Dam Valve Replacement/Repair for the Hoosier National Forest
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 12444526Q0013
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- 4810 Valves, Powered
- Place of performance
- Bristow, Indiana 47515, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service is soliciting proposals for dam valve replacement and repair services at three earthen dams located on the Tell City Ranger District of the Hoosier National Forest in Indiana. The scope of work includes replacement of valve assemblies at Celina Lake and Saddle Lake dams and repair of the valve assembly at U-38 dam, with all work requiring compliance with OSHA confined space entry regulations and prevailing wage standards. Contractors must demonstrate technical capability, provide evidence of past performance on similar projects, submit a comprehensive management plan, and offer competitive pricing through a lump-sum, firm fixed-price proposal format. Evaluation will be based on technical capability, past performance, management plan, and cost/price, with non-cost factors weighted equally to cost factors. The deadline for proposal submission is April 17, 2026, at 10:00 A.M. EST, with the contract period of performance running from April 1, 2026, through September 1, 2026, though this may be adjusted to accommodate reasonable material lead times exceeding three months.
This solicitation is designated as a total small business set-aside with a NAICS code of 237990 (Other Heavy and Civil Engineering Construction) and a small business size standard of $45.0 million. No incumbent contractor is identified in the solicitation documents. The contract structure consists of one base item and two option items, all priced on a lump-sum basis, though specific budget values are not disclosed in the solicitation materials. Work will be performed at three dam locations in Perry and Crawford counties, Indiana, with the primary performance location identified as Bristow, Indiana 47515. Contractors must arrange their own lake drawdown operations at specified elevations and are responsible for damage prevention and repair to Forest Service property, with water levels generally maintained near design pool levels throughout the year and work conducted during standard hours of 6:00 a.m. to 6:00 p.m., Monday through Friday.
Notice text
The Hoosier National Forest has three earthen dams that have maintenance needs with their valve operations. These dams are located on the Tell City Ranger District (See attached maps for locations and directions). The existing valve systems for all three dams are different. Known equipment and diagrams for each dam have been included in attachments to this solicitation. A copy of the as-builts can be acquired upon request.
The scope of work includes the replacement of the dam valve assemblies at Celina Lake and Saddle Lake dams, and the repair of the dam valve assembly at the U-38 dam located on the Hoosier National Forest
Files
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| Dam Valve Replacement/Repair for the Hoosier National Forest | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity