This document is a Configuration Standard Technical Order (CSTO) that establishes the functional requirements for Electric Vehicle Support Equipment (EVSE) for the U.S. Coast Guard.

The CSTO provides guidance on EVSE planning factors, equipment requirements, operational requirements, and opportunities to improve renewable energy, resiliency, and advanced metering initiatives. It outlines requirements for prioritizing EVSE projects, siting factors, equipment standards, construction standards, electrical standards, PHEV and EV procurement, and EVSE maintenance. The CSTO applies to all new construction and replacement of existing EVSE classified under UNIFORMAT II G40100603. It also defines the roles and responsibilities of various Coast Guard organizations in establishing and implementing these EVSE standards.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base San Juan Hurricane Rebuild Rio Bayamon Housing – Infrastructure, Utilities, Resiliency

Project No. 10878151 Rio Bayamon, PR

Attachment E CSTO – Electric Vehicle Support Equipment

Mission Support Business Model

Configuration Standard

Technical Order

Facilities Operation

Branch

Electric Vehicle Support Equipment

SILC-CSTO-36-11 31 17 11-02

This page intentionally left blank.

Commander U.S. Coast Guard Shore Infrastructure Logistics Center

300 East Main Street, Suite 800 Norfolk, VA 23510-9104 Staff Symbol: (esd) Phone: (757) 628-4277

10390

28 September 2020

Subj: ELECTRIC VEHICLE SUPPORT EQUIPMENT CSTO

Ref: a) Civil Engineering Manual, COMDTINST M11000.11 (series)

b) Shore Infrastructure – Mission Support Business Model Requirements Directive

Technical Order, SILC-RDTO-36-11 29 11 00-01 (latest)

c) Federal Management Regulation §102-34, Motor Vehicle Management

d) Executive Order 13834 – Efficient Federal Operations

e) Energy Independence and Security Act of 2007

f) Energy Policy Act of 1992, Amended 2005 – Acquisition of Alternative Fuel

Vehicles

g) COMDTINST M11240.9D – Coast Guard Motor Vehicle Manual

h) Coast Guard Sustainability, Environmental, and Energy Policy Statement

i) Coast Guard Operational Sustainability Performance Plan (2019)

1. PURPOSE. This Configuration Standard Technical Order (CSTO) establishes configuration standards for Electric Vehicle Support Equipment (EVSE), UNIFORMAT II classification G40100603. This technical order establishes functional requirements that are not contained in other documentation. This technical order cites guidance for Coast Guard personnel responsible for EVSE infrastructure development or renovations to significantly reduce design time across the enterprise. This technical order is not a substitute for applicable code requirements.

2. ACTION. Facility Engineers (FE), Engineering Petty Officers (EPO), Civil Engineering Unit Design Engineers and Project Managers, as well as Contracting Officers overseeing the delivery of shore infrastructure projects for EVSE shall ensure compliance with the provisions of the technical order in accordance with references (a) and (b).

3. AUTHORIZATION. This technical order has been reviewed and is authorized by the SILC Commander.

4. DIRECTIVES / TECHNICAL ORDERS AFFECTED. There are no technical orders, manuals, or publications impacted by this CSTO.

5. ENVIRONMENTAL ASPECT AND IMPACT CONSIDERATIONS.

a. The general policies contained in this technical order are categorically excluded under current USCG categorical exclusion #L5 from further environmental analysis, in accordance with the U.S. Coast Guard Environmental Planning Policy, COMDTINST 5090.1 (series).

Subj: ELECTRIC VEHICLE SUPPORT EQUIPMENT CSTO

b. All future specific actions resulting from the general policies in this technical order must be individually evaluated for compliance with the National Environmental Policy Act (NEPA), Council on Environmental Quality NEPA regulations at 40 CFR Parts 1500-1508, DHS and Coast Guard Environmental Planning policy, and compliance with all other environmental mandates.

6. DISTRIBUTION. SILC Business Operations Division (BOD) posts an electronic version of this technical order in CG-TIMS and adds the document in the Approved Technical Order Library on SILC's Configuration Management site on the CG Portal. No paper distribution will be made of this document.

7. SCOPE. The standards described in this technical order shall be implemented in accordance the following constraints.

a. TECHNICAL AUTHORITY. The technical authority for this technical order is the

SILC Commander. Additional roles and responsibilities associated with this configuration standard are identified in Section 1.3 of this technical order.

b. ASSETS / SERVICES. This technical order applies to all Electric Vehicle

Support Equipment real property assets with the UNIFORMAT II classification G40100603.

8. TRAINING. Implementation of this technical order does not require training beyond standard Coast Guard requirements for personnel.

9. DEVELOPMENT TEAM. The following authorities and subject matter experts were significantly involved in producing this technical order.

Name Position Organization

LT Patrick Page Electric Vehicle Infrastructure Manager (Co-Author) SILC-ESD (fob)

LCDR Sarah Krolman Co-Author SILC-ESD (fob)

Mr. Donte Perry Facilities Operations Branch Chief SILC-ESD (fob)

LT Thomas Porzillo Motor Vehicle Product Line Manager SILC-ESD (fob)

Mr. Michael Duren Motor Vehicle Program Manager CG-435

Mr. Fred Sommer Deputy Division Chief SILC-ESD

Mr. Yamil Hernandez Energy Program Lead SILC-ESD Energy Group

10. FORMS / REPORTS. None.

Subj: ELECTRIC VEHICLE SUPPORT EQUIPMENT CSTO

11. REQUEST FOR CHANGES. Submit recommendations for technical order improvements, waivers, or corrections in accordance with the Engineering Change Proposal (ECP) PGTO.

T. WADE GESELE

Captain, U.S. Coast Guard

This page intentionally left blank.

i

TABLE OF CONTENTS

1 Overview

1.1 Configuration Standard Summary

1.2 Applicability

1.3 Roles and Responsibilities

2 Technical Requirements

2.1 Organization

2.2 Planning Factors

2.2.1 EVSE Prioritization

2.2.2 Siting Factors

2.3 Equipment Requirements

2.3.1 Equipment Standards

2.3.2 Construction Standards

2.3.3 Electrical Standards

2.4 Operational Requirements

2.4.1 PHEV and EV Procurement

2.4.2 EVSE Maintenance

2.4.3 EVSE Access Restrictions

2.5 Advanced Metering Infrastructure (AMI)

3 References

4 Definitions

Appendix A – EVSE Charging Port Requirements by Unit ................................................................. A-1

Appendix B – Sample Statement of Work ............................................................................................ B-1

1 OVERVIEW

1.1 Configuration Standard Summary

This Configuration Standard Technical Order (CSTO) establishes the functional requirements for Electric Vehicle Support Equipment (EVSE). This CSTO employs Shore Infrastructure Mission Support Business Model (SI-MSBM) to optimize resource allocation in support of Vehicle Program requirements. EVSE consists of electrical infrastructure designed to recharge Plug-in Hybrid Electric Vehicle (PHEV) and Battery Electric Vehicle (BEV) batteries in order to reduce or eliminate petroleum consumption. For the purposes of this CSTO, PHEV and BEV will be referred to jointly as Electric Vehicles (EV).

In accordance with Executive Order 13834, EPA Acts of 1992 and 2005, Energy Independence and Security Act of 2007, DHS directives and the Coast Guard’s Sustainability, Environmental and Energy Policy Statement and Operational Sustainability Performance Plan, the Coast Guard vehicle program must implement vehicle options that optimize fleet performance, lower greenhouse gas (GHG) emissions, and reduce costs. PHEV and BEV implementation are important components to achieving compliance with these mandates and guidelines. EVSE is a necessary first step towards the implementation of Government Vehicle (GV) transitions.

This CSTO outlines specific considerations of EVSE to include project prioritization, planning and siting factors, motorpool impacts, equipment standards, construction standards, electrical grid requirements, as well as operation and maintenance requirements. The CSTO further outlines opportunities to advance energy program initiatives related to resiliency, renewable energy inclusion, and advanced metering initiative requirements.

1.2 Applicability

This technical order applies to all new construction and replacement of existing Electric Vehicle Support Equipment classified by classified by UNIFORMAT II G40100603.

1.3 Roles and Responsibilities

The technical authority for this configuration standard is the SILC Commander. Table 1-1 enumerates the roles and responsibilities for establishing the standards defined in this technical order. The following “RASCI” codes are used:

R = Responsible: Those who do the work (typically only one Responsible per task).

A = Approver: The one ultimately accountable for the deliverable or task (must have only one Approver per task).

S = Supports: Those who provide resources, information, expertise or other assistance in completing of the task. A Supports role indicates more intensive and consistent involvement than just being identified in a Consulted role.

C = Consulted: Those whose opinions are sought (two-way communications).

I = Informed: Those who are kept up-to-date on progress (one-way communication).

Table 1-1: Roles and Responsibilities RASCI Matrix

Task, Deliverable, or Responsibility SI

LC

E

SD

FO

B

SI

LC

E

SD

E

NE

RG

Y

GR

OU

P

CG

-4

(E ne rg y P ro gr am

Of fic e of

F ac ili tie s O pe ra tio ns an d Su pp or t (C

G-

5)

Ci vil

W or ks A ss et

Li ne

Fa cil ity A ss et

M an ag er

FE

/E

PO

De sig n

En gin ee r

Re gi on al

M ot or Fl ee t M an ag er

Lo ca l M ot or V eh icl e M an ag er

Establish Configuration Standards R S I I C I I I

Assess Physical Baselines A I R Qualify and Prioritize EVSE Projects A/R C I I I I I I I I

Manage Equipment Installation S C I R S

Perform Maintenance S C R Provide Technical Authority R C I I I I I I Approve Deviations A/R C I I C I I

2 TECHNICAL REQUIREMENTS

2.1 Organization

This section describes EVSE planning factors, equipment requirements, operational requirements, and opportunities to further improve renewable energy and resiliency efforts as well as advanced metering initiatives.

2.2 Planning Factors

2.2.1 EVSE Prioritization

On an annual basis, SILC Engineering Services Division’s Facilities Operations Branch (SILC- ESD-FOB) shall review the number of EVSE charging ports required at all Coast Guard installations with 10 or more EV candidate vehicles. The current projected number of charging ports by site is listed in Appendix A. EV candidate vehicles are any leased vehicles for which General Services Administration (GSA) presently offers an EV option within the corresponding vehicle class (passenger vehicles and light duty sport utility vehicles) or forecasts availability of an EV option within the corresponding vehicle class within the next 10 years (light and medium duty trucks, as well as medium duty sport utility vehicles).

EVSE shall be prioritized to maximize return on investment. Units with 10 or more current EV candidates shall be considered for EVSE construction. Within this pool of units, local market conditions and demand signals shall be evaluated to ensure EV operator success. For example, while a unit has 17 current EV candidates, extreme winter weather in this location negatively impacts EV battery life expectancy, snow removal operations jeopardize potential infrastructure, and local market trends do not support off base EV charging. For these reasons, the example unit remains a low priority for EVSE investment despite their immediate pool of EV candidates.

Units with motorpools of fewer than 10 current EV candidates may be considered for EVSE investment based upon cost savings opportunities. Cost savings opportunities may come in the form of government rebates, state and utility company initiatives, as well as construction cost avoidance through the coordination of overlapping work packages. Civil Engineering Units (CEU) and Facilities Design and Construction Center (FDCC) design engineers should contact the EV Infrastructure Manager to ascertain if planned electrical and paving work packages overlap with future EVSE investment opportunities. For example, the Base Boston Major Acquisition Shore Infrastructure project included both paving and electrical upgrades. To prevent dual contractor mobilization as well as saw cutting, patching, and repaving newly installed asphalt, an AFC-43 funded unit work item for installation of EVSE was developed and released with the contract solicitation.

Benefits of saturating a geographic area of operation may further warrant EVSE investment at installations with smaller motorpools. Geographic saturation increases the electric range of EV such that PHEV fuel usage and emissions are minimized when commuting amongst area commands.

EVSE infrastructure shall be prioritized and constructed such that one charging port is provided for every 2.5 EV candidates. The number of EV candidates shall be based upon all vehicles assigned to an installation regardless of existing motorpool status and confirmed with SILC- ESD-FOB prior to the obligation of any funds associated with EVSE construction.

Appropriated funds shall not be used to fund the construction of EVSE to support personally owned vehicles. Employee demand signals for EVSE access shall not be considered when designing and prioritizing the number of charging ports to be installed.

SILC-ESD-FOB manages AFC-43 EVSE funding to further EV transition efforts through centralized prioritization, and management of a limited number of EVSE construction projects annually. Five-year EVSE project prioritization plans are available on the SILC-ESD-FOB Portal page.

In addition to these projects, SILC-ESD-FOB seeks to construct EVSE in conjunction with regularly scheduled CEU and FDCC construction projects. SILC-ESD-FOB should be consulted during the design phase of all major electrical and paving projects to ascertain viability of EVSE inclusion. If the project aligns with EVSE investment and funding priorities and possesses overlapping work packages, SILC-ESD-FOB will provide the EVSE scope of work as well as independent government estimate to be included in project solicitation as a unit bid item. AFC- 43 funding will be provided to cover the cost of the EVSE work package and may be transferred to the executing contracting office upon solicitation and/or award of the unit bid item at contracting office discretion. Additional supporting documentation for EVSE infrastructure can be found on the SILC-ESD-FOB Portal page:

CG Portal SILC Engineering Services Division Facilities Operations Branch

2.2.2 Siting Factors

All EV charging infrastructure at an installation shall be centrally located to minimize construction costs. In the case of installations possessing multiple commands, facilities engineering staffs and unit representatives will be consulted to identify a mutually beneficial location. Preference will be given to locations adjacent to electrical infrastructure capable of supporting EVSE and which minimize trenching and boring.

Equipment shall be sited to maximize vehicular access while minimizing construction costs.

Whenever feasible, each dual port charging station should be located to accommodate up to four parking spaces. At minimum, each dual port charging station shall serve two parking spaces. Parking lots should not be reconfigured solely for the purpose of accommodating EVSE siting.

https://cg.portal.uscg.mil/units/silc/ESD/FOB/Vehicle%20Program/motor-vehicle-fleet-management/EV%20Charging%20Infrastructure/Forms/AllItems.aspx https://cg.portal.uscg.mil/units/silc/ESD/FOB/Vehicle%20Program/motor-vehicle-fleet-management/EV%20Charging%20Infrastructure/Forms/AllItems.aspx https://cg.portal.uscg.mil/ https://cg.portal.uscg.mil/units/silc https://cg.portal.uscg.mil/units/silc/ESD https://cg.portal.uscg.mil/units/silc/ESD/FOB

Figure 2-1: Ideal Configuration to Support 12 PHEV and EV Candidates

Figure 2-2: Alternate Configuration to Support 12 PHEV and EV Candidates

2.3 Equipment Requirements

2.3.1 Equipment Standards

All EVSE shall be dual port AC level 2 as defined by Society of Automotive Engineers Standard J1772 (SAE J1772). Charging units shall be certified by a nationally recognized testing laboratory and meet the following standards:

a. SAE Standard J1772

b. UL Standard for Electric Vehicle Charging System Equipment; UL2202

c. UL Standard for Plugs, Receptacles and Couplers for Electric Vehicles; UL2251

d. UL Standard for Personnel Protection Systems for Electric Vehicle Supply Circuits;

UL2231

e. UL Standard for Enclosures for Electrical Equipment; UL50

Each level 2 charging station shall provide two SAE J1772 connectors and cord sets with a minimum length of 15 feet. Cable holders and connector docks shall be provided with charging units to keep charge cords off the ground and neatly stored between uses. Equipment may be wall or pedestal mounted.

Connectors must be able to function simultaneously, i.e. charge two vehicles at once. If electrical grid capacity is limited, power sharing functionality may be considered. Power share technology provides full power charging for one vehicle and splits power draw when two vehicles are connected, thus maximizing the number of available ports while minimizing peak EVSE energy demands. All EVSE shall be designed to use 208 volt/240 volt alternating current input.

Charging stations must include visual operational status indicators to include at minimum:

Ready to Charge, Charging, Complete, and Fault or equivalent. EVSE shall have built-in electric nuisance tripping avoidance and auto-reclosure features.

Charging stations must be capable of accepting direct payment via the WEX fleet fuel card.

Previously installed equipment that lacks this functionality shall remain in service until end of service life. At end of service life, charging stations that lack WEX fleet fuel card direct payment capability shall be recapitalized with equipment possessing this feature.

EVSE shall not require access to Coast Guard networks for connectivity or billing purposes.

Charging stations may utilize cellular data connections or an independent communications transmission service provided and installed by the manufacturer or contractor. There shall be no direct feed between EVSE and Coast Guard data systems. EVSE that provides usage and billing data via an independent website that can be accessed and/or managed from a Coast Guard work station are acceptable.

All equipment, parts, and materials shall be appropriate or protected in such a way as to be appropriate for outdoor use and continuous exposure to temperatures, humidity, and marine air characteristic of the local climate. At minimum, charging stations shall be rated to maintain consistent operations at ambient temperatures between 0 degrees Fahrenheit and 120 degrees Fahrenheit.

2.3.2 Construction Standards

The contractor shall be responsible for all design, procurement, fabrication, site assessment, site preparation, construction, testing, and any other work necessary for the proper installation and commissioning of EVSE when funded by an AFC-43 contract action.

The contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required by Federal Acquisition Regulations (FAR 5.236-13). The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. All standard construction safety clauses shall apply.

All work shall conform to relevant Federal, State, and regional codes and practices. EVSE construction and installation must specifically follow NFPA 70: National Electrical Code, 2020, Chapter 6: Special Equipment, ARTICLE 625 Electric Vehicle Power Transfer Systems.

The contractor shall be responsible for applying for and obtaining applicable certifications, licenses, and permits necessary for the installation and operation of EVSE. All electrical work shall be performed by an electrical contractor licensed in the state where work is to be performed. The contractor shall locate all water, storm, sanitary sewer, communication, power, fuel supply, natural gas, lighting, and any other utilities within ten feet of the proposed construction footprint. Proposed trenching, saw cutting, and/or boring shall be clearly marked in relation to all utilities prior to commencement of any excavation.

Electrical wires shall be routed through an approved conduit or jacket from the circuit panel to the charging unit or receptacle. Conduit runs immediately adjacent to the facility may be mounted. Electrical conduits shall be buried for any runs that cannot be mounted. Where conduit traverses paved surfaces, either boring or saw cutting is permissible. All surfaces damaged during construction shall be restored to pre-construction conditions.

The contractor shall install, test, commission, and provide training for all EVSE prior to acceptance. To ensure proper operation of equipment, the contractor shall oversee a test charge of an EV at each EVSE charging port following installation. Three written copies of equipment operations and maintenance instructions shall be provided.

Pedestal mounted charging stations shall include concrete foundations/charger pads with a top surface of consistent height. Minimum foundation/charger pad height is 2 inches above grade.

Concrete shall have compressive strength of 2,500 PSI at 28 days. American Concrete Institute Specification 301 (ACI 301) compliant forms for concrete placement shall be used. Typically, above grade exposed joints, edges, and external corners of concrete should be chamfered 0.75 inch. However, construction practices at each location should be considered to preserve standard aesthetic appearances.

All EVSE shall be protected with either raised footings, bollards, or vehicle parking stops. EVSE installed near or within normal traffic patterns shall be protected from vehicular impact by bollards. Bollards must have a minimum height of 4 feet above finished grade. Bollards should be constructed of 4-inch diameter schedule 80 galvanized steel pipe filled with concrete, painted safety yellow, and set at least 4 feet below grade. Bolted bollards lack sufficient impact resistance and shall not be utilized. Bollards shall be placed such that all charging stations are protected with a minimum of two bollards, one on each side of the EVSE at a distance of 24 inches on center away (side) and 12 inches on center forward of the EVSE it is protecting whenever practicable. Charging stations serving four parking spaces shall be protected with a minimum of four bollards, one on each side of the EVSE at a distance of 24 inches on center away (side) and 12 inches on center forward as well as at a distance of 24 inches on center away (side) and 12 inches on center behind the EVSE it is protecting whenever practicable.

Additional details are provided in Figure 2-3: Charging Station Layout.

All parking spaces served by EVSE shall be denoted as solely for the use of electric vehicles.

Installation of physical signs which indicate “Electric Vehicle Parking Only”, “Government Vehicle Parking”, or “Government and Electric Vehicle Parking” or equivalent verbiage are preferred. However, in order to preserve standard aesthetic appearances, pavement markings may be considered. If pavement marking is employed, all parking spaces served by EVSE shall have green parking lines with “GV/EV Only” or equivalent verbiage clearly stenciled using at minimum 10-inch letters.

All construction materials shall be appropriate or protected in such a way as to be appropriate for outdoor use and continuous exposure to temperatures, humidity, and marine air characteristic of the local climate. A sample statement of work is provided in Appendix B.

Figure 2-3: Charging Station Layout

2.3.3 Electrical Standards

The contractor shall evaluate the capacity of the facility's existing electrical distribution equipment and determine whether or not the existing electrical systems can support the new EVSE in accordance with the National Electrical Code and without causing electrical overload.

Construction shall commence only upon confirmation that existing electrical distribution system has sufficient capacity. Submit a One-Line Diagram of the existing base electrical distribution system to include a narrative of whether or not the existing base systems can support the

EVSE. Show electrical panels, switchboards, and/or transformers that will either support the new electrical equipment or will require upgrading. A registered professional engineer shall perform and submit an evaluation of the existing electrical load to the Coast Guard for review and acceptance prior to the start of any construction. Any modifications to the electrical distribution system necessary to support proposed EVSE shall be reviewed by a registered professional electrical engineer prior to the commencement of site work.

Electric installations shall be designed in accordance with local standard voltages and distribution standards. All EVSE shall be installed on dedicated, sub-metered circuits with 2-pole, 40 amp, 208-240 volt alternating current, 60 hertz, non-GFCI circuit breakers. Level 2 SAE J1772 compliant EVSE has built in GFCI protection; no additional GFCI protection upstream of the charging unit should be installed.

2.4 Operational Requirements

2.4.1 PHEV and EV Procurement

Prior to commencing any design activities associated with the construction or installation of EVSE, SILC-ESD-FOB should be contacted to confirm the number of PHEV and EV candidates to be served. Sufficient charging ports shall be installed to support PHEV and EV candidate vehicles at a rate of 1 charging port for every 2.5 candidate vehicles. Appropriated funds shall not be used to fund the construction of EVSE to support personally owned vehicles.

When feasible, the total number of charging ports required at a site should be constructed under one EVSE construction contract. However, site congestion, existing electrical grid capacity, evolving mission requirements, and long term site plans should be considered and may necessitate phased implementation of EVSE at an installation.

Upon planning factor and siting concurrence, SILC-ESD-FOB will evaluate GV lease statuses at the installation receiving EVSE as well as those of surrounding units to expedite delivery of EV.

Vehicle recapitalizations will be conducted with a preference to have corresponding EVSE construction contracts awarded prior to the delivery of any EV. At no point will a BEV be ordered with an expected delivery date that precedes completion of EVSE construction. PHEV may be delivered prior to construction final acceptance to facilitate equipment test charges.

2.4.2 EVSE Maintenance

EVSE shall be enrolled in Coast Guard equipment and maintenance databases as described in SILC’s Equipment Enrollment PGTO and Shore Asset Management Job Guide. EVSE shall be enrolled using UNIFORMAT II classification G40100603. EVSE is considered equipment tied to the Electrical Power Distribution Line Cat Code 812-32. In the case of EVSE supplied directly from a PV Carport, EVSE shall be enrolled as equipment tied to the Photovoltaic System CatCode 811-50. Include warranty information in the enrollment.

EVSE requires minimal routine maintenance. A visual inspection should be performed by the operator whenever commencing a vehicle charge. This visual inspection should include an examination of the charging connector, cables, and operational controls. Charging connectors should be examined for excessive corrosion as well as bent or damaged prongs. Connector cables should be inspected to ensure they are not frayed, punctured, or lacerated. Vehicle https://cg.portal.uscg.mil/units/silc/ESD/configurationManagement/Approved%20TOs/Equipment%20Enrollment%20PGTO.pdf https://cg.portal.uscg.mil/units/silc/ESD/configurationManagement/Approved%20TOs/SAM%20Organizational%20Level%20Maintenance%20Job%20Guide%20(v5.0).pdf operators should also note any visual operational status indicators of Fault or equivalent as indicated by the charging unit.

Discrepancies noted during the visual inspection should be immediately brought to the attention of the local engineering officer, engineering petty officer, or facilities engineer. Equipment should be tagged out until repairs are complete.

If the construction warranty remains in effect, repairs should be coordinated directly with the contractor that performed installation. Repairs outside the construction warranty should be coordinated directly with the equipment manufacturer. Most EVSE comes with a warranty period exceeding that of the contractor’s construction warranty which may enable no-cost correction.

However, even when no warranty remains in effect, charging connectors and cables should not be manually repaired by Coast Guard personnel. Repairs should be coordinated with the equipment manufacturer to preserve EVSE functionality.

2.4.3 EVSE Access Restrictions

In order to prevent unauthorized vehicle charging, all Coast Guard operated charging equipment shall include access controls. Access controls may consist of radio frequency identification devices, physical keys, pin entry, or credit card limitations.

2.5 Advanced Metering Infrastructure (AMI)

All EVSE shall be sub-metered in order to track and isolate energy consumption associated with the operation of GVs. Prior to the design and construction of EVSE, the Regional Energy Manager should be consulted to ascertain if the location in question has or is a target for advanced metering. Installed sub-meters must comply with the AMI CSTO technical requirements for meter and network hardware installation.

EVSE charging stations shall be monitored with an advanced electrical meter, and incorporated into the existing Advanced Metering Infrastructure (AMI) system. Only the total installed electric GV load needs to be monitored; individual charging ports do not need to have dedicated electric meters. If dedicated main distribution panels (MDP) are installed to supply electric vehicle charging stations, then one advanced electric meter will need to be installed at the main feed for the MDP. Branch circuits fed from mixed use MDP’s will need to be individually monitored to capture EV load.

Additional network hardware and internet connection may be required to connect meter data to the electronic data management system; this may include installing wireless transceivers (Modhoppers), Data Acquisition Servers (DAS’s), or cellular modems. SILC-ESD and CG-43 may need to be consulted on specific network configuration details.

3 REFERENCES

The documents listed in the following tables are referenced or were used to develop standards in this technical order. In order to identify process relationships and potential revisions, applicable documents are identified in the Purpose column as Parent, Sibling, or Child, as described in Figure 3-1.

Figure 3-1: Process Relationship Descriptions

Table 3-1: Coast Guard Publications

Document Name Document No. Rev / Date Purpose

Advanced Metering Initiative

CSTO

SILC-CSTO-36-

11 31 17 11-01 Latest (Sibling) Outlines requirements for

EVSE sub-metering equipment

Civil Engineering Manual COMDTINST M11000.11 Series (Parent) Establishes framework for the CE program

Engineering Change Proposal Process Guide

SILC-PG36-11

21 24 31-14 Latest

(Parent) Outlines Process Requirements for cataloging Discrepancies, Deviations, etc.

Equipment Enrollment

PGTO

SILC-PGTO-36-

11 29-13-15-13 Latest

(Sibling) Outlines steps for enrolling equipment after construction

SAM OLM Job Guide SILC-JG-36-11 29 13 15-02 Latest

(Sibling) Describes the minimum data entry requirements for the Shore Asset Management database.

Shore Infrastructure – Mission Support Business Model RDTO

SILC-RDTO-36-

11 29 11 00-01 Latest

(Parent) Authority for creating SILC technical orders to further define the

MSBM

Graphical Representation

Parent

THIS

DOCUMENTSibling

Child

Parent

PA

R

EN

TS

C H

IL

D

R

EN

SI

B

LI

N

G S

Parent

Child

Sibling

Process Relationship Revision Potential

Superior directives, business processes, and regulatory documents that provide authority or guidance

Documents that interact with this TO, but are not in a superior or subordinate relationship

Process outputs and subordinate documents generated by this TO

If requirements in the parent documents change, this TO may need to be changed

If requirements in the sibling documents change, this TO may need to be changed, and vice versa

If requirements in this TO change, child documents may need to be changed

Table 3-2: Other Government Publications

Document Name Document No. Rev / Date Purpose

DHS Motor Vehicle Fleet Program Instruction 118-01-002-01 31 Jan

Establishes fuel economy standards and provides EV incorporation guidance

DHS Stop Asset and Vehicle Excess Act

Public Law No:

115-38

06 Jun

Sets DHS and component agency fleet management objectives

Energy Independence and Security Act of 2007 74 FR 4907 28 Jan

Sets Corporate Average Fuel Economy and Renewable Fuel Standards

Energy Policy Act of 1992 Public Law No:

102-486

24 Oct

Sets goals and creates mandates to increase clean energy use and improve energy efficiency

Energy Policy Act of 2005 70 FR 51581 31 Aug

Addresses energy production to include efficiency, renewables, and vehicles fuels

Executive Order 13834:

Efficient Federal Operations 83 FR 23771 22 May

Mandates improved federal sustainability

Fixing America’s Surface Transportation Infrastructure Act

Public Law 114-

04 Dec

Provides guidance on the use of appropriated funding for the construction of EVSE to support POVs.

Implementing Instructions for Executive Order 13834:

Efficient Federal Operations

84 FR 19056 03 May

Provides guidance on implementation of Executive Order 13834

Unified Facilities Criteria (UFC) Civil Engineering 3-201-01 01Jun2013

Establishes minimum standards for protective bollards

Unified Facilities Criteria (UFC) Electrical Engineering 3-501-01

06 Oct

Provides requirements for electrical system design in high humidity areas, electrical load analysis, drawing requirements, and underground electricity distribution

Unified Facilities Criteria (UFC) Electrical Power Distribution

3-550-01 23 Mar

Provides requirements for exterior power distribution including grounding and metering

Table 3-3: Other Documents

ACI Specifications 301 ACI 301 Latest Details specifications for concrete placement and construction

NFPA 70: National Electrical Code, Chapter 6, Article 625 NFPA 70 Latest

Establishes national standards for EVSE equipment and infrastructure connections

SAE Standard J1772 SAE J1772 Latest Defines EVSE physical, electrical, functional and performance requirements in North America

4 DEFINITIONS

See the Shore Infrastructure Lexicon for common glossary terms.

Table 4-1 lists key terms that are important for understanding this technical order. Table 4-2 lists acronyms and abbreviations that are used in this document.

Table 4-1: Key Terms

Term Definition

DC Fast Charging DC Fast EVSE provides charging through a 480 volt, direct-current plug.

Most DC fast chargers are able to fully charge a depleted battery within an hour. This equipment is not compatible with many PHEV and EV models and would require upgrades to most electrical grids.

Electric Vehicles Electric Vehicles (EV) includes both Plug-In Hybrid Electric Vehicle (PHEV) and Battery Electric Vehicle (BEV).

Level 1 Charging Equipment

Level 1 EVSE provides charging through a 120 volt, alternating-current plug.

Level 1 charging refers to the use of a standard electrical outlet for EV charging. Dependent upon battery capacity and technology used in the vehicle, Level 1 charging typically takes 8 to 12 hours to fully charge a depleted battery.

Level 2 Charging Equipment

Level 2 EVSE provides charging through a 240 volt, alternating-current plug and requires a dedicated 40 amp circuit. Dependent upon battery capacity and technology used in the vehicle, Level 2 charging typically takes 4 to 6 hours to fully charge a depleted battery.

Table 4-2: Acronyms and Abbreviations

Acronym Definition

AASHTO American Association of State Highway and Transportation Officials

AC Alternating Current

ACI American Concrete Institute

AMI Advance Metering Infrastructure

BEV Battery Electric Vehicle

BOD Business Operation Division

CATCODE Category Code

CEU Civil Engineering Unit

CGTO Coast Guard Technical Order

CSTO Configuration Standard Technical Order

DAS Data Acquisition Server

DC Direct Current

DHS Department of Homeland Security

Acronym Definition

ECP Engineering Change Proposal

EPO Engineering Petty Officer

EV Electric Vehicle (to include both PHEV and BEV)

EVSE Electric Vehicle Support Equipment

FAR Federal Acquisition Regulation

FDCC Facility Design and Construction Center

FE Facility Engineer

GFCI Ground-Fault Circuit Interrupter

GHG Greenhouse Gas

GSA General Services Administration

GV Government Vehicle

MDP Main Distribution Panel

NEPA National Environmental Policy Act

OSHA Occupational Safety and Health Administration

PHEV Plug-In Hybrid Electric Vehicle

POV Personally Owned Vehicle

PV Photo Voltaic (Solar)

RPUID Real Property Unique Identifier

SAE Society of Automotive Engineers

SILC Shore Infrastructure Logistic Command

SILC-ESD-Energy SILC Engineering Services Division – Energy Group

SILC-ESD-FOB SILC Engineering Services Division – Facilities Operations Branch

SI-MSBM Shore Infrastructure Mission Support Business Model

A-1

Appendix A – EVSE Charging Port Requirements by Unit

District 1 PHEV Infrastructure

SEC Northern New England EV Candidates # EVSE Ports # Dual Port Stations

SEC Northern New England 11 6 3

SEC Boston

BASE Boston 73 30 15

SEC Southeastern New England

BASE Cape Cod 10 4 2

SEC Long Island Sound

CG Academy 14 6 3

SEC New York

SEC New York 40 16 8

Totals 148 62 31

District 5 PHEV Infrastructure

SEC Delaware Bay EV Candidates # EVSE Ports

Stations

SEC Delaware Bay 23 10 5

SFO & AIRSTA Atlantic City 28 12 6

TRACEN Cape May 29 12 6

SEC Baltimore

SEC Baltimore 43 18 9

BASE NCR (Headquarters) 47 20 10

SEC Hampton Roads

BASE Portsmouth 28 12 6

SFO Eastern Shore 13 6 3

Portsmouth Federal Building 12 6 3

SEC North Carolina

SEC North Carolina 12 6 3

A-2

BASE Elizabeth City 29 12 6

Totals 264 114 57

D7 PHEV Infrastructure

SEC Charleston EV Candidates # EVSE Ports

Stations

FLETC/SEC Charleston 20 8 4

SEC Jacksonville

SEC Jacksonville 11 6 3

SEC Miami

District Seven 22 10 5

Base Miami Beach 35 14 7

SEC Key West

SEC Key West 9 4 2

SEC St. Petersburg

SEC St. Petersburg 11 6 3

SEC St. Petersburg Prevention 10 4 2

SEC San Juan

SEC San Juan 23 10 5

Totals 141 62 31

D8 PHEV Infrastructure

SEC Ohio Valley EV Candidates # EVSE Ports

Stations

SEC Ohio River Valley 9 4 2

SEC Upper Mississippi

SEC Lower Mississippi 12 6 3

SEC Upper Mississippi 16 8 4

SEC Mobile

SEC Mobile 32 14 7

ATC Mobile/GST 9 4 2

A-3

SEC New Orleans

MSU Houma 17 8 4

MSU Morgan City 15 4 2

Sector New Orleans 33 14 7

Base New Orleans 26 12 6

SEC Houston-Galveston

SEC Houston-Galveston 33 14 7

MSU Texas City 14 6 3

SEC Corpus Christi

SEC Corpus Christi 27 12 6

Totals 243 106 53

D9 PHEV Infrastructure

SEC Buffalo EV Candidates # EVSE Ports

Stations

SEC Buffalo 17 8 4

District Nine 20 8 4

SEC Detroit

SEC Detroit 16 8 4

SEC Lake Michigan

SEC Lake Michigan 11 6 3

SEC Sault Ste Marie

SEC Sault Ste Marie 17 8 4

Totals 81 38 19

D11 PHEV Infrastructure

SEC San Diego EV Candidates # EVSE Ports

Stations

SEC San Diego 29 12 6

SEC Los Angeles/Long Beach

BASE LA/LB 33 14 7

A-4

SEC San Francisco

SEC San Francisco 34 14 7

BASE Alameda 79 32 16

TRACEN Petaluma 12 6 3

Totals 187 64 39

D13 PHEV Infrastructure

SEC Seattle EV Candidates # EVSE Ports

Stations

District 13 13 6 3

BASE Seattle 56 24 12

SEC Portland

SEC Portland 12 6 3

SEC North Bend

SEC North Bend 11 6 3

Totals 92 42 21

D14 PHEV Infrastructure

SEC Honolulu EV Candidates # EVSE Ports

Stations

BASE Honolulu 33 14 7

Totals 33 14 7

D17 PHEV Infrastructure, Alternatives Recommended

SEC Anchorage EV Candidates # EVSE Ports # Dual Port Stations

BASE Kodiak 40 16 8

Totals 40 16 8

B-1

Appendix B – Sample Statement of Work

The following Statement of Work is available in Word version:

(To download the attachments, click on the icon to open attachments tab. Then right click on the file, and choose “save as”. Include the suffix to save it as the appropriate file type.)Electric Vehicle Charging Station SO The template is saved in the Forms and Templates Library on Portal:

CG Portal SILC Engineering Services Division SILC Configuration Management

Forms and Templates Library

SAMPLE – Electric Vehicle Charging Station Scope of Work

Intent:

The intent of the electric vehicle charging station scope of work is to serve as an example for Coast Guard personnel responsible for EVSE infrastructure development or renovations to significantly reduce design time across the enterprise. This is not a substitute for applicable code requirements.

SCOPE OF WORK:

01 00 00 General Requirements

1.1 Contractor is responsible for all design, procurement, fabrication, site assessment, site preparation, construction, testing, and any other work necessary for the proper installation and commissioning of XXX (XX) AC level 2 dual port electric vehicle charging stations, providing XXX (XX) charging ports.

1.2 Data capability Requirements Applicable To All Coast Guard EVSE:

a. Accepting payments from the General Service Agency (GSA) Fleet Wright Express, Inc (WEX) card for government fleet vehicles. Use of RFID cards and/or key fobs that bill individual WEX fleet fuel cards is permissible. No additional mobile app, web service, or credit cards may be required to enable government vehicle charging.

(Note: Instructions on becoming a WEX accepting merchant are available on the GSA website, https://www.gsa.gov/buying-selling/products-services/transportation-logistics-services/vehicle-leasing/fleet-services-card/vendor-information).

https://cg.portal.uscg.mil/ https://cg.portal.uscg.mil/units/silc https://cg.portal.uscg.mil/units/silc/ESD https://cg.portal.uscg.mil/units/silc/ESD/configurationManagement/ https://cg.portal.uscg.mil/units/silc/ESD/configurationManagement/Forms%20and%20Templates%20Library https://www.gsa.gov/buying-selling/products-services/transportation-logistics-services/vehicle-leasing/fleet-services-card/vendor-information https://www.gsa.gov/buying-selling/products-services/transportation-logistics-services/vehicle-leasing/fleet-services-card/vendor-information

B-2

b. Capturing and relaying the following information to the government via an internet based dashboard/portal:

i. Energy consumption which can be broken down by vehicle or account,

ii. Energy consumption by time of day,

iii. Total number of charging sessions per day, and

iv. Real time and historical availability of EVSE.

1.1.1 Many states and municipalities offer rebate programs for the installation of EVSE. The contractor is encouraged to complete corresponding applications and consider possible rebates when developing proposals.

1.1.2 Coast Guard offers no guarantee that rebate applications will be accepted. Primary use of infrastructure will be for government vehicles.

1.2 Contractor is responsible for applying for and obtaining applicable certifications, licenses, and permits necessary for the installation and operation of electric vehicle charging stations. All electrical work shall be performed by an electrical contractor licensed in the state where work is to be performed.

1.3 Contractor shall install, test, commission, and provide training for the electric vehicle charging stations. To ensure proper operation of equipment, the contractor shall oversee a test charge of a vehicle at each charger following installation. On-Site Representative may waive test charges if an electric vehicle is not available. Three (3) written copies of equipment operations and maintenance instructions shall be provided.

1.4 Charging stations shall be pedestal mounted and positioned to maximize the number of parking spaces served. Each dual port charging station shall serve two parking spaces.

1.4.1 Parking layouts should not to be altered to accommodate EVSE. Any parking layout modifications must be approved by the On-Site Representative and Contracting Officer’s Representative in advance.

1.4.2 All EVSE shall be installed as close as practicable to existing infrastructure capable of supporting electrical demand to prevent the need for extensive trenching and site repairs.

1.4.3 Charging station site configuration shall be coordinated with the unit On-Site Representative and provided for Contracting Officer’s Representative’s review and acceptance prior to installation. The below graphics indicate potential charging station site configurations.

Actual layouts may deviate from the below with On-Site Representative and Contracting Officer’s Representative concurrence.

B-3

Location: (Base, Sector, Station, ETC.) XXX

Planned Location: XXX (XX) Level 2 dual port charging stations to be installed near the existing (insert applicable Electrical Piece of Equipment). Two parking spaces shall be served by each dual port charging station.

1.5 All work shall conform to relevant Federal, State, and regional codes and practices.

Contractor must specifically follow NFPA 70: National Electrical Code, 2011, Chapter 6: Special Equipment, ARTICLE 625 Electric Vehicle Charging System.

1.6 Contractor shall obtain dig permits for all trenching or digging that occurs. Contractor shall locate all water, communication, power, fuel supply, natural gas, and other utilities within XXX (XX) feet of the proposed footprint.

1.7 Contractor shall consider construction best practices at (Base, Sector, Station, ETC.

XXX) to preserve standard aesthetic appearances. All impacted surfaces shall be restored to pre-construction conditions using like-kind materials.

11 13 36 Vehicle Charging Equipment

11.1 AC level 2 is defined in SAE Standard J1772 as wall or pedestal mounted charging infrastructure with cord set designed to use 208-V or 240-V AC input. Charging stations shall be pedestal mounted.

11.2 Charging units shall be certified by a nationally recognized testing laboratory and meet the following standards:

a. SAE Standard J1772

B-4

b. UL Standard for Electric Vehicle Charging System Equipment; UL2202

c. UL Standard for Plugs, Receptacles and Couplers for Electric Vehicles; UL2251

d. UL Standard for Personnel Protection Systems for Electric Vehicle Supply Circuits;

UL2231

e. UL Standard for Enclosures for Electrical Equipment; UL50

11.3 Each level 2 charging station shall provide two SAE J1772 connectors and cord sets rated to provide 7.2 kWh. Connectors must be able to function simultaneously, i.e. charge two vehicles at once. Power and/or load share technology, which offers full power charging for one vehicle and split power when multiple vehicles are charging is not authorized under this contract.

11.4 All charger connection cables shall be a minimum of 15 feet.

11.5 Chargers must include visual operational status indicators to include at minimum: Ready to Charge, Charging, Complete, and Fault or equivalent and meet all data capability requirements.

11.6 Chargers shall have built-in electric nuisance tripping avoidance and auto-reclosure features.

11.7 Pedestal mounted charging stations shall include concrete foundations/charger pads with a top surface of consistent height. Minimum foundation/charger pad height is 2 inches above grade. All concrete used shall have a compressive strength of 2,500 PSI at 28 days. ACI 301 compliant forms shall be used for concrete placement. Chamfer above grade exposed joints, edges, and external corners of concrete 0.75 inch unless otherwise approved.

11.9 Protect all charging receptacles with vehicle parking stops and concrete bollards. Two bollards shall be installed at the front corners of each charging station pedestal. Contractor shall provide new parking stops for all spaces served by EVSE. Parking stop and bollard placement shall be in accordance with On-Site Representative guidance and Contracting Officer Representative’s approval.

11.9.1 Bollards must have a minimum height of 4 feet above finished grade. Bollards should be constructed of 4-inch diameter schedule 80 galvanized steel pipe filled with concrete, painted safety yellow, and set at least 4 feet below grade. Bolted bollards lack sufficient impact resistance and shall not be utilized.

B-5

11.10 Provide signage for each parking space supplied by a charger. Signs shall indicate “Electric Vehicle Parking Only” or equivalent. Sign design shall be approved by the On-Site Representative and Contracting Officer’s Representative prior to installation.

11.11 Cable holders and connector docks shall be provided with charging units to keep charge cords off the ground and neatly stored between uses.

11.12 All equipment, parts, and materials shall be appropriate or protected in such a way as to be appropriate for outdoor use and continuous exposure to temperatures, humidity, and marine air characteristic of the local climate. Charging units shall be rated to maintain consistent operations at ambient temperatures between 0 degrees F and 120 degrees F.

26 00 00 Electrical

26.1 The contractor shall evaluate the capacity of the facility's existing electrical distribution equipment and determine whether or not the existing electrical systems can support the new EVSE in accordance with the National Electrical Code and without causing electrical overload.

26.1.2 Construction shall commence only upon confirmation that existing electrical distribution system has sufficient capacity.

26.1.3 Submit a One-Line Diagram of the existing base electrical distribution system to include a narrative of whether or not the existing base systems can support the EVSE. Show electrical panels, switchboards, and/or transformers that will either support the new electrical equipment or will require upgrading.

26.1.4 A registered professional engineer shall perform and submit an evaluation of the existing electrical load to the Coast Guard for review and acceptance prior to the start of any construction. Any modifications to the electrical distribution system necessary to support proposed EVSE shall be reviewed by a registered professional electrical engineer prior to the commencement of site work.

26.1.5 Electric installations shall be designed in accordance with local standard voltages and distribution standards. All EVSE shall be installed on dedicated, sub-metered circuits with 2-pole, 40 amp, 208-240 volt alternating current, 60 hertz, non-GFCI circuit breakers. Level 2 SAE J1772 compliant EVSE has built in GFCI protection; no additional GFCI protection upstream of the charging unit should be installed.

26.1.2 Contractor is responsible for all design, procurement, fabrication, site assessment, site preparation, construction, testing, and any other work necessary for the proper installation of charging stations and all associated electrical equipment.

B-6

26.1.3 The contractor shall install an independent sub-meter upstream of all EVSE that complies…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .