The Department of the Air Force Materiel Command Lifecycle Management Center at Hanscom Air Force Base is soliciting contractors to demolish Buildings 1825 and 1839, which were originally constructed in 1955 and are currently vacant former office and storage facilities totaling approximately 3,000 square feet. The comprehensive demolition project requires hazardous materials abatement and proper disposal, complete removal of both buildings including foundations, removal of site improvements and utility services, decommissioning of a geothermal well, and full site restoration in accordance with federal, state, and local regulations. Contractors must provide all labor, equipment, and materials necessary to execute the work, with specific requirements for handling identified hazardous materials and coordinating utility disconnections. The contract will be awarded using a Lowest Price Technically Acceptable evaluation methodology on a firm fixed-price basis. Proposals were originally due June 12, 2025, but have been extended to June 23, 2025, at 4:00 PM EST, with a mandatory pre-proposal site inspection held on June 3, 2025.

This procurement is designated as a Total Small Business set-aside with no incumbent contractors identified in the documentation. The estimated contract value ranges between $250,000 and $500,000, with performance and payment bonds required at 1% of the total proposed project cost. The contract includes a 240-calendar day period of performance broken into three phases: 30 days for pre-construction submittals, 180 days for physical construction work, and 30 days for project closeout, with an estimated completion date of February 26, 2026. The work will be performed at Buildings 1825 and 1839 located at 72 Dow Street, Hanscom Air Force Base in Bedford, Massachusetts. The project requires specialized expertise in hazardous materials handling, utility decommissioning including a 650-foot deep geothermal well that must be removed by a MassDEP-certified well driller, and comprehensive site restoration including topsoil application and seeding.

Notice text

5 versions

Update #5 · Latest ·

The intent of this project is for the Contractor to demolish Building 1825 and Building 1839. Work includes the abatement and proper disposal of hazardous materials, complete removal of Building 1825 and Building 1839 to include foundations, removal of site improvements, removal of utility services, removal of geothermal well and site restoration in accordance with the SOW and attached plans, specifications, and hazardous materials testing report.

The Contractor shall provide all labor, equipment, and materials to execute work under this contract in accordance with applicable federal, state, and local laws and codes referenced in this Statement of Work and contained within the project specifications.

The project is located at Building 1825 and Building 1839, Hanscom Air Force Base, MA, Town of Bedford. B1825 was originally constructed in 1955 and consists of 3000 gross square feet. B1839 was originally constructed in 1955 and serve as a storage unit of N/A gross square feet. The building is currently vacant and was formerly used as office space. Hazardous materials have been identified in this building.

UPDATE 14 MAY 2025: RFP Cover letter has been updated to reflect site visit information and also basis of award has been updated.

UPDATE 20 MAY 2025: RFP Cover letter has been updated to add Attachment 9. B 1825 Demo plan MXRD 22-0107 V2 attachment.

UPDATE 10 JUNE 2025: Solicitation amendment 01 posted to add revised Statement of Work (SOW) attachment as well as revised demo plan attachment. This amendment also extends the proposal due date to 23 June 2025 at 4:00PM EST. 

UPDATE 13 JUNE 2025:  SOW updated.  Most current version of sow is dated 11June2025.  Changes are highlighted,  

Update #4 ·

The intent of this project is for the Contractor to demolish Building 1825 and Building 1839. Work includes the abatement and proper disposal of hazardous materials, complete removal of Building 1825 and Building 1839 to include foundations, removal of site improvements, removal of utility services, removal of geothermal well and site restoration in accordance with the SOW and attached plans, specifications, and hazardous materials testing report.

The Contractor shall provide all labor, equipment, and materials to execute work under this contract in accordance with applicable federal, state, and local laws and codes referenced in this Statement of Work and contained within the project specifications.

The project is located at Building 1825 and Building 1839, Hanscom Air Force Base, MA, Town of Bedford. B1825 was originally constructed in 1955 and consists of 3000 gross square feet. B1839 was originally constructed in 1955 and serve as a storage unit of N/A gross square feet. The building is currently vacant and was formerly used as office space. Hazardous materials have been identified in this building.

UPDATE 14 MAY 2025: RFP Cover letter has been updated to reflect site visit information and also basis of award has been updated.

UPDATE 20 MAY 2025: RFP Cover letter has been updated to add Attachment 9. B 1825 Demo plan MXRD 22-0107 V2 attachment.

UPDATE 10 JUNE 2025: Solicitation amendment 01 posted to add revised Statement of Work (SOW) attachment as well as revised demo plan attachment. This amendment also extends the proposal due date to 23 June 2025 at 4:00PM EST. 

Update #3 ·

The intent of this project is for the Contractor to demolish Building 1825 and Building 1839. Work includes the abatement and proper disposal of hazardous materials, complete removal of Building 1825 and Building 1839 to include foundations, removal of site improvements, removal of utility services, removal of geothermal well and site restoration in accordance with the SOW and attached plans, specifications, and hazardous materials testing report.

The Contractor shall provide all labor, equipment, and materials to execute work under this contract in accordance with applicable federal, state, and local laws and codes referenced in this Statement of Work and contained within the project specifications.

The project is located at Building 1825 and Building 1839, Hanscom Air Force Base, MA, Town of Bedford. B1825 was originally constructed in 1955 and consists of 3000 gross square feet. B1839 was originally constructed in 1955 and serve as a storage unit of N/A gross square feet. The building is currently vacant and was formerly used as office space. Hazardous materials have been identified in this building.

UPDATE 14 MAY 2025: RFP Cover letter has been updated to reflect site visit information and also basis of award has been updated.

UPDATE 20 MAY 2025: RFP Cover letter has been updated to add Attachment 9. B 1825 Demo plan MXRD 22-0107 V2 attachment.

Update #2 ·

The intent of this project is for the Contractor to demolish Building 1825 and Building 1839. Work includes the abatement and proper disposal of hazardous materials, complete removal of Building 1825 and Building 1839 to include foundations, removal of site improvements, removal of utility services, removal of geothermal well and site restoration in accordance with the SOW and attached plans, specifications, and hazardous materials testing report.

The Contractor shall provide all labor, equipment, and materials to execute work under this contract in accordance with applicable federal, state, and local laws and codes referenced in this Statement of Work and contained within the project specifications.

The project is located at Building 1825 and Building 1839, Hanscom Air Force Base, MA, Town of Bedford. B1825 was originally constructed in 1955 and consists of 3000 gross square feet. B1839 was originally constructed in 1955 and serve as a storage unit of N/A gross square feet. The building is currently vacant and was formerly used as office space. Hazardous materials have been identified in this building.

UPDATE 14 MAY 2025: RFP Cover letter has been updated to reflect site visit information and also basis of award has been updated.

Update #1 ·

The intent of this project is for the Contractor to demolish Building 1825 and Building 1839. Work includes the abatement and proper disposal of hazardous materials, complete removal of Building 1825 and Building 1839 to include foundations, removal of site improvements, removal of utility services, removal of geothermal well and site restoration in accordance with the SOW and attached plans, specifications, and hazardous materials testing report.

The Contractor shall provide all labor, equipment, and materials to execute work under this contract in accordance with applicable federal, state, and local laws and codes referenced in this Statement of Work and contained within the project specifications.

The project is located at Building 1825 and Building 1839, Hanscom Air Force Base, MA, Town of Bedford. B1825 was originally constructed in 1955 and consists of 3000 gross square feet. B1839 was originally constructed in 1955 and serve as a storage unit of N/A gross square feet. The building is currently vacant and was formerly used as office space. Hazardous materials have been identified in this building.

Files

Show all 23

Similar open opportunities

Opportunity Agency Set-aside Responses due
ES BLDG 1624 RM 203 VTC & A/V Upgrade - FY27 RFQ Hanscom AFB, Massachusetts 01731, United States · NAICS 238210 AFLCMC Hanscom AFB Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity