W911SA21B2006 Attachment 9 Drawings C11-4.pdf

PDF 5 MB Posted

Attached to
Construct Stream Crossings on Fort McCoy, WI Federal contract opportunity
Solicitation number
W911SA21B2006
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort McCoy

About this file

This pre-solicitation notice and related documents outline requirements for a firm fixed-price construction contract to perform stream crossing work at Fort McCoy in Wisconsin. The Mission and Installation Contracting Command at Fort McCoy requires contractors to construct five new stream crossings and repair an existing bridge. Work includes earthwork, installation of precast concrete piers and steel guardrails, culvert installation, road construction, erosion control measures, and landscaping. The contract is set aside for small business HUBZone firms with a value between $2-3 million. The period of performance is to be completed by June 30, 2022. The solicitation will be issued as an invitation for bids using procedures in FAR Part 14 and is anticipated to result in a single award. Interested vendors can add themselves to the interested vendors list to receive notices regarding associated documents and amendments.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Stream Crossings on Fort McCoy, WI, newest first.
File Type Posted
W911SA21B2006 Bid Abstract Page 1 of 2.pdf PDF
W911SA21B2006 Bid Abstract Page 2 of 2.pdf PDF
W911SA21B2006 Attachment 12 Wage Determination Heavy 3 19 2021.docx DOCX document
W911SA21B2005 Amendment 0004.docx DOCX document
W911SA21B2006 Solicitation Amendment 0003.docx DOCX document
W911SA21B2006 Sign in Sheet from Site Visit.pdf PDF
W911SA21B2006 Solicitation Amendment 0002.docx DOCX document
W911SA21B2006 Attachment 10 Bid Specs C 12-1.pdf PDF
W911SA21B 2006 Solicitation Amendment 0001 .docx DOCX document
W911SA21B2006 Attachment 11 Drawings C12-1.pdf PDF
W911SA21B2006 Attachment 7 Drawings C11-1.pdf PDF
W911SA21B2006 Attachment 5 Drawings B03.pdf PDF
W911SA21B2006 Attachment 2 Bid Specs NRP03.pdf PDF
W911SA21B2006 Attachment 8 Bid Specs C11-4.pdf PDF
W911SA21B2006 Attachment 13 SF24 - Sample.pdf PDF
W911SA21B2006 Attachment 12 Wage Determination Heavy.docx DOCX document
W911SA21B2006 Attachment 1 AT OPSEC.pdf PDF
W911SA21B2006 Attachment 10 Bid Specs C12-1.pdf PDF
W911SA21B2006 Attachment 4 Bid Specs B03.pdf PDF
W911SA21B2006 Solicitation.docx DOCX document
W911SA21B2006 Attachment 6 Bid Specs C11-1.pdf PDF
W911SA21B2006 Attachment 3 Drawings NRP03.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G0.1

Fort McCoy, Wisconsin

CONSTRUCT

TRAIL

STREAM CROSSING C11-4

NOTES

A. ANY UTILITIES AND STRUCTURES SHOWN ON PLAN

DRAWINGS ARE APPROXIMATE IN LOCATION AND

DESCRIPTION AND ARE BASED ON RECORDS AVAILABLE

TO THE GOVERNMENT OR ON SURFACE FEATURES

INDICATING THEIR EXISTENCE. THERE MAY BE OTHER

UTILITIES WITHIN THE PROJECT AREA WHICH ARE NOT

SHOWN. THE LACK OF UTILITIES ON PLAN DRAWINGS IS

NOT AN INDICATION OF A UTILITY-FREE PROJECT SITE.

B. NOTIFY ALL AFFECTED UTILITY COMPANIES OF

CONSTRUCTION OPERATIONS AT LEAST THREE

WORKING DAYS BEFORE BEGINNING WORK NEAR THEIR

FACILITIES. DO NOT BEGIN EXCAVATION WORK UNTIL

UNDERGROUND UTILITY LOCATIONS HAVE BEEN

MARKED OR THE UTILITY COMPANY HAS SENT NOTICE

THAT THE AREA IS CLEAR.

C. SCALES SHOWN ONLY APPLY WHEN THESE

DRAWINGS ARE PRINTED ON 22" x 34" PAPER. SCALES

ARE HALF SIZED WHEN PRINTED ON 11" x 17" PAPER.

PHONE: 608.782.3161

329 JAY ST, SUITE 301

LA CROSSE, WI 54601

www.sehinc.com

G0.2

LOCATION MAP

GENERAL NOTES

DIGGERS HOTLINE

Dial or (800)242-8511 www.DiggersHotline.com

C0.1

Scale: NTS

TYPICAL FINISHED SECTION

Scale: NTS

TYPICAL MARSH EXCAVATION

Scale: NTS

TYPICAL SECTION - WORKING/STAGING AREA

C0.2

OBJECT MARKER

C0.3

80 80

80 80

C1.1

Horz Scale: 1:20 Vert Scale 1" = 5'

PLAN AND PROFILE - C11-4

C1.2

Horz Scale: 1:10

PLAN DETAIL - C11-4

C3.1

S0.1

SUBSURFACE EXPLORATION

1"=40' HORIZONTAL, 1"=10' VERTICAL

GENERAL STRUCTURE PLAN

1"=5' HORIZONTAL

S5.0

S5.1