Delta 8 B300 Conduit Install
Closed Solicitation Posted
- Solicitation number
- FA255024Q0024
- Agency
- Air Force Space Command Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- PSC
- 5975 Electrical Hardware And Supplies
- Place of performance
- Colorado Springs, Colorado 80912, United States
- Points of contact
-
- Melanie Briggs melanie.briggs.2@spaceforce.mil (719) 567-3898
- Alejandro Castellanos alejandro.castellanos@spaceforce.mil (719) 567-6185
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of the Air Force Space Command is seeking proposals for the installation of network infrastructure at the Delta 8 CTS facility in Colorado Springs, Colorado. The key requirements include installing (2) 2-inch rigid conduits, approximately 250 feet of 2-inch by 4-inch wire basket tray, a ground system, and three 24-inch by 24-inch by 30-inch wall-mounted cabinets with fiber optic equipment. The contractor must also provide, install, terminate, and test two 6-strand OM4 multi-mode fiber optic cables between specified rooms. Proposals will be evaluated on price and technical acceptability, with the lowest priced technically acceptable offer receiving the award. Quotes are due by July 31, 2024.
This is a small business set-aside solicitation with a NAICS code of 238210 and an SBA size standard of $19 million. The government intends to award the contract without discussions if the price is deemed fair and reasonable. The total project value is not specified, but the work must be completed within 60 days after award at the Delta 8 CTS facility in Colorado Springs, CO.
Notice text
4 versions
Update #4 · Latest ·
Delta 8 CTS requires the following work for B300, Rooms 242, 243, 246, and 248:
· Installation of (2) 2” rigid conduit with sealed fittings.
· Installation of approximately 250 feet of 2” x 4” wire basket tray for future workstations.
· Installation of ground system to include conveyance, ground bar, and grounding of pathways.
· Installation shall be done according to applicable regulations and safety standards. Provide and install a total of (3) wall-mounted cabinets sized 24” High X 24” Wide X 30” Depth. One in Room 243, one in Room 246, one in Room 242. The wall mounted cabinets shall have a fiberoptic LIU, of sufficient capacity to accommodate all backbone cabling. Each cabinet shall be grounded to a ground bar located near each cabinet.
· Provide and install firestop material in all Telecommunications conduit sleeves in required areas.
· Provide, install, terminate, and test a total of (2) OM4, 6 Strand Multi-Mode Fiber Optic Cables. The first from Room 243 to Room 246, and the second from Room 243 to Room 242. These cables shall be terminated using LC connectors. (Note: All above ceiling cables shall be plenum rated)
· Contracted procurement of necessary equipment
· Cleanup and trash removal shall be included.
Amendment 0001
Questions and Answers have been uploaded. No other changes have been made.
Amendment 0002 - 26 July 2024
Revised SOW removing paragrahs 4.1 and 4.2 in reference to modular furniture. See SOW dated 26 July 2024. Revised Questions and Answers correcting the answer to question #12. Offer due date remains unchanged.
Amendment 0003 - 29 July 2024
Revised SOW removing paragraphs pertaining to modular furniture. Furniture is not inluded in this soliciattion. See SOW dated 29 July 2024. Offer due date remains unchanged.
Update #3 ·
Delta 8 CTS requires the following work for B300, Rooms 242, 243, 246, and 248:
· Installation of (2) 2” rigid conduit with sealed fittings.
· Installation of approximately 250 feet of 2” x 4” wire basket tray for future workstations.
· Installation of ground system to include conveyance, ground bar, and grounding of pathways.
· Installation shall be done according to applicable regulations and safety standards. Provide and install a total of (3) wall-mounted cabinets sized 24” High X 24” Wide X 30” Depth. One in Room 243, one in Room 246, one in Room 242. The wall mounted cabinets shall have a fiberoptic LIU, of sufficient capacity to accommodate all backbone cabling. Each cabinet shall be grounded to a ground bar located near each cabinet.
· Provide and install firestop material in all Telecommunications conduit sleeves in required areas.
· Provide, install, terminate, and test a total of (2) OM4, 6 Strand Multi-Mode Fiber Optic Cables. The first from Room 243 to Room 246, and the second from Room 243 to Room 242. These cables shall be terminated using LC connectors. (Note: All above ceiling cables shall be plenum rated)
· Contracted procurement of necessary equipment
· Cleanup and trash removal shall be included.
Amendment 0001
Questions and Answers have been uploaded. No other changes have been made.
Amendment 0002 - 26 July 2024
Revised PWS removing paragrahs 4.1 and 4.2 in reference to modular furniture. See PWS dated 26 July 2024. Revised Questions and Answers correcting the answer to question #12. Offer due date remains unchanged.
Update #2 ·
Delta 8 CTS requires the following work for B300, Rooms 242, 243, 246, and 248:
· Installation of (2) 2” rigid conduit with sealed fittings.
· Installation of approximately 250 feet of 2” x 4” wire basket tray for future workstations.
· Installation of ground system to include conveyance, ground bar, and grounding of pathways.
· Installation shall be done according to applicable regulations and safety standards. Provide and install a total of (3) wall-mounted cabinets sized 24” High X 24” Wide X 30” Depth. One in Room 243, one in Room 246, one in Room 242. The wall mounted cabinets shall have a fiberoptic LIU, of sufficient capacity to accommodate all backbone cabling. Each cabinet shall be grounded to a ground bar located near each cabinet.
· Provide and install firestop material in all Telecommunications conduit sleeves in required areas.
· Provide, install, terminate, and test a total of (2) OM4, 6 Strand Multi-Mode Fiber Optic Cables. The first from Room 243 to Room 246, and the second from Room 243 to Room 242. These cables shall be terminated using LC connectors. (Note: All above ceiling cables shall be plenum rated)
· Contracted procurement of necessary equipment
· Cleanup and trash removal shall be included.
Amendment 0001
Questions and Answers have been uploaded. No other changes have been made.
Update #1 ·
Delta 8 CTS requires the following work for B300, Rooms 242, 243, 246, and 248:
· Installation of (2) 2” rigid conduit with sealed fittings.
· Installation of approximately 250 feet of 2” x 4” wire basket tray for future workstations.
· Installation of ground system to include conveyance, ground bar, and grounding of pathways.
· Installation shall be done according to applicable regulations and safety standards. Provide and install a total of (3) wall-mounted cabinets sized 24” High X 24” Wide X 30” Depth. One in Room 243, one in Room 246, one in Room 242. The wall mounted cabinets shall have a fiberoptic LIU, of sufficient capacity to accommodate all backbone cabling. Each cabinet shall be grounded to a ground bar located near each cabinet.
· Provide and install firestop material in all Telecommunications conduit sleeves in required areas.
· Provide, install, terminate, and test a total of (2) OM4, 6 Strand Multi-Mode Fiber Optic Cables. The first from Room 243 to Room 246, and the second from Room 243 to Room 242. These cables shall be terminated using LC connectors. (Note: All above ceiling cables shall be plenum rated)
· Contracted procurement of necessary equipment
· Cleanup and trash removal shall be included.
Attachments
| File | Type | Posted |
|---|---|---|
| SOW SST COOP PDS 29 July 2024.pdf | ||
| PWS SST COOP PDS 26 July 2024.pdf | ||
| FA255024Q0024_Delta 8 B300 SST COOP Conduit Install_QnA Revised.xlsx | XLSX spreadsheet | |
| FA255024Q0024_Delta 8 B300 SST COOP Conduit Install_QnA.xlsx | XLSX spreadsheet | |
| Room 246 option A.pdf | ||
| Room 243 V2.0.pdf | ||
| Building 300 8 CTS training coop-JT.pdf | ||
| Room 242.pdf | ||
| Attachment 1_Provisions and Clauses.docx | DOCX document | |
| Delta 8 B300 Conduit Install_Solicitaion Combo.pdf | ||
| SOW SST COOP PDS_27JUN2024.pdf |
Show all 11