 4.13.26" and "03B_00 00 02_Drawings 11x17" for the full solicitation details.

A copy of the 2018-2021 Heart Butte Dam Corrective Action Study Geologic Exploration Report can be requested from the Contracting Specialist at mitchell_frost@ios.doi.gov.

Files

Show all 22

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
DK Heart Butte Dam Safety Modification Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
White Horse Hill National Game Preserve Water Main Extension NAICS 237110 — Total Small Business
ND NP THRO 204(1) Buck Hill Road Medora, North Dakota, United States · NAICS 237310 Federal Highway Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity