This document is a Hazardous Materials Summary Report for Building 1825 at Hanscom Air Force Base in Bedford, Massachusetts, prepared by CDW Consultants in March 2024. The comprehensive report details the findings of a hazardous building materials survey conducted to support the planned demolition of the building, which was constructed in 1955 and currently serves as an office for the base's Environmental Department.

The survey identified several hazardous materials, including asbestos-containing materials in floor tiles, mastic, and pipe insulation. Specifically, asbestos was detected in the break room's vinyl floor tiles (4-10% chrysotile), pipe insulation above the ceiling, and various mastic materials. Additional hazardous materials include mercury-containing fluorescent bulbs, electronic ballasts, lead-based paint, tritium exit signs, emergency light batteries, a 1,000-gallon underground fuel oil storage tank, and a pad-mounted transformer. The report provides detailed recommendations for proper handling, removal, and disposal of these materials in compliance with federal, state, and local regulations, with an estimated total abatement cost of approximately $47,915.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4 California Drive, Suite 301, Framingham, Massachusetts 01701 508-875-2657 www.cdwconsultants.com

FINAL HAZARDOUS MATERIALS SUMMARY REPORT

Base Admin Building

Building 1825

Hanscom Air Force Base

Bedford, Massachusetts

Project: #MXRD220501

Prepared for:

SMMA

1000 Massachusetts Avenue Cambridge, MA 02138

Prepared by:

CDW Consultants

4 California Avenue Framingham, MA 01701

March 2024

CDW Project # 2105.00

Building 1993B

TABLE OF CONTENTS

Page

1.0 INTRODUCTION

2.0 PROJECT UNDERSTANDING

3.0 GENERAL SITE CONDITIONS

4.0 REPORTS REVIEW

5.0 ASBESTOS SURVEY

5.1 Methods

5.2 Findings

5.3 Recommendations

6.0 LEAD-BASED PAINT

6.1 Methods

6.2 Findings

6.3 Recommendations

7.0 POLYCHLORATED BIPHENYLS

7.1 Methods

7.2 Results

8.0 HAZARDOUS MATERIALS SURVEY

8.1 Methods

8.2 Findings

8.3 Recommendations

APPENDICES

Appendix A: Photographs Appendix B: Asbestos Laboratory Analytical Reports

Appendix C: Lead Paint Laboratory Analytical Report Appendix D: PCB Laboratory Analytical Report Appendix E: Cost Estimate

FIGURE HZ-101: Sample Locations

Building 1993B

CDW CONSULTANTS, INC. ii

EXECUTIVE SUMMARY

CDW Consultants, Inc. (CDW) conducted a hazardous building materials (HBM) survey to identify and report the findings of suspect asbestos-containing materials (ACM), lead based paint (LBP), polychlorinated biphenyls (PCBs) and other visible hazardous materials at Building 1825, located at Hanscom Air Force Base, Massachusetts (Site). In November 2023, CDW staff conducted visual inspections for suspect ACM and other hazardous materials. The HBM survey was conducted in support of demolition of twelve selected buildings on Hanscom Air Force Base.

Building 1825, an active occupied building, is a 3,000 square foot building constructed in 1955.

Building 1825 is utilized by the base Environmental Department. The exterior of the building consists of fiberglass over Styrofoam over concrete at the upper side, with a brick facade at the lower portion on a slab foundation. The interior finishes consist of sheetrock walls, carpet, and tile floors with suspended ceiling tiles. The subject property building contains a central cubical area, offices, and meeting room.

CDW’s HBM inspection identified ACM in floor tile and mastic and pipe insulation. Hazardous materials consist of items ranging from batteries for exit signs and emergency lights, fluorescent bulbs and ballasts, refrigerants, a 1,000-gallon #2 fuel oil underground storage tank (UST) and pad mounted transformer.

Building 1825, Base Admin Building Hanscom Air Force Base

CDW Project #2105.0

1.0 INTRODUCTION

CDW Consultants, Inc. (CDW) is pleased to present this report summarizing the findings of the HBM survey of Building 1825, located at Hanscom Air Force Base, Massachusetts (Site). The HBM survey was conducted by CDW in support of the demolition of this building and eleven others on base. In November 2023, Susan Cahalan (Massachusetts Asbestos Inspector #AI60784) and Bryant Dana (Massachusetts Asbestos Inspector #AI901229) conducted an inspection for suspect materials.

An inspection is required by the United States Environmental Protection Agency (USEPA) National Emission Standards for Hazardous Air Pollutants (NESHAP), prior to scheduled building renovations or demolitions. Additionally, the Massachusetts Department of Environmental Protection (MassDEP) regulate ACM associated with renovation, demolition, and asbestos abatement projects.

2.0 PROJECT UNDERSTANDING

The scope of the work was to provide an HBM survey in support of the demolition. The HBM survey consisted of collecting potential hazardous materials samples including ACM, LBP, and PCBs in building materials. The HBM survey also included a contractor to core and sample the roof, along with investigating behind façade for exterior vapor barrier and digging holes at the slab to look for waterproofing.

3.0 GENERAL SITE CONDITIONS

Building 1825 is a 3,000 square foot building constructed in 1955. Building 1825 is utilized as an office building which is occupied by the Environmental Department. The interior finishes consist of vinyl floor tile, carpet, painted sheetrock walls Which contains a main room with cubicles, an office, two bathrooms, a storage room, a break room, and a boiler room. The boiler room is only accessible through an exterior entrance.

The exterior of the building consists of painted fiberglass over Styrofoam over backup concrete at the upper section, and a brick façade at the lower section. Windows and doors are aluminum framed.

There is a wood façade right below a pitched shingled roof. Under the pitched shingle roof is an old tar and gravel roof. There was no vapor barrier found underground on the slab foundation.

The interior of Building 1825 consists of sheetrock walls, with carpet used throughout except for the breakroom, storage, and bathrooms. Vinyl floor tiles are located in the break room, both bathrooms, and the storage closet. Suspended ceiling tiles and cove base moldings trim the bottom of the sheetrock.

4.0 REPORTS REVIEW

No previous hazardous building surveys or abatement reports were available for review.

5.0 ASBESTOS SURVEY

5.1 Methods

The investigative work for the asbestos survey included conducting a visual inspection of physically accessible areas of the subject areas. Once the visual inspection was completed, the building components were categorized into homogeneous areas. CDW collected bulk samples of different homogeneous suspect materials for asbestos analysis. The bulk samples were delivered under chain of custody to Asbestos Identification Laboratory, Inc. (AIL) located in Woburn, Massachusetts. AIL is a state licensed (#AA000208) and NVLAP-accredited laboratory (lab code #200919-0) for asbestos analysis. Bulk samples were analyzed for asbestos content by polarized light microscopy (PLM) using USEPA Method 600/R-93/116. A positive stop method was used – if one sample in a homogeneous group is positive then additional samples of the same material are not analyzed.

Samples analyzed to contain greater than 1% asbestos are to be treated as ACM as defined by the USEPA and Commonwealth of Massachusetts Department of Environmental Protection (MassDEP).

Photographs are provided in Appendix A. The asbestos analytical report is provided in Appendix B.

5.2 Findings

Findings are listed in the below table.

Sample ID Material Location Asbestos %

1A,B,C White Dotted w/Bubbles Ceiling Tile

Women’s Bathroom ND

2A,B,C White Dotted w/ long Squiggles Ceiling Tile

Cubicle Area (Main Room)

ND

3A,B,C White Dotted w/Short Squiggles Ceiling Tile

Cubicle Area (Main Room)

ND

4A,B,C,D,E,F,G White Dotted Texture Ceiling Tile

Throughout Building (Cubicle Area, Break Room, Hallways, Main Entrance)

ND

5A,B,C 12”x12” Off White Dotted Ceiling Tile

Above Ceiling (Main Room)

ND

6A,B,C Glue Daubs Behind 12’x12’ Ceiling Tile

Above Ceiling )Main Room)

ND

7A,B,C Gray Cove Molding Bathrooms/Break Room ND

8A,B,C Tan Mastic Behind Gray Cove

Bathrooms/Break Room ND

9A,B,C,D,E Blue Cove Molding Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

ND

10A,B,C,D,E Tan Mastic Behind Blue Cove Molding

Throughout building (By Doors, Hallways, Break Room, Cubicle Area)

ND

11A,B,C Caulk Coating on Pipe

Above Ceiling in Front of Ladies Room

Chrysotile 10%

12A,B,C Glue Under Carpet By Exit Door (Northeast Door)

ND

13A,B,C,D,E,F,G Drywall Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

ND

14A,B,C,D,E,F,G White Wall Cover Throughout building (By Doors, Hallways, Break Room, Cubicle Area)

ND

15A,B,C Joint Compound Main Entrance Way ND

16A,B,C Gray Sealant on Vents

Boiler Room ND

17A,B,C Mudded Ends on Fiberglass Insulation

Boiler Room ND

18A,B,C Stucco Front Side of Building ND

19A,B,C Gray Mastic Under Stucco

Front Side of Building ND

20A,B,C Gray-Brown Exterior Door Caulk

Main Entrance Door ND

21A,B,C Gray-Brown Exterior Caulk on Top of Brick

Front/Back of Right-Side Building

ND

22A,B,C Black Exterior Window Glaze

Front/Back of South Side of Building

ND

23A,B,C Gray-Brown Exterior Window Caulk

Front/Back of Building, South Side

ND

24A,B,C Gray-Brown Exterior Caulk on top of Brick

Perimeter of Building ND

25A,B,C Exterior Window Caulk

West Side of Building ND

26A,B,C White Vinyl Tile Women’s Bathroom ND

27A,B,C Tan Mastic under White Floor Tile

Women’s Room ND

28A,B,C White Vinyl Floor Tile

Men’s Bathroom ND

29A,B,C Tan Mastic under White Floor Tile

Men’s Room ND

30A,B,C Black Vinyl Floor Tile

(Top Layer) Break Room (Kitchen)

Chrysotile 4%

31A,B,C Black Mastic Under Black Floor Tile

Break Room (Kitchen) Chrysotile 10%

32A,B,C Off White Vinyl Floor Tile

(Bottom Layer) Break Room (Kitchen)

Chrysotile 6%

33A,B,C Brown Mastic Under Off White Vinyl Floor Tile

Break Room (Kitchen) Chrysotile 5%

34A,B,C Sheetrock Attic ND

35A,B,C Joint Compound Attic ND

36A,B,C Wall Cover (Exterior) West Side of Building ND

37A,B,C New Shingle Roof ND

38A,B,C Roof underlayment Roof ND

39A,B,C Old Shingle Roof ND

Roof Core 1A Old Tar/Roof Top layer ND

Roof Core 1B Old Tar/Gravel Roof Middle layer ND

Roof Core 1C Tar Old Roof Top of Deck ND

ND = Not Detected Chrysotile = Asbestos Mineral

Refer to the below table for quantities of ACM and presumed ACM (PACM) from CDW’s survey.

Material Description

Location

Est.

Quantity

Units

Caulk Coating on Pipe at Connections

Above Ceiling in Front of Ladies Room

25 EA

Black VCT Tile (Top Layer) Break Room (Kitchen) 330 SF

Black Mastic Break Room (Kitchen) 330 SF

Off White VCT Tile (Bottom Layer) Break Room (Kitchen)

330 SF

Brown Mastic Break Room (Kitchen) 330 SF

Remnant Pipe Insulation and Fittings (PACM)

Fixed Walls, Unknown Trenches 500 LF

SF = Square Foot LF = Linear Foot

5.3 Recommendations

ACM that will be impacted by renovation or demolition work must be removed before they are disturbed. This work must be conducted in accordance with a project design as prepared by a licensed Asbestos Abatement Project Designer. This report is not intended for use as an abatement design. Prior to disturbance, the ACM identified must be abated by a Commonwealth of Massachusetts-licensed asbestos abatement contractor following all federal, state & local regulations governing asbestos abatement. A copy of the asbestos Waste Shipment record must be received within 35 days of removal from the Site. Asbestos air quality sampling must be conducted under USEPA regulations following asbestos abatement and prior to re-occupancy of the spaces. If additional materials are discovered that have not been sampled, those materials should be considered ACMs until laboratory analysis determines otherwise. During renovation or demolition work, it is possible that additional suspect ACM will be encountered in areas such as subsurface tunnels, behind fixed walls etc. Contractors should be apprised to conduct any such work in a controlled manner.

6.0 LEAD-BASED PAINT

6.1 Methods

CDW performed a visual inspection of painted surfaces. CDW collected samples from different color paints on various types of building component substrates. Samples were submitted to Aerobiology Laboratory Associates Incorporated, A Pace Laboratory, located in Woburn, Massachusetts for analysis via Atomic Absorption Spectrometry (AAS).

6.2 Findings

The results of the laboratory analysis are provided in the below table.

Sample ID Sample Description/Location Lead Concentration

(% Weight)

LBP – 1 White Paint on Pipe Above Ceiling 0.096 LBP – 2 Blue Paint in Mechanical Room 0.055 LBP – 3 Gray Paint on Door Frames <RL LBP - 4 Brown Paint (Exterior) 0.034

The USEPA and US Department of Housing and Urban Development defines LBP as any paint or surface coating that contains lead equal to exceeding one milligram per square centimeter (1.0 mg/cm2) or 0.5% by weight. The OSHA lead-in-construction standard defines lead containing paint (LCP) as a paint or coating containing any detectable level of lead. Three out of the four samples taken contain lead detected above laboratory detection limits. The laboratory analytical report is included in Appendix C.

6.3 Recommendations

Based on the conclusions of this testing, the following recommendations are offered:

• During demolition or renovation, paint materials containing lead should not be sanded, scraped, drilled, or otherwise altered unless proper engineering controls are used to prevent migration of fugitive lead containing dust from the work area. Under OSHA regulations, any demolition or renovation to be performed at a structure where lead in paint and dust is present must be performed in accordance with a worker protection policy, including, but not limited to, appropriate training, medical monitoring, respiratory protection, and other protective equipment.

• In addition to the worker protection requirements stipulated by OSHA, MassDEP and the USEPA regulate the disposal of wastes that are potentially hazardous. Such wastes may include paint chips and residue generated during abatement or repainting work, or whole components, such as wood windows, doors, and trim that are coated with LBP and that are disposed of as the result of renovation or demolition work. To determine the required method for disposing of permeable items coated with LBP, the MassDEP and the USEPA require representative sampling of the debris to determine the quantity of lead that would be expected to leach into the environment if the debris were disposed of in a landfill. The representative sample(s) must be analyzed by the Toxicity Characteristic Leaching Process (TCLP) to determine the proper disposal method.

7.0 POLYCHLORATED BIPHENYLS

7.1 Methods

CDW conducted a visual inspection for suspect PCB containing building materials. Once the suspect

PCB building materials were identified, bulk samples were collected of building materials (caulk, glaze, and paint) for laboratory analysis. The samples were submitted to Pace Analytical Laboratory out of East Longmeadow, Massachusetts for analysis via USEPA Method 8082 with Soxhlet extraction 3540C. A copy of the PCB laboratory report is provided in Appendix D.

7.2 Results

The PCB analytical results are summarized in the below tables.

The table below represents pipe covering and paint.

Sample ID Material/Location Concentration (mg/Kg)

PCB-1 Pipe Covering/ Above Ceiling

4.5

PCB-2 Light Blue Paint/ Mech Room

ND

PCB-3 White Paint/ Above Ceiling Pipe

PCB-4 Blue/Gray Paint/ Doorway ND

The table below represents caulk and glaze.

PCB-1 Brown, Gray Window Caulk/ Front/Rear of Building

ND

PCB-2 Brown-Gray Caulk on Brick/ Back/ Street Side

ND

PCB-3 Brown, Gray Window Caulk/East Side of Building

ND

PCB-4 Brown-Gray Caulk on Brick/ West Side of Building

ND

PCB-5 Exterior Black Window Glaze

ND

PCB-6 Gray-Brown Exterior Caulk on Top of Brick

PCB-7 Exterior Gray-Brown Window Caulk

ND

PCB-8 Exterior Gray-Brown Door Caulk

The analytical results are compared to the USEPA standard of 50 milligrams per kilograms (mg/kg), which is the threshold for bulk product waste, as defined by USEPA 40 CFR § 761.3, and regulated under the Toxic Substances Control Act (TSCA). None of the samples collected had concentrations of PCBs above the TSCA limit of 50 milligrams per kilogram. The pipe covering above the ceiling in front of the ladies’ room, contained PCB concentration <10 mg/kg. Furthermore, for the low level of PCBs less than 10 mg/kg, there are no sources noted such as leaking ballasts or building materials containing PCBs above 50 mg/kg leaching into adjacent materials. Therefore, the building materials are considered “Excluded PCB Product.”

8.0 HAZARDOUS MATERIALS SURVEY

8.1 Methods

OHM Visual Inspection

CDW visually inspected the Site building for universal, special, and hazardous wastes associated with building materials. These included but were not limited to the following:

• Mercury-containing devices (fluorescent light tubes, thermostats, gauges, etc.);

• di (2-ethylhexyl phthalate (DEHP)-containing light ballasts ;

• Chlorofluorocarbon (CFC)-containing equipment (refrigerants, air conditioners/HVAC equipment, water bubblers, etc.)

• Tritium-containing devices (exit signs);

• Lead-Acid batteries (emergency lights, etc.)

8.2 Findings

The visual survey for hazardous materials identified mercury-containing light tubes, electronic light ballasts, lead and tritium batteries, refrigerants, and other hazardous materials. No hazardous materials sampling or analysis was conducted as part of this survey. A list OHMs identified are listed below.

Material Description Location Est.

Units

Fluorescent Bulbs (Mercury) Throughout 40 4’ Tubes

Electronic Ballasts Throughout 40 EA

Exterior Lights Exterior Walls 5 EA

Fluorescent Bulbs Throughout 5 EA

Thermostats (Mercury) Throughout 4 EA

Exit Signs (Tritium) Throughout 3 EA

Emergency Lights (Batteries) Throughout 10 EA

Fire Alarms Throughout 5 EA

Smoke/Heat Detectors (Americium)

Throughout 15 EA

Refrigerants Air Compressor/Air Conditioner

1 EA

1,000-Gallon Fuel Oil UST and Piping

Exterior 1 EA

Pad Mounted Transformer Exterior, Labeled as <50 ppm PCBs

1 EA

EA = Each

8.3 Recommendations

Prior to removal, light tubes, ballasts, tritium batteries, smoke detectors and CFLs will require proper handling, removal, transportation, and off-site recycling/reclamation. Refrigerants and transformer fluid will require handling and disposal in accordance with applicable Military, Federal and State regulations.

Limitations

The conclusions are limited to the information available at the time of the field survey and the scope of services, as defined. No subsurface soil or groundwater sampling and analysis was performed. Where access to portions of the Site or to structures on the site was unavailable or limited, CDW renders no opinion as to the presence of hazardous material or the presence of indirect evidence related to hazardous material in that portion of the site or structure. This report cannot be solely relied upon for renovation or demolition. The sampling performed forms the basis for conclusions expressed and areas inaccessible for testing limits those conclusions. No other conclusions, interpretations or recommendations are contained or implied in this report other than those expressed. While CDW followed industry standards during the inspection, we do not warrant that all suspect hazardous building materials were identified in or on the buildings and shall not be held liable related to future abatement costs related to hazardous materials that are either not discovered or not appropriately characterized. This is due in part to inherent problems with every building inspection, such as, but not limited to:

• Seemingly homogeneous materials that are not in fact homogeneous;

• Seemingly representative locations that are not in fact representative;

• Layered materials that are not uniformly present or are isolated;

• Materials that are present and accessible but were not considered to be hazardous,

• Materials that are present in an isolated and limited quantity; and

• Material that is present in locations that are unsafe or otherwise difficult to access.

Client acknowledges that CDW's inspection is limited, and all hazardous materials may only become apparent during the course of future renovation or demolition. During the course of future renovation/demolition work, it is likely that additional hazardous materials or materials suspected of being hazardous will be identified. Such materials should be assumed to be hazardous unless appropriate evaluation or sampling and analysis demonstrate otherwise. No other use of this report is warranted without the written consent of CDW Consultants, Inc.

CDW appreciates the opportunity to provide our services to you on this project.

Very truly yours, CDW CONSULTANTS, INC.

Susan Cahalan, PG, ISSP-SA Associate/Senior Environmental Geologist

Bryant Dana Environmental Scientist

FIGURE

210 sqft

294 sqft

133 sqft

1154 sqft

214 sqft

330 sqft

25 sf

12 sf 77 sf

23 sf

64 sf

14 sf

1 2 7 8 9 103 4 5 6

A

B

C

D

E

F

G

STATUS

SI

ZE

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

IS

SU

E

D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

D

EP

AR

TM

EN

T

O F

TH

E

AI

R

F O

R C

E

AI

R F

O R

C E

M

AT

ER

IA

L C

O M

M

AN

D th A

IR

B

AS

E

G R

O U

P/ C

E

BA

SE

C

IV

IL

E N

G

IN

EE

R

IN

G

D

IV

IS

IO

N

D

ES

IG

N

F

IR

M

ST

R

EE

T

AD

D R

ES

S

C

IT

Y, S

TA

TE

, Z

IP

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

66 AIR

TH

ASE GROUP

B

SHEET IDENTIFICATION

H

AN

SC

O

M A

FB

, M

A

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

AN

SI

-D

XX

XX

XX

XX

XX

XX

XX

XX

XX

O

PT

IO

N

AL

F

IE

LD

XX

XX

XX

O

PT

IO

N

AL

F

IE

LD

XX

XX

XX

M

AY

AD

D R

ES

S

PROPERTY OF THE U.S. AIR FORCE: FOR OFFICIAL USE ONLY

FL

O

O R

H

AZ

M

AT

F

LO

O

R P

LA

N

HZ-101

B 1825

0 2' 4' 8'

SCALE:14"=1'-0"

R

ED

R

AW

N

APPENDIX A

This is the exterior of the main entrance to building 1825. Sample 20A,B,C (Ext Door Caulk) is marked with a red arrow. Sample 21A,B,C (Ext Caulk on top of Brick) is marked with a blue arrow.

This photo is a close up of the window caulk on the exterior windows. Sample 23A,B,C (Ext Window

Caulk) is highlighted in this photo with a red arrow.

This photo shows the entrance to the boiler room. Within this photo sample 21A,B,C (Ext Caulk on top of brick) is shown and represented with a red arrow.

This photo shows the right side of the main cubicle area. Multiple samples are shown within this photo.

Samples 9/10 A,B,C,D,E (Blue Cove Molding/Tan Mastic) are marked with a red arrow. Sample 4A-G

(White Dotted Texture Ceiling Tile) is marked with a blue arrow. Sample 3A,B,C (White Dotted w/ short squiggles Ceiling Tile) is marked with a light blue arrow.

This is above the panel ceiling on the interior of the building in the main cubicle area. Sample 11A,B,C

(Caulk Coating on Pipe Above Ceiling in Front of Ladies Room) was positive, 10% Chrysotile marked with a red arrow.

This is the break room/kitchen of the building. In this room there is a fridge and stove used by the employees. Sample 30/31/32/33A,B,C were all taken in this room marked with a red arrow. All the samples came back positive for ACM. Sample 30C (Black VCT Tile), 4% Chrysotile. Sample 31C (Black

Mastic), 10% Chrysotile. Sample 32C (Off White VCT Tile), 6% Chrysotile. 33C (Brown Mastic), 5%

Chrysotile.

This photo was taken in the boiler room. Samples 17A,B,C (TSI MUD ENDS) are shown and marked with a red arrow.

APPENDIX B

Asbestos Identification Laboratory.

165 New Boston St., Ste 227

Woburn, MA 01801 781-932-9600

Web: www.asbestosidentificationlab.com Email:

mikemanning@asbestosidentificationlab.com

Batch: 107455

Dear Alan Sundquist, Thank you Alan Sundquist for your business.

Michael Manning Owner/Director

Asbestos Identification Laboratory has completed the analysis of the samples from your office for the above referenced project.

The Analysis Method is BULK PLM ANALYSIS, EPA/600/R-93/116The information and analysis contained in this report have been generated using the EPA /600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials. Materials or products that contain more than 1% of any kind or combination of asbestos are considered an asbestos containing building material as determined by the EPA. This Polarized Light Microscope (PLM) technique may be performed either by visual estimation or point counting. Point counting provides a determination of the area percentage of asbestos in a sample. If the asbestos is estimated to be less than 10% by visual estimation of friable material, the determination may be repeated using the point counting technique. The results of the point counting supersede visual PLM results. Results in this report only relate to the items tested. This report may not be used by the customer to claim product endorsement by NVLAP or any other U.S.

Government Agency.

Alan Sundquist CDW Consultants, Inc.

6 Huron Drive Natick, MA 01760

Project Information

#2105

Hanscom (Building #1825)

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

• NVLAP Lab Code: 200919-0

• Massachusetts Certification License: AA000208

• State of Connecticut, Department of Public Health Approved Environmental Laboratory Registration Number: PH-0142

• State of Maine, Department of Environmental Protection Asbestos Analytical Laboratory License Number: LB-0078(Bulk) LA-0087(Air)

• State of Rhode Island and Providence Plantations. Department of Health Certification: AAL-121

• State of Vermont, Department of Health Environmental Health License AL934461

Laboratory results represent the analysis of samples as submitted by the customer. Information regarding sample location, description, area, volume, etc., was provided by the customer. Information provided by the customer can affect the validity of results. Asbestos Identification Laboratory is not responsible for sample collection activities or analytical method limitations.

Unless notified in writing to return samples, Asbestos Identification Laboratory discards customer samples after 30 days.

Samples containing subsamples or layers will be analyzed separately when applicable. Reports are kept at Asbestos Identification Laboratory for three years. All customer information will be maintained in confidentiality. This report shall not be reproduced, except in full, without the written consent of Asbestos Identification Laboratory.

Alan Sundquist CDW Consultants, Inc.

6 Huron Drive Natick, MA 01760

Project Information

#2105

Hanscom (Building #1825)

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID tan Fiberglass 40

Mineral Wool 10 Cellulose 40 Non-Fibrous 101175491

1A Womens BathroomWhite Dotted w/ Bubbles

CT

None Detected tan Fiberglass 40 Mineral Wool 10 Cellulose 40 Non-Fibrous 101175492

1B Womens BathroomWhite Dotted w/ Bubbles

CT

None Detected tan Fiberglass 40 Mineral Wool 10 Cellulose 40 Non-Fibrous 101175493

1C Womens BathroomWhite Dotted w/ Bubbles

CT

None Detected tan Fiberglass 30 Cellulose 55 Non-Fibrous 151175494

2A Cubicle Area (Main Room)White Dotted w/ Long Squiggles CT

None Detected tan Fiberglass 30 Cellulose 55 Non-Fibrous 151175495

2B Cubicle Area (Main Room)White Dotted w/ Long Squiggles CT

None Detected tan Fiberglass 30 Cellulose 55 Non-Fibrous 151175496

2C Cubicle Area (Main Room)White Dotted w/ Long Squiggles CT

None Detected tan Fiberglass 30 Cellulose 55 Non-Fibrous 151175497

3A Cubicle Area (Main Room)White Dotted w/ Short Squiggles CT

None Detected tan Fiberglass 30 Cellulose 55 Non-Fibrous 151175498

3B Cubicle Area (Main Room)White Dotted w/ Short Squiggles CT

None Detected tan Fiberglass 30 Cellulose 55 Non-Fibrous 151175499

3C Cubicle Area (Main Room)White Dotted w/ Short Squiggles CT

None Detected gray Fiberglass 35 Mineral Wool 10 Cellulose 45 Non-Fibrous 101175500

4A Throughout Building (Cubicle Area, Break Room, Hallways, Main Entrance)

White Dotted Texture CT None Detected gray Fiberglass 35 Mineral Wool 10 Cellulose 45 Non-Fibrous 101175501

4B Throughout Building (Cubicle Area, Break Room, Hallways, Main Entrance)

White Dotted Texture CT None Detected gray Fiberglass 35 Mineral Wool 10 Cellulose 45 Non-Fibrous 101175502

4C Throughout Building (Cubicle Area, Break Room, Hallways, Main Entrance)

White Dotted Texture CT None Detected gray Fiberglass 35 Mineral Wool 10 Cellulose 45 Non-Fibrous 101175503

4D Throughout Building (Cubicle Area, Break Room, Hallways, Main Entrance)

White Dotted Texture CT None Detected

Sampled: Received: November 17, 2023November 15, 2023 Analyzed:November 09, 2023

Analyzed by: 107455Batch:

Monday 20 November 2023

6 Huron Drive Natick, MA 01760

Project Information

#2105

Hanscom (Building #1825)

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID gray Fiberglass 35

Mineral Wool 10 Cellulose 45 Non-Fibrous 101175504

4E Throughout Building (Cubicle Area, Break Room, Hallways, Main Entrance)

White Dotted Texture CT None Detected gray Fiberglass 35 Mineral Wool 10 Cellulose 45 Non-Fibrous 101175505

4F Throughout Building (Cubicle Area, Break Room, Hallways, Main Entrance)

White Dotted Texture CT None Detected gray Fiberglass 35 Mineral Wool 10 Cellulose 45 Non-Fibrous 101175506

4G Throughout Building (Cubicle Area, Break Room, Hallways, Main Entrance)

White Dotted Texture CT None Detected tan Cellulose 95 Non-Fibrous 5

1175507

5A Above Ceiling (Main Room)12"x12" Off White Dotted

CT

None Detected tan Cellulose 95 Non-Fibrous 5

1175508

5B Above Ceiling (Main Room)12"x12" Off White Dotted

CT

None Detected tan Cellulose 95 Non-Fibrous 5

1175509

5C Above Ceiling (Main Room)12"x12" Off White Dotted

CT

None Detected brown Non-Fibrous 100

1175510

6A Above Ceiling (Main Room)Glue Daubs Behind 12"x12" CT

None Detected brown Non-Fibrous 100

1175511

6B Above Ceiling (Main Room)Glue Daubs Behind 12"x12" CT

None Detected brown Non-Fibrous 100

1175512

6C Above Ceiling (Main Room)Glue Daubs Behind 12"x12" CT

None Detected gray Non-Fibrous 100

1175513

7A Bathrooms/Break RoomGray Cove Molding None Detected gray Non-Fibrous 100

1175514

7B Bathrooms/Break RoomGray Cove Molding None Detected gray Non-Fibrous 100

1175515

7C Bathrooms/Break RoomGray Cove Molding None Detected tan Non-Fibrous 100

1175516

8A Bathrooms/Break RoomTan Mastic Behind Gray Cove

None Detected tan Non-Fibrous 100

1175517

8B Bathrooms/Break RoomTan Mastic Behind Gray Cove

None Detected tan Non-Fibrous 100

1175518

8C Bathrooms/Break RoomTan Mastic Behind Gray Cove

None Detected

Sampled: Received: November 17, 2023November 15, 2023 Analyzed:November 09, 2023

Analyzed by: 107455Batch:

6 Huron Drive Natick, MA 01760

Project Information

#2105

Hanscom (Building #1825)

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID blue Non-Fibrous 100

1175519

9A Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

Blue Cove Molding None Detected blue Non-Fibrous 100

1175520

9B Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

Blue Cove Molding None Detected blue Non-Fibrous 100

1175521

9C Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

Blue Cove Molding None Detected blue Non-Fibrous 100

1175522

9D Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

Blue Cove Molding None Detected blue Non-Fibrous 100

1175523

9E Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

Blue Cove Molding None Detected tan Non-Fibrous 100

1175524

10A Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

Tan Mastic Behind Blue Cove

None Detected tan Non-Fibrous 100

1175525

10B Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

Tan Mastic Behind Blue Cove

None Detected tan Non-Fibrous 100

1175526

10C Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

Tan Mastic Behind Blue Cove

None Detected tan Non-Fibrous 100

1175527

10D Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

Tan Mastic Behind Blue Cove

None Detected tan Non-Fibrous 100

1175528

10E Throughout Building (By Doors, Hallways, Break Room, Cubicle Area)

Tan Mastic Behind Blue Cove

None Detected

Detected Chrysotile 10 multi Non-Fibrous 90

1175529

11A Above Ceiling in Front of Ladies Room

Caulk Coating on Pipe

1175530

11B Above Ceiling in Front of Ladies Room

Caulk Coating on Pipe Not Analyzed

1175531

11C Above Ceiling in Front of Ladies Room

Caulk Coating on Pipe Not Analyzed multi Non-Fibrous 100

1175532

12A by Exit Door (Northeast Door)

Glue under Carpet None Detected multi Non-Fibrous 100

1175533

12B by Exit Door (Northeast Door)

Glue under Carpet None Detected multi Non-Fibrous 100

1175534

12C by Exit Door (Northeast Door)

Glue under Carpet None Detected

Sampled: Received: November 17, 2023November 15, 2023 Analyzed:November 09, 2023

Analyzed by: 107455Batch:

6 Huron Drive Natick, MA 01760

Project Information

#2105

Hanscom (Building #1825)

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID gray Cellulose 10

Non-Fibrous 90 1175535

13A Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

Drywall None Detected gray Cellulose 10 Non-Fibrous 90

1175536

13B Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

Drywall None Detected gray Cellulose 10 Non-Fibrous 90

1175537

13C Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

Drywall None Detected gray Cellulose 10 Non-Fibrous 90

1175538

13D Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

Drywall None Detected gray Cellulose 10 Non-Fibrous 90

1175539

13E Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

Drywall None Detected gray Cellulose 10 Non-Fibrous 90

1175540

13F Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

Drywall None Detected gray Cellulose 10 Non-Fibrous 90

1175541

13G Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

Drywall None Detected white Non-Fibrous 100

1175542

14A Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

White Wall Cover None Detected white Non-Fibrous 100

1175543

14B Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

White Wall Cover None Detected white Non-Fibrous 100

1175544

14C Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

White Wall Cover None Detected white Non-Fibrous 100

1175545

14D Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

White Wall Cover None Detected white Non-Fibrous 100

1175546

14E Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

White Wall Cover None Detected white Non-Fibrous 100

1175547

14F Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

White Wall Cover None Detected white Non-Fibrous 100

1175548

14G Throughout Building (by Doors, Offices, Break Room, Cubicle Area)

White Wall Cover None Detected white Non-Fibrous 100

1175549

15A Main Entrance WayJoint Compound None Detected white Non-Fibrous 100

1175550

15B Main Entrance WayJoint Compound None Detected

Sampled: Received: November 17, 2023November 15, 2023 Analyzed:November 09, 2023

Analyzed by: 107455Batch:

6 Huron Drive Natick, MA 01760

Project Information

#2105

Hanscom (Building #1825)

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID white Non-Fibrous 100

1175551

15C Main Entrance WayJoint Compound None Detected gray Non-Fibrous 100

1175552

16A Boiler RoomGray Sealant on Vents None Detected gray Non-Fibrous 100

1175553

16B Boiler RoomGray Sealant on Vents None Detected gray Non-Fibrous 100

1175554

16C Boiler RoomGray Sealant on Vents None Detected multi Fiberglass 30 Non-Fibrous 70

1175555

17A Boiler RoomTSI MUD ENDS None Detected multi Fiberglass 30 Non-Fibrous 70

1175556

17B Boiler RoomTSI MUD ENDS None Detected multi Fiberglass 30 Non-Fibrous 70

1175557

17C Boiler RoomTSI MUD ENDS None Detected gray Non-Fibrous 100

1175558

18A Front Side of BuildingStucco None Detected gray Non-Fibrous 100

1175559

18B Front Side of BuildingStucco None Detected gray Non-Fibrous 100

1175560

18C Front Side of BuildingStucco None Detected gray Non-Fibrous 100

1175561

19A Front Side of BuildingGray Mastic None Detected gray Non-Fibrous 100

1175562

19B Front Side of BuildingGray Mastic None Detected gray Non-Fibrous 100

1175563

19C Front Side of BuildingGray Mastic None Detected black Non-Fibrous 100

1175564

20A Main Entrance DoorExt Door Caulk None Detected black Non-Fibrous 100

1175565

20B Main Entrance DoorExt Door Caulk None Detected black Non-Fibrous 100

1175566

20C Main Entrance DoorExt Door Caulk None Detected brown Non-Fibrous 100

1175567

21A Front/Back of Right Side Building

Ext Caulk on top of Brick None Detected

Sampled: Received: November 17, 2023November 15, 2023 Analyzed:November 09, 2023

Analyzed by: 107455Batch:

6 Huron Drive Natick, MA 01760

Project Information

#2105

Hanscom (Building #1825)

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID brown Non-Fibrous 100

1175568

21B Front/Back of Right Side Building

Ext Caulk on top of Brick None Detected brown Non-Fibrous 100

1175569

21C Front/Back of Right Side Building

Ext Caulk on top of Brick None Detected black Non-Fibrous 100

1175570

22A Front/Back of BuildingExt Window Glaze None Detected black Non-Fibrous 100

1175571

22B Front/Back of BuildingExt Window Glaze None Detected black Non-Fibrous 100

1175572

22C Front/Back of BuildingExt Window Glaze None Detected gray Non-Fibrous 100

1175573

23A Front/Back of Building, Right Side

Ext Window Caulk None Detected gray Non-Fibrous 100

1175574

23B Front/Back of Building, Right Side

Ext Window Caulk None Detected gray Non-Fibrous 100

1175575

23C Front/Back of Building, Right Side

Ext Window Caulk None Detected brown Non-Fibrous 100

1175576

24A Left Side of BuildingExt Caulk on top of Brick None Detected brown Non-Fibrous 100

1175577

24B Left Side of BuildingExt Caulk on top of Brick None Detected brown Non-Fibrous 100

1175578

24C Left Side of BuildingExt Caulk on top of Brick None Detected brown Non-Fibrous 100

1175579

25A Left Side of BuildingExt Window Caulk None Detected brown Non-Fibrous 100

1175580

25B Left Side of BuildingExt Window Caulk None Detected brown Non-Fibrous 100

1175581

25C Left Side of BuildingExt Window Caulk None Detected white Non-Fibrous 100

1175582

26A Womens BathroomWhite VCT Tile None Detected white Non-Fibrous 100

1175583

26B Womens BathroomWhite VCT Tile None Detected white Non-Fibrous 100

1175584

26C Womens BathroomWhite VCT Tile None Detected

Sampled: Received: November 17, 2023November 15, 2023 Analyzed:November 09, 2023

Analyzed by: 107455Batch:

6 Huron Drive Natick, MA 01760

Project Information

#2105

Hanscom (Building #1825)

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID tan Non-Fibrous 100

1175585

27A Womens RoomTan Mastic under White

VCT

None Detected tan Non-Fibrous 100

1175586

27B Womens RoomTan Mastic under White

VCT

None Detected tan Non-Fibrous 100

1175587

27C Womens RoomTan Mastic under White

VCT

None Detected white Non-Fibrous 100

1175588

28A Mens BathroomWhite VCT Tile None Detected white Non-Fibrous 100

1175589

28B Mens BathroomWhite VCT Tile None Detected white Non-Fibrous 100

1175590

28C Mens BathroomWhite VCT Tile None Detected tan Non-Fibrous 100

1175591

29A Mens RoomTan Mastic under White

VCT

None Detected tan Non-Fibrous 100

1175592

29B Mens RoomTan Mastic under White

VCT

None Detected tan Non-Fibrous 100

1175593

29C Mens RoomTan Mastic under White

VCT

None Detected

Detected Chrysotile 4 black Non-Fibrous 96

1175594

30A (Top Layer) Break Room (Kitchen)

Black VCT Tile

1175595

30B (Top Layer) Break Room (Kitchen)

Black VCT Tile Not Analyzed

1175596

30C (Top Layer) Break Room (Kitchen)

Black VCT Tile Not Analyzed

Detected Chrysotile 10 black Non-Fibrous 90

1175597

31A Break Room (Kitchen)Black Mastic

1175598

31B Break Room (Kitchen)Black Mastic Not Analyzed

1175599

31C Break Room (Kitchen)Black Mastic Not Analyzed

Detected Chrysotile 6 tan Non-Fibrous 94

1175600

32A (Bottom Layer) Break Room (Kitchen)

Off White VCT Tile

1175601

32B (Bottom Layer) Break Room (Kitchen)

Off White VCT Tile Not Analyzed

Sampled: Received: November 17, 2023November 15, 2023 Analyzed:November 09, 2023

Analyzed by: 107455Batch:

6 Huron Drive Natick, MA 01760

Project Information

#2105

Hanscom (Building #1825)

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID

1175602

32C (Bottom Layer) Break Room (Kitchen)

Off White VCT Tile Not Analyzed

Detected Chrysotile 5 black Non-Fibrous 95

1175603

33A Break Room (Kitchen)Brown Mastic

1175604

33B Break Room (Kitchen)Brown Mastic Not Analyzed

1175605

33C Break Room (Kitchen)Brown Mastic Not Analyzed gray Cellulose 10 Non-Fibrous 90

1175606

34A AtticSheetrock None Detected gray Cellulose 10 Non-Fibrous 90

1175607

34B AtticSheetrock None Detected gray Cellulose 10 Non-Fibrous 90

1175608

34C AtticSheetrock None Detected white Non-Fibrous 100

1175609

35A AtticJoint Compound None Detected white Non-Fibrous 100

1175610

35B AtticJoint Compound None Detected white Non-Fibrous 100

1175611

35C AtticJoint Compound None Detected multi Non-Fibrous 100

1175612

36A Right Side of BuildingWall Cover (Exterior) None Detected multi Non-Fibrous 100

1175613

36B Right Side of BuildingWall Cover (Exterior) None Detected multi Non-Fibrous 100

1175614

36C Right Side of BuildingWall Cover (Exterior) None Detected black Fiberglass 35 Non-Fibrous 65

1175615

37A RoofNew Shingle None Detected black Fiberglass 35 Non-Fibrous 65

1175616

37B RoofNew Shingle None Detected black Fiberglass 35 Non-Fibrous 65

1175617

37C RoofNew Shingle None Detected black Cellulose 80 Non-Fibrous 20

1175618

38A RoofRoof Underlayment None Detected

Sampled: Received: November 17, 2023November 15, 2023 Analyzed:November 09, 2023

Analyzed by: 107455Batch:

6 Huron Drive Natick, MA 01760

Project Information

#2105

Hanscom (Building #1825)

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID black Cellulose 80

Non-Fibrous 20 1175619

38B RoofRoof Underlayment None Detected black Cellulose 80 Non-Fibrous 20

1175620

38C RoofRoof Underlayment None Detected black Fiberglass 35 Non-Fibrous 65

1175621

39A RoofOld Shingle None Detected black Fiberglass 35 Non-Fibrous 65

1175622

39B RoofOld Shingle None Detected black Fiberglass 35 Non-Fibrous 65

1175623

39C RoofOld Shingle None Detected black Cellulose 60 Non-Fibrous 40

1175624

Roof Core 1A Top LayerOld Tar/Roof None Detected tan Non-Fibrous 100

1175625

Roof Core 1B Middle LayerOld Tar/Gravel Roof None Detected black Cellulose 60 Non-Fibrous 40

1175626

Roof Core 1C Top of DeckTar Old Roof None Detected

Sampled: Received: November 17, 2023November 15, 2023 Analyzed:November 09, 2023

Analyzed by: 107455Batch:

APPENDIX C

APPENDIX D

APPENDIX E

Material

Description

Location

Est.

Units

Unit Cost

Total Cost

Caulk Coating on Pipe at

Connections

Above Ceiling in Front of Ladies

Room

25 EA $50 $1,250

Black Vinyl Floor Tile

(Top Layer) Break Room (Kitchen)

330 SF $6 $1,980

Black Mastic Break Room (Kitchen)

330 SF $6 $1,980

Off White Vinyl Floor Tile

(Bottom Layer) Break Room

(Kitchen)

330 SF $6 $1,980

Brown Mastic Break Room (Kitchen)

330 SF $6 $1,980

Remnant Pipe Insulation and

Fittings

(PACM)

Fixed Walls, Unknown Trenches

500 LF $20 $10,000

Total $19,170

Location Est.

Quantity

Units Unit Cost Total

Fluorescent Bulbs (Mercury)

Throughout 40 (4’ Tubes)

EA $1 $40

Electronic Ballasts Throughout 40 EA $25 $1,000

Exterior Lights Exterior Walls 5 EA $25 $125

Fluorescent Bulbs Throughout 5 EA $1 $5

Thermostats (Mercury)

Throughout 4 EA $25 $100

Exit Signs (Tritium)

Throughout 3 EA $25 $75

Location Est.

Quantity

Units Unit Cost Total

Emergency Lights (Batteries)

Throughout 10 EA $25 $250

Fire Alarms Throughout 5 EA $25 $125

Smoke/Heat Detectors (Americium)

Throughout 15 EA $35 $525

Refrigerants Air Compressor/Air Conditioner

1 EA $1,500 $1,500

1,000-Gallon Fuel Oil UST and Piping

Exterior 1 EA $20,000 $20,000

Pad Mounted Transformer

Exterior, Labeled as <50 ppm PCBs

1 EA $5,000 $5,000

Total $28,745

Attachments.pdf
HZ-101 (BLG 1825).pdf
Sheets and Views
ANSI-D

File details come from the government source that posted it. Updated .