This presolicitation notice is for the construction of five stream crossings at Fort McCoy, Wisconsin. The Mission and Installation Contracting Command at Fort McCoy requires a contractor to repair Bridge NRP03, construct Stream Crossing B03, construct Stream Crossing C11-1, construct Stream Crossing C11-4, and construct Stream Crossing C12-1. The work includes earthwork, installation of precast concrete piers and steel guardrails, erosion control, culverts, roadway construction, and landscaping. The North American Industry Classification System code for this work is 237310. The solicitation will be issued as an Invitation for Bids using procedures outlined in the FAR and DFARS. The requirement will be awarded as a single-award, firm fixed-price contract under a small business HubZone set-aside. The project value is estimated between $2-3 million. The period of performance must be completed by June 30, 2022. The solicitation is expected to be issued within 45 days, and interested parties can add themselves to the interested vendors list.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Stream Crossings on Fort McCoy, WI, newest first.
File Type Posted
W911SA21B2006 Bid Abstract Page 2 of 2.pdf PDF
W911SA21B2006 Bid Abstract Page 1 of 2.pdf PDF
W911SA21B2006 Attachment 12 Wage Determination Heavy 3 19 2021.docx DOCX document
W911SA21B2005 Amendment 0004.docx DOCX document
W911SA21B2006 Solicitation Amendment 0003.docx DOCX document
W911SA21B2006 Sign in Sheet from Site Visit.pdf PDF
W911SA21B2006 Solicitation Amendment 0002.docx DOCX document
W911SA21B2006 Attachment 10 Bid Specs C 12-1.pdf PDF
W911SA21B 2006 Solicitation Amendment 0001 .docx DOCX document
W911SA21B2006 Attachment 9 Drawings C11-4.pdf PDF
W911SA21B2006 Attachment 11 Drawings C12-1.pdf PDF
W911SA21B2006 Attachment 7 Drawings C11-1.pdf PDF
W911SA21B2006 Attachment 5 Drawings B03.pdf PDF
W911SA21B2006 Attachment 6 Bid Specs C11-1.pdf PDF
W911SA21B2006 Attachment 2 Bid Specs NRP03.pdf PDF
W911SA21B2006 Attachment 8 Bid Specs C11-4.pdf PDF
W911SA21B2006 Attachment 13 SF24 - Sample.pdf PDF
W911SA21B2006 Attachment 12 Wage Determination Heavy.docx DOCX document
W911SA21B2006 Attachment 1 AT OPSEC.pdf PDF
W911SA21B2006 Attachment 10 Bid Specs C12-1.pdf PDF
W911SA21B2006 Attachment 4 Bid Specs B03.pdf PDF
W911SA21B2006 Solicitation.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G0.1

Fort McCoy, Wisconsin

BRIDGE NRP03 GUARDRAILS

AND SUPPORTS

NOTES

A. ANY UTILITIES AND STRUCTURES SHOWN ON PLAN

DRAWINGS ARE APPROXIMATE IN LOCATION AND

DESCRIPTION AND ARE BASED ON RECORDS AVAILABLE

TO THE GOVERNMENT OR ON SURFACE FEATURES

INDICATING THEIR EXISTENCE. THERE MAY BE OTHER

UTILITIES WITHIN THE PROJECT AREA WHICH ARE NOT

SHOWN. THE LACK OF UTILITIES ON PLAN DRAWINGS IS

NOT AN INDICATION OF A UTILITY-FREE PROJECT SITE.

B. NOTIFY ALL AFFECTED UTILITY COMPANIES OF

CONSTRUCTION OPERATIONS AT LEAST THREE

WORKING DAYS BEFORE BEGINNING WORK NEAR THEIR

FACILITIES. DO NOT BEGIN EXCAVATION WORK UNTIL

UNDERGROUND UTILITY LOCATIONS HAVE BEEN

MARKED OR THE UTILITY COMPANY HAS SENT NOTICE

THAT THE AREA IS CLEAR.

C. SCALES SHOWN ONLY APPLY WHEN THESE

DRAWINGS ARE PRINTED ON 22" x 34" PAPER. SCALES

ARE HALF SIZED WHEN PRINTED ON 11" x 17" PAPER.

PHONE: 608.782.3161

329 JAY ST, SUITE 301

LA CROSSE, WI 54601

www.sehinc.com

G0.2

DIGGERS HOTLINE

Dial or (800)242-8511 www.DiggersHotline.com

LOCATION MAP

GENERAL NOTES

C1.1

Horz Scale: 1:10 Vert Scale 1" = 5'

PLAN AND PROFILE - NRP-03

2 2 2

3 3 3

S5.0

Scale: 3/8" = 1'-0"

PLAN VIEW

Scale: 3/8" = 1'-0"

ABUTMENT & PIER PANELS SECTION

Scale: 3/8" = 1'-0"

ABUTMENT & PIER PANELS ELEVATION

4 5

S5.1

Scale: 3" = 1'-0"

GUIDERAIL POST A

Scale: 3" = 1'-0"

GUIDERAIL POST A BASE

Scale: 3" = 1'-0"

GUARDRAIL POST B

Scale: 3" = 1'-0"

GUARDRAIL POST B BASE

Scale: 1" = 1'-0"

CONCRETE PANELS

Scale: 1/2" = 1'-0"

END MARKER SIGNS