Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement)

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
70Z04724RPCNI0007
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
San Juan, Puerto Rico 00901, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This federal contract opportunity is for a design-build construction project to rebuild resilient shore facilities at the U.S. Coast Guard Sector San Juan in Rio Bayamon, Puerto Rico that were damaged during Hurricane Maria. The Department of Homeland Security U.S. Coast Guard is procuring these services. The project's key requirements include the installation of a new campus-wide generator system, a new water storage tank with pump and distribution, and other infrastructure and utility upgrades. The solicitation will be evaluated on a best value trade-off basis considering factors such as underground utilities, procurement of labor and materials, and the contractor's technical approach. Proposals are due by September 10, 2024.

This is a Phase 1 re-procurement that is limited to contractors on the current DHS/USCG National Multiple Award Construction Contract III (NMACC III - Pool 1). The estimated project value range is $20M to $24M, and the period of performance is 389 calendar days after award. The place of performance is the U.S. Coast Guard Base in San Juan, Puerto Rico.

Notice text

6 versions

Update #6 · Latest ·

70Z04724RPCNI0007_Amendment 0005 

The purpose of Amendment 0005 is to

1. Establish an updated proposal submission deadline.

2. To provide respsonses to additional RFI's.

3. Provide revised verbiage to be incorporated into the 10878151 Speciication Document. (please see Amendment 0005 attachment). 

THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III – Pool 1).

This project is for design-build with the intention to rebuild to resilient standards shore facilities at U.S. Coast Guard Sector San Juan required as a result of damages sustained during Hurricane Maria. Phase 1 will consist of Infrastructure, Utilities Distribution and Resiliency for Rio Bayamon Housing Sites. Work shall include new campus wide generator system and distribution. A new water storage tank with pump and for distribution is included.

Update #5 ·

70Z04724RPCNI0007_Amendment 0004 

The purpose of Amendment 0004 is to establish an updated proposal submission deadline.

THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III – Pool 1).

This project is for design-build with the intention to rebuild to resilient standards shore facilities at U.S. Coast Guard Sector San Juan required as a result of damages sustained during Hurricane Maria. Phase 1 will consist of Infrastructure, Utilities Distribution and Resiliency for Rio Bayamon Housing Sites. Work shall include new campus wide generator system and distribution. A new water storage tank with pump and for distribution is included.

Update #4 ·

70Z04724RPCNI0007_Amendment 0003 with attachments. 

The purpose of Amendment 0003 is to publish responses to RFI's and to establish an updated Proposal submission deadline.

THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III – Pool 1).

This project is for design-build with the intention to rebuild to resilient standards shore facilities at U.S. Coast Guard Sector San Juan required as a result of damages sustained during Hurricane Maria. Phase 1 will consist of Infrastructure, Utilities Distribution and Resiliency for Rio Bayamon Housing Sites. Work shall include new campus wide generator system and distribution. A new water storage tank with pump and for distribution is included.

Update #3 ·

70Z04724RPCNI0007_Amendment 0002 with attachments. 

The purpose of Amendment 0002 is to extend the RFI submission deadline, to establish an updated Proposal submission deadline, and publish the Site visit attendance log.

THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III – Pool 1).

This project is for design-build with the intention to rebuild to resilient standards shore facilities at U.S. Coast Guard Sector San Juan required as a result of damages sustained during Hurricane Maria. Phase 1 will consist of Infrastructure, Utilities Distribution and Resiliency for Rio Bayamon Housing Sites. Work shall include new campus wide generator system and distribution. A new water storage tank with pump and for distribution is included.

Update #2 ·

70Z04724RPCNI0007_Amendment 0001 with attachments. 

THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III – Pool 1).

This project is for design-build with the intention to rebuild to resilient standards shore facilities at U.S. Coast Guard Sector San Juan required as a result of damages sustained during Hurricane Maria. Phase 1 will consist of Infrastructure, Utilities Distribution and Resiliency for Rio Bayamon Housing Sites. Work shall include new campus wide generator system and distribution. A new water storage tank with pump and for distribution is included.

Update #1 ·

THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III – Pool 1).

This project is for design-build with the intention to rebuild to resilient standards shore facilities at U.S. Coast Guard Sector San Juan required as a result of damages sustained during Hurricane Maria. Phase 1 will consist of Infrastructure, Utilities Distribution and Resiliency for Rio Bayamon Housing Sites. Work shall include new campus wide generator system and distribution. A new water storage tank with pump and for distribution is included.

Files

File Type Posted
Combined 70Z04724RPCNI0007 Rio Bayamon Phase I_RFI Log - responses v2.pdf PDF
Amendment_0005_70Z04724RPCNI0007 Rio Bayamon_pdf.pdf PDF
Amendment_0004_70Z04724RPCNI0007 Rio Bayamon_pdf.pdf PDF
SF30 70Z04724RPCNI0007 Rio Bayamon Phase 1_posted.pdf PDF
70Z04724RPCNI0007 Rio Bayamon Phase I_RFI Log - Responses.pdf PDF
_Amendment 0002 70Z04724RPCNI0007 Rio Bayamon Housing_.pdf PDF
Rio Bayamon Site Visit Attendance Log.pdf PDF
Amendment 0001 70Z04724RPCNI0007 Rio Bayamon Housing.pdf PDF
Rio Bayamon Housing Google Map.pptx PPTX presentation
TOA_Rio Bayamon Housing_San Juan_PR_updated.pdf PDF
Attachment B - ISCDS.pdf PDF
RFP1-10878151 Appendix B - ElectDeliv.pdf PDF
Attachment C - UFC Engine-Driven Gen Systems.pdf PDF
Attachment E - CSTO Electric Vehicle Support Equipment.pdf PDF
RFP1-10878151 Appendix C - Adept File Naming.pdf PDF
10878151 Specifications_Rio Bayamon Housing_San Juan_PR.pdf PDF
10878151 Drawings_Rio Bayamon Housing_San Juan_PR.pdf PDF
RFP1-10878151 Appendix D - Design Narrative.pdf PDF
General Decision No. PR 20240002_Heavy Construction_San Juan, PR.pdf PDF
RFP1-10878151 Appendix A - ComputerGenDrwgs.pdf PDF
RFP1-10878151 Appendix E - Industry Standards for Const Documents.pdf PDF
Attachment D - CSTO Advanced Metering Infrastructure.pdf PDF
Show all 22

Notice history

Notice Type Posted
Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement) Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design-Build Repair Storm Sewer Lines at U. S. Coast Guard Base San Juan, Puerto Rico Project Number: PN 15852459 San Juan, Puerto Rico, United States · NAICS 237110 — Service-Disabled Veteran-Owned Small Business
Major maintenance and repair UPH building 127 U.S. Coast guard base SAN juan, PR San Juan, Puerto Rico 00901, United States · NAICS 236220 — No set-aside
General Contractor for the Seismic Retrofit Project at the Clemente Ruiz Nazario U.S. Courthouse, San Juan, Puerto Rico San Juan, Puerto Rico 00918, United States · NAICS 236220 — No set-aside
SHI Replace Lead Glazed Bathtubs at United States Coast Guard Rio Bayamon Housing Base San Juan, Puerto Rico PNUM 24658602 San Juan, Puerto Rico, United States · NAICS 236220 — Service-Disabled Veteran-Owned Small Business
USCG regional multiple award construction contract (rmacc III) Juneau, Alaska, United States · NAICS 236220 Coast Guard No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors