This document is a Request for Information (RFI) Log for Demolition Project B1825 & B1839, dated 3 June 2025, containing four key questions and answers related to a demolition project at Hanscom Air Force Base. The log addresses technical specifics about site demolition, including drain and water line removal, geothermal well decommissioning, and bonding requirements. Specific clarifications include: the 6-inch drain should reference updated demo plans, no utilities are to be abandoned, the geothermal well must be fully removed and decommissioned by a MassDEP-certified well driller, and the project bond will equal 1% of the total proposed project cost. The questions reveal potential ambiguities in the original statement of work that are being systematically resolved through this RFI process to ensure clear contractor understanding of project requirements.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI LOG – DEMO B1825 & B1839
3 June 2025
1. Q: Can the 6 “ inch drain be capped and abandoned instead of removed. To avoid breaking into the street ?
A: Drain to remain refer to updated plans : B-1825 Demo plan MXRD 22-0107 V2
2. Q: Same thing with the water line. Can it be turned off, capped and abandoned?
A: Nothing to be left abandoned
3. Q: On the statement of work under 5.2.2.1 it says “Geothermal well must be decommissioned by a MassDEP certified well driller” But under 5.2.2.2 it says “Contactor must follow all requirements regarding proper removal a geothermal well” Can the geothermal well be decommissioned and abandoned with having to removed. ? Section 5.2.2.1 and 5.2.2.2 kind of contradict each other.
A: The goal is to Completely remove the Geothermal well:
The Geothermal well shall be fully decommissioned and removed in accordance with all applicable Massachusetts Department of environmental Protection (MassDEP) regulations, and the work must be performed by a MassDEP-certified well driller.
4. Q: Does the bond equal to 1% of the total proposed project cost?
A: Yes.