Construct Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9128F20R0085
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Colorado Springs CO 80914 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation requests proposals for the construction of a Special Operations Command - North Theater Operational Support Facility at Peterson Air Force Base in Colorado. The U.S. Army Corps of Engineers Engineering District Omaha seeks to award a firm-fixed price contract for design and construction services not to exceed $47 million. Proposals will be evaluated based on the offeror's experience, risk management approach, key personnel qualifications, small business participation plan, and past performance. Proposals are due by February 3, 2021.
There is no set-aside designation for this procurement. Construction is to be completed within 840 calendar days of award. The facility will total approximately 90,255 square feet and include administrative offices, secured areas, utilities infrastructure, site work and pavements. Evaluation criteria emphasizes experience with similar military construction projects valued over $20 million. The place of performance is Peterson Air Force Base in Colorado.
Notice text
13 versions
Update #13 · Latest ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files.
10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00.
10/28/2020: Am-0003 issued. It revises specs, resissues some drawings, and extends the close date to 02 December 2020.
11/5/2020: AM-0004 issued. It revises specs and reissues some drawings.
11/13/2020: AM-0005 issued. It revises specs and reissues some drawings, extends the Bidder Inquiry date to 02 December 2020 and extends the close date to 06 January 2021.
11/20/2020: Am-0006 issued. It reissues various spec sections, adds a spec attachment, and reissues 16 drawings.
12/04/2020: Am-0007 isued. It reissues 8 spec sections and 16 drawings.
12/9/2020: This change is to advise interested parties that ProjNet will remain open for questions and inquiries through 15 Dec. An amendment is forthcoming.
12/10/2020: Am-0008 Issued. It revised the duration to a fixed 840 calendar days, clarifies that bidder inquiries will remain open until 15 DEC, and reissues various spec sections including a page from Appendix C – FF&E. It also reissues 7 drawings.
12/18/2020: Am-0009 issued. It updates the wage rates and reissues 3 specs and 18 drawings.
12/21/2020: Am-0010 issued. It extends the proposal due date to 3 Feb 2021.
1/19/2021: Am-0011 issued. It updates wage rates, reissues 5 specs and 32 drawings. It also states that bidder inquiries will be open until COB on 21 JAN.
Update #12 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files.
10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00.
10/28/2020: Am-0003 issued. It revises specs, resissues some drawings, and extends the close date to 02 December 2020.
11/5/2020: AM-0004 issued. It revises specs and reissues some drawings.
11/13/2020: AM-0005 issued. It revises specs and reissues some drawings, extends the Bidder Inquiry date to 02 December 2020 and extends the close date to 06 January 2021.
11/20/2020: Am-0006 issued. It reissues various spec sections, adds a spec attachment, and reissues 16 drawings.
12/04/2020: Am-0007 isued. It reissues 8 spec sections and 16 drawings.
12/9/2020: This change is to advise interested parties that ProjNet will remain open for questions and inquiries through 15 Dec. An amendment is forthcoming.
12/10/2020: Am-0008 Issued. It revised the duration to a fixed 840 calendar days, clarifies that bidder inquiries will remain open until 15 DEC, and reissues various spec sections including a page from Appendix C – FF&E. It also reissues 7 drawings.
12/18/2020: Am-0009 issued. It updates the wage rates and reissues 3 specs and 18 drawings.
12/21/2020: Am-0010 issued. It extends the proposal due date to 3 Feb 2021.
Update #11 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files.
10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00.
10/28/2020: Am-0003 issued. It revises specs, resissues some drawings, and extends the close date to 02 December 2020.
11/5/2020: AM-0004 issued. It revises specs and reissues some drawings.
11/13/2020: AM-0005 issued. It revises specs and reissues some drawings, extends the Bidder Inquiry date to 02 December 2020 and extends the close date to 06 January 2021.
11/20/2020: Am-0006 issued. It reissues various spec sections, adds a spec attachment, and reissues 16 drawings.
12/04/2020: Am-0007 isued. It reissues 8 spec sections and 16 drawings.
12/9/2020: This change is to advise interested parties that ProjNet will remain open for questions and inquiries through 15 Dec. An amendment is forthcoming.
12/10/2020: Am-0008 Issued. It revised the duration to a fixed 840 calendar days, clarifies that bidder inquiries will remain open until 15 DEC, and reissues various spec sections including a page from Appendix C – FF&E. It also reissues 7 drawings.
12/18/2020: Am-0009 issued. It updates the wage rates and reissues 3 specs and 18 drawings.
Update #10 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files.
10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00.
10/28/2020: Am-0003 issued. It revises specs, resissues some drawings, and extends the close date to 02 December 2020.
11/5/2020: AM-0004 issued. It revises specs and reissues some drawings.
11/13/2020: AM-0005 issued. It revises specs and reissues some drawings, extends the Bidder Inquiry date to 02 December 2020 and extends the close date to 06 January 2021.
11/20/2020: Am-0006 issued. It reissues various spec sections, adds a spec attachment, and reissues 16 drawings.
12/04/2020: Am-0007 isued. It reissues 8 spec sections and 16 drawings.
12/9/2020: This change is to advise interested parties that ProjNet will remain open for questions and inquiries through 15 Dec. An amendment is forthcoming.
12/10/2020: Am-0008 Issued. It revised the duration to a fixed 840 calendar days, clarifies that bidder inquiries will remain open until 15 DEC, and reissues various spec sections including a page from Appendix C – FF&E. It also reissues 7 drawings.
Update #9 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files.
10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00.
10/28/2020: Am-0003 issued. It revises specs, resissues some drawings, and extends the close date to 02 December 2020.
11/5/2020: AM-0004 issued. It revises specs and reissues some drawings.
11/13/2020: AM-0005 issued. It revises specs and reissues some drawings, extends the Bidder Inquiry date to 02 December 2020 and extends the close date to 06 January 2021.
11/20/2020: Am-0006 issued. It reissues various spec sections, adds a spec attachment, and reissues 16 drawings.
12/04/2020: Am-0007 isued. It reissues 8 spec sections and 16 drawings.
12/9/2020: This change is to advise interested parties that ProjNet will remain open for questions and inquiries through 15 Dec. An amendment is forthcoming.
Update #8 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files.
10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00.
10/28/2020: Am-0003 issued. It revises specs, resissues some drawings, and extends the close date to 02 December 2020.
11/5/2020: AM-0004 issued. It revises specs and reissues some drawings.
11/13/2020: AM-0005 issued. It revises specs and reissues some drawings, extends the Bidder Inquiry date to 02 December 2020 and extends the close date to 06 January 2021.
11/20/2020: Am-0006 issued. It reissues various spec sections, adds a spec attachment, and reissues 16 drawings.
12/04/2020: Am-0007 isued. It reissues 8 spec sections and 16 drawings.
Update #7 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files.
10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00.
10/28/2020: Am-0003 issued. It revises specs, resissues some drawings, and extends the close date to 02 December 2020.
11/5/2020: AM-0004 issued. It revises specs and reissues some drawings.
11/13/2020: AM-0005 issued. It revises specs and reissues some drawings, extends the Bidder Inquiry date to 02 December 2020 and extends the close date to 06 January 2021.
11/20/2020: Am-0006 issued. It reissues various spec sections, adds a spec attachment, and reissues 16 drawings.
Update #6 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files.
10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00.
10/28/2020: Am-0003 issued. It revises specs, resissues some drawings, and extends the close date to 02 December 2020.
11/5/2020: AM-0004 issued. It revises specs and reissues some drawings.
11/13/2020: AM-0005 issued. It revises specs and resiisues some drawings, extends the Bidder Inquiry date to 02 December 2020 and extends the close date to 06 January 2021.
Update #5 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files.
10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00.
10/28/2020: Am-0003 issued. It revises specs, resissues some drawings, and extends the close date to 02 December 2020.
11/5/2020: AM-0004 issued. It revises specs and reissues some drawings.
Update #4 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files.
10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00.
10/28/2020: Am-0003 issued. It revises specs, resissues some drawings, and extends the close date to 02 December 2020.
Update #3 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued. Provides instructions on requesting CAD/BIM files.
10/21/2020: Am-0002 issued. It revises specs, reissues some drawings, and reissues section 00 22 00.
Update #2 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
10/13/2020: Am-0001 issued.
Update #1 ·
Construction of a Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
This solicitation is unrestricted
Files
Show all 13
Notice history
| Notice | Type | Posted |
|---|---|---|
| Construct Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado | Award Notice | |
| This notice | Solicitation | |
| Construct Contract Special Operations Command – North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT | ENDIST Wilmington | No set-aside |