This document consists of Questions and Answers related to a federal contract opportunity for the installation of conduit and cable trays at the Delta 8 B300 facility. The key details are:
The contract opportunity is for the installation of (2) 2-inch rigid conduits with sealed fittings, approximately 250 feet of 2" x 4" wire basket trays, and a ground system at Rooms 242, 243, 246, and 248 in the Delta 8 B300 facility. The contractor is also required to provide and install three 24" x 24" x 30" wall-mounted cabinets, each with a fiber optic LIU, and install two 6-strand OM4 multi-mode fiber optic cables between the rooms. All work must be completed according to applicable regulations and safety standards. The solicitation number is FA255024Q0024 and is being issued by the Department of the Air Force Space Command. There is no current wage determination for this project, and weekly certified payroll reports are not required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW SST COOP PDS 29 July 2024.pdf | ||
| PWS SST COOP PDS 26 July 2024.pdf | ||
| FA255024Q0024_Delta 8 B300 SST COOP Conduit Install_QnA.xlsx | XLSX spreadsheet | |
| Room 246 option A.pdf | ||
| Room 242.pdf | ||
| Room 243 V2.0.pdf | ||
| Building 300 8 CTS training coop-JT.pdf | ||
| SOW SST COOP PDS_27JUN2024.pdf | ||
| Delta 8 B300 Conduit Install_Solicitaion Combo.pdf | ||
| Attachment 1_Provisions and Clauses.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FA255020Q0024 Delta 8 B300 SST COOP Conduit Install | ||
| QUESTIONS | Date Received | ANSWERS |
| 1. Are pathways to be used free, straight, and clear for the to-be-installed PDS and cable trays? | 18-Jul | Assume no, You were given the opprotunity to inspect above the ceilings during the site walk. |
| 2. Is there a requirement to weld, compression seal, or chemically seal the PDS? | 18-Jul | Chemically seal is prefered |
| 3. Is there an existing building ground to be tied to? | 18-Jul | Yes in the electrical room |
| 4. Are wall penetrations already installed? If not, we need wall type details, such as standard drywall, Kane screened, SCIF rated .... | 18-Jul | Standard drywall metal studs |
| 5. Will answers to all questions be posted to bidders? | 18-Jul | Yes, answers will be posted to the solicitation on SAM.gov on Wednesday, 24 July, 2024 |
| 6. Are there is requirement to cable each workstation pictured in the provided documentation. | 18-Jul | No that is being taken care of separately |
| 7. Requirements/Purpose: “Installation of (2) 2” rigid conduit with sealed fittings”. Is Rigid Conduit with epoxy sealed fittings acceptable for this requirement? | 18-Jul | Yes |
| 8. It the 2” rigid conduit above or below the drop ceiling in the hallway? | 18-Jul | Above |
| 9. Requirements/Purpose: “Installation of ground system to include convenance, ground bar, and grounding of pathways” Can the government please explain the ground system – wire size, location, connect to building steel, water pipe, etc. | 18-Jul | The expectation is the installer will determine the design of the ground system to meet the appropriate need and building code standards. This cable tray will be housing CAT5 and CAT6 Plenum rated cable based on the room layouts referenced in the SOW. My understanding is the ground system will be connected to building steel inside the electrical room located on the south east side of the building. |
| 10. Can the government please provide information on the (3) wall-mounted cabinets? Make, model, etc. | 18-Jul | Yes locking and yes swinggate. Please see attached spec sheet for dimentions. |
| 11. Can the government provide raceway size from cabinets to cable trays? | 18-Jul | 4inch width is acceptable |
| 12. Paragraph 4.3 - is this the only requirement on this project? Are all other paragraphs part of a different solicitation? | 18-Jul | Please see revised PWS with removal of paragraphs 4.1 and 4.2. |
| 13. Is there a current Wage Determination for use with this project? | 18-Jul | No, there is not. |
| 14. Are weekly certified payroll reports required? | 18-Jul | No, they are not required |
| 15. What is the preferred path of travel for fiber to individual rooms? | 18-Jul | Throught the PDS into apporpriate raceway and cable manegment |
| 16. Can we receive pictures above the tiles to discern if the space is congested in each room? | 18-Jul | Assume congestion, no pictures are authorized. You were given the opprotunity to inspect above the ceilings during the site walk. |
| 17. Is it preferred to have the cable tray above or below the tiles to facilitate the drops? | 18-Jul | Above the ceiling as it will conflict with modular wall. |
| 18. Is the preference to hammer drill a cable tray or is it preferred to have it anchored? Any noise constraints? | 18-Jul | No noise constraint. No preference |
| 19. Will a staging area be assigned for the materials? | 18-Jul | Room 242, 243, 246, and 248 can all be used for staging |
| 20. Specifications on the cabinets -will it require locking mech and or swing gate? | 18-Jul | Yes locking and yes swinggate. Please see attached spec sheet for dimentions. |