Construct Stream Crossings on Fort McCoy, WI

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W911SA21B2006
Agency
MICC Fort McCoy Mission and Installation Contracting Command, Department of Defense
Responses due
Set-aside
HUBZone

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Fort McCoy WI 54656, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Mission and Installation Contracting Command at Fort McCoy, Wisconsin seeks to award a firm fixed-price contract to construct five stream crossings on Fort McCoy. Work includes repairing an existing bridge, removing old timber piers and installing new precast concrete piers and steel guardrails. Additional work comprises constructing concrete culverts, earthwork, roadway construction, concrete cable mats, erosion control measures and landscaping. The solicitation will utilize full and open competition under NAICS code 237310 and be evaluated on price. The period of performance must be completed by June 30, 2022.

This requirement is set aside for small business concerns under the HUBZone program. The total project value is estimated between $2-3 million to be awarded under solicitation number W911SA21B2006. This single award contract will utilize NAICS code 237310 for heavy and civil engineering construction with a small business size standard of $39.5 million. Interested parties can subscribe to receive notifications and any amendments by June 15, 2021 by adding themselves to the interested vendors list associated with this pre-solicitation notice.

Notice text

9 versions

Update #9 · Latest ·

The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement to construct trail stream crossings on Fort McCoy, Wisconsin.

Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to: Repair Bridge NRP03, removing old timber piers, earthwork, installation of precast concrete piers, installation of steel guardrail, erosion control, re-alignment of structure on new piers, and landscaping, AND Construct Stream Crossing B03, Construct Stream Crossing C11-1, Construct Stream Crossing C11-4, and Construct Stream Crossing C12-1 construction including: concrete culvert, earthwork, roadway construction, concrete cable mat, erosion control, and landscaping.

Work to be performed will be within the North American Industry Classification System (NAICS) Code 237310 with a small business size standard of $39.5 million.

Solicitation W911SA21B2006 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). 

It is anticipated that this requirement will be awarded as a single award, firm fixed-price contract. 

This solicitation will be Small Business HubZone Set Aside. 

Project magnitude is between $2,000,000 and $3,000,000.

Period of Performance: Work is to be completed NLT 30 June 2022. 

MICC Fort McCoy intends to issue the solicitation within 45 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted.

Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents. The interested Vendor's list has been activated on this listing. 

SOLICITATION POSTED 03/15/2021 

SOLICITATION AMENDMENT 0001 POSTED 03/15/2021

03/18/2021 - An email was received identifying that Attachment 10 was not specifications but rather an email, the incorrect Attachment 10 has been removed and the correct Attachment 10 has been uploaded.  Thank you! MMH

03/23/2021 SOLICITATION AMENDMENT 0002 POSTED  MMH

04/06/2021 Adding the Site Visit Sign In Sheet to the attachments for this requirement MMH 

04/14/2021 - Amendment 0003 posted MMH 

04/23/2021  - Amendment 0004 posted MMH

BID ABSTRACT POSTED 05/04/2021

Update #8 ·

The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement to construct trail stream crossings on Fort McCoy, Wisconsin.

Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to: Repair Bridge NRP03, removing old timber piers, earthwork, installation of precast concrete piers, installation of steel guardrail, erosion control, re-alignment of structure on new piers, and landscaping, AND Construct Stream Crossing B03, Construct Stream Crossing C11-1, Construct Stream Crossing C11-4, and Construct Stream Crossing C12-1 construction including: concrete culvert, earthwork, roadway construction, concrete cable mat, erosion control, and landscaping.

Work to be performed will be within the North American Industry Classification System (NAICS) Code 237310 with a small business size standard of $39.5 million.

Solicitation W911SA21B2006 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). 

It is anticipated that this requirement will be awarded as a single award, firm fixed-price contract. 

This solicitation will be Small Business HubZone Set Aside. 

Project magnitude is between $2,000,000 and $3,000,000.

Period of Performance: Work is to be completed NLT 30 June 2022. 

MICC Fort McCoy intends to issue the solicitation within 45 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted.

Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents. The interested Vendor's list has been activated on this listing. 

SOLICITATION POSTED 03/15/2021 

SOLICITATION AMENDMENT 0001 POSTED 03/15/2021

03/18/2021 - An email was received identifying that Attachment 10 was not specifications but rather an email, the incorrect Attachment 10 has been removed and the correct Attachment 10 has been uploaded.  Thank you! MMH

03/23/2021 SOLICITATION AMENDMENT 0002 POSTED  MMH

04/06/2021 Adding the Site Visit Sign In Sheet to the attachments for this requirement MMH 

04/14/2021 - Amendment 0003 posted MMH 

04/23/2021  - Amendment 0004 posted MMH 

Update #7 ·

The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement to construct trail stream crossings on Fort McCoy, Wisconsin.

Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to: Repair Bridge NRP03, removing old timber piers, earthwork, installation of precast concrete piers, installation of steel guardrail, erosion control, re-alignment of structure on new piers, and landscaping, AND Construct Stream Crossing B03, Construct Stream Crossing C11-1, Construct Stream Crossing C11-4, and Construct Stream Crossing C12-1 construction including: concrete culvert, earthwork, roadway construction, concrete cable mat, erosion control, and landscaping.

Work to be performed will be within the North American Industry Classification System (NAICS) Code 237310 with a small business size standard of $39.5 million.

Solicitation W911SA21B2006 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). 

It is anticipated that this requirement will be awarded as a single award, firm fixed-price contract. 

This solicitation will be Small Business HubZone Set Aside. 

Project magnitude is between $2,000,000 and $3,000,000.

Period of Performance: Work is to be completed NLT 30 June 2022. 

MICC Fort McCoy intends to issue the solicitation within 45 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted.

Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents. The interested Vendor's list has been activated on this listing. 

SOLICITATION POSTED 03/15/2021 

SOLICITATION AMENDMENT 0001 POSTED 03/15/2021

03/18/2021 - An email was received identifying that Attachment 10 was not specifications but rather an email, the incorrect Attachment 10 has been removed and the correct Attachment 10 has been uploaded.  Thank you! MMH

03/23/2021 SOLICITATION AMENDMENT 0002 POSTED  MMH

04/06/2021 Adding the Site Visit Sign In Sheet to the attachments for this requirement MMH 

04/14/2021 - Amendment 0003 posted MMH 

Update #6 ·

The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement to construct trail stream crossings on Fort McCoy, Wisconsin.

Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to: Repair Bridge NRP03, removing old timber piers, earthwork, installation of precast concrete piers, installation of steel guardrail, erosion control, re-alignment of structure on new piers, and landscaping, AND Construct Stream Crossing B03, Construct Stream Crossing C11-1, Construct Stream Crossing C11-4, and Construct Stream Crossing C12-1 construction including: concrete culvert, earthwork, roadway construction, concrete cable mat, erosion control, and landscaping.

Work to be performed will be within the North American Industry Classification System (NAICS) Code 237310 with a small business size standard of $39.5 million.

Solicitation W911SA21B2006 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). 

It is anticipated that this requirement will be awarded as a single award, firm fixed-price contract. 

This solicitation will be Small Business HubZone Set Aside. 

Project magnitude is between $2,000,000 and $3,000,000.

Period of Performance: Work is to be completed NLT 30 June 2022. 

MICC Fort McCoy intends to issue the solicitation within 45 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted.

Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents. The interested Vendor's list has been activated on this listing. 

SOLICITATION POSTED 03/15/2021 

SOLICITATION AMENDMENT 0001 POSTED 03/15/2021

03/18/2021 - An email was received identifying that Attachment 10 was not specifications but rather an email, the incorrect Attachment 10 has been removed and the correct Attachment 10 has been uploaded.  Thank you! MMH

03/23/2021 SOLICITATION AMENDMENT 0002 POSTED  MMH

04/06/2021 Adding the Site Visit Sign In Sheet to the attachments for this requirement MMH 

Update #5 ·

The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement to construct trail stream crossings on Fort McCoy, Wisconsin.

Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to: Repair Bridge NRP03, removing old timber piers, earthwork, installation of precast concrete piers, installation of steel guardrail, erosion control, re-alignment of structure on new piers, and landscaping, AND Construct Stream Crossing B03, Construct Stream Crossing C11-1, Construct Stream Crossing C11-4, and Construct Stream Crossing C12-1 construction including: concrete culvert, earthwork, roadway construction, concrete cable mat, erosion control, and landscaping.

Work to be performed will be within the North American Industry Classification System (NAICS) Code 237310 with a small business size standard of $39.5 million.

Solicitation W911SA21B2006 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). 

It is anticipated that this requirement will be awarded as a single award, firm fixed-price contract. 

This solicitation will be Small Business HubZone Set Aside. 

Project magnitude is between $2,000,000 and $3,000,000.

Period of Performance: Work is to be completed NLT 30 June 2022. 

MICC Fort McCoy intends to issue the solicitation within 45 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted.

Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents. The interested Vendor's list has been activated on this listing. 

SOLICITATION POSTED 03/15/2021 

SOLICITATION AMENDMENT 0001 POSTED 03/15/2021

03/18/2021 - An email was received identifying that Attachment 10 was not specifications but rather an email, the incorrect Attachment 10 has been removed and the correct Attachment 10 has been uploaded.  Thank you! MMH

03/23/2021 SOLICITATION AMENDMENT 0002 POSTED  MMH

Update #4 ·

The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement to construct trail stream crossings on Fort McCoy, Wisconsin.

Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to: Repair Bridge NRP03, removing old timber piers, earthwork, installation of precast concrete piers, installation of steel guardrail, erosion control, re-alignment of structure on new piers, and landscaping, AND Construct Stream Crossing B03, Construct Stream Crossing C11-1, Construct Stream Crossing C11-4, and Construct Stream Crossing C12-1 construction including: concrete culvert, earthwork, roadway construction, concrete cable mat, erosion control, and landscaping.

Work to be performed will be within the North American Industry Classification System (NAICS) Code 237310 with a small business size standard of $39.5 million.

Solicitation W911SA21B2006 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). 

It is anticipated that this requirement will be awarded as a single award, firm fixed-price contract. 

This solicitation will be Small Business HubZone Set Aside. 

Project magnitude is between $2,000,000 and $3,000,000.

Period of Performance: Work is to be completed NLT 30 June 2022. 

MICC Fort McCoy intends to issue the solicitation within 45 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted.

Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents. The interested Vendor's list has been activated on this listing. 

SOLICITATION POSTED 03/15/2021 

SOLICITATION AMENDMENT 0001 POSTED 03/15/2021

03/18/2021 - An email was received identifying that Attachment 10 was not specifications but rather an email, the incorrect Attachment 10 has been removed and the correct Attachment 10 has been uploaded.  Thank you! MMH

Update #3 ·

The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement to construct trail stream crossings on Fort McCoy, Wisconsin.

Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to: Repair Bridge NRP03, removing old timber piers, earthwork, installation of precast concrete piers, installation of steel guardrail, erosion control, re-alignment of structure on new piers, and landscaping, AND Construct Stream Crossing B03, Construct Stream Crossing C11-1, Construct Stream Crossing C11-4, and Construct Stream Crossing C12-1 construction including: concrete culvert, earthwork, roadway construction, concrete cable mat, erosion control, and landscaping.

Work to be performed will be within the North American Industry Classification System (NAICS) Code 237310 with a small business size standard of $39.5 million.

Solicitation W911SA21B2006 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). 

It is anticipated that this requirement will be awarded as a single award, firm fixed-price contract. 

This solicitation will be Small Business HubZone Set Aside. 

Project magnitude is between $2,000,000 and $3,000,000.

Period of Performance: Work is to be completed NLT 30 June 2022. 

MICC Fort McCoy intends to issue the solicitation within 45 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted.

Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents. The interested Vendor's list has been activated on this listing. 

SOLICITATION POSTED 03/15/2021 

SOLICITATION AMENDMENT 0001 POSTED 03/15/2021

Update #2 ·

The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement to construct trail stream crossings on Fort McCoy, Wisconsin.

Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to: Repair Bridge NRP03, removing old timber piers, earthwork, installation of precast concrete piers, installation of steel guardrail, erosion control, re-alignment of structure on new piers, and landscaping, AND Construct Stream Crossing B03, Construct Stream Crossing C11-1, Construct Stream Crossing C11-4, and Construct Stream Crossing C12-1 construction including: concrete culvert, earthwork, roadway construction, concrete cable mat, erosion control, and landscaping.

Work to be performed will be within the North American Industry Classification System (NAICS) Code 237310 with a small business size standard of $39.5 million.

Solicitation W911SA21B2006 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). 

It is anticipated that this requirement will be awarded as a single award, firm fixed-price contract. 

This solicitation will be Small Business HubZone Set Aside. 

Project magnitude is between $2,000,000 and $3,000,000.

Period of Performance: Work is to be completed NLT 30 June 2022. 

MICC Fort McCoy intends to issue the solicitation within 45 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted.

Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents. The interested Vendor's list has been activated on this listing. 

SOLICITATION POSTED 03/15/2021 

Update #1 ·

The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement to construct trail stream crossings on Fort McCoy, Wisconsin.

Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to: Repair Bridge NRP03, removing old timber piers, earthwork, installation of precast concrete piers, installation of steel guardrail, erosion control, re-alignment of structure on new piers, and landscaping, AND Construct Stream Crossing B03, Construct Stream Crossing C11-1, Construct Stream Crossing C11-4, and Construct Stream Crossing C12-1 construction including: concrete culvert, earthwork, roadway construction, concrete cable mat, erosion control, and landscaping.

Work to be performed will be within the North American Industry Classification System (NAICS) Code 237310 with a small business size standard of $39.5 million.

Solicitation W911SA21B2006 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). 

It is anticipated that this requirement will be awarded as a single award, firm fixed-price contract. 

This solicitation will be Small Business HubZone Set Aside. 

Project magnitude is between $2,000,000 and $3,000,000.

Period of Performance: Work is to be completed NLT 30 June 2022. 

MICC Fort McCoy intends to issue the solicitation within 45 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted.

Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents. The interested Vendor's list has been activated on this listing. 

Attachments

Files attached to this notice, newest first
File Type Posted
W911SA21B2006 Bid Abstract Page 1 of 2.pdf PDF
W911SA21B2006 Bid Abstract Page 2 of 2.pdf PDF
W911SA21B2006 Attachment 12 Wage Determination Heavy 3 19 2021.docx DOCX document
W911SA21B2005 Amendment 0004.docx DOCX document
W911SA21B2006 Solicitation Amendment 0003.docx DOCX document
W911SA21B2006 Sign in Sheet from Site Visit.pdf PDF
W911SA21B2006 Solicitation Amendment 0002.docx DOCX document
W911SA21B2006 Attachment 10 Bid Specs C 12-1.pdf PDF
W911SA21B 2006 Solicitation Amendment 0001 .docx DOCX document
W911SA21B2006 Attachment 9 Drawings C11-4.pdf PDF
W911SA21B2006 Attachment 11 Drawings C12-1.pdf PDF
W911SA21B2006 Attachment 7 Drawings C11-1.pdf PDF
W911SA21B2006 Attachment 5 Drawings B03.pdf PDF
W911SA21B2006 Attachment 2 Bid Specs NRP03.pdf PDF
W911SA21B2006 Attachment 8 Bid Specs C11-4.pdf PDF
W911SA21B2006 Attachment 13 SF24 - Sample.pdf PDF
W911SA21B2006 Attachment 12 Wage Determination Heavy.docx DOCX document
W911SA21B2006 Attachment 1 AT OPSEC.pdf PDF
W911SA21B2006 Attachment 10 Bid Specs C12-1.pdf PDF
W911SA21B2006 Attachment 4 Bid Specs B03.pdf PDF
W911SA21B2006 Solicitation.docx DOCX document
W911SA21B2006 Attachment 6 Bid Specs C11-1.pdf PDF
W911SA21B2006 Attachment 3 Drawings NRP03.pdf PDF
Show all 23

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Construct Stream Crossing Award Award Notice
Construct Stream Crossings on Fort McCoy, WI This notice · Latest pre-solicitation Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity