Am-0009_W9128F-20-R-0085.pdf
PDF 17 MB Posted
- Solicitation number
- W9128F20R0085
About this file
This solicitation requests construction services for a Special Operations Command - North (SOCNORTH), Theater Operational Support Facility at Peterson AFB, Colorado. The Department of the Army Corps of Engineers Engineering District Omaha seeks to award a firm fixed-price construction contract for building the facility. Responses are due by April 23, 2020, with the contract award anticipated by June 2020. The solicitation is unrestricted with no set-asides. The selected contractor will be responsible for all aspects of constructing the SOCNORTH facility in accordance with provided drawings and specifications.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0009 W9128F
SOCNORTH THEATER OPERATIONAL SUPPORT FACILITY, PN TDKA 143002 (FY20), PETERSON AFB, COLORADO
See attached documentation for content of the amendment revisions to solicitation
Date for receipt of proposals is 06 JAN 2021 at 1400 hours
Government Point of Contact: Bill Rawe, Contract Specialist, William.T.Rawe@usace.army.mil
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919
See Item 6
W9128F-20-R-0085
12/18/2020
10/06/2020
12/18/2020
Am #0009 - 1
Am #0009 - 2 (Continuation SF 30)
18 December 2020 Solicitation No. W9128F 20 R 0085
Date of Issue: 13 NOV 2020 Date of Receiving Proposals: 06 JAN 2021
SUBJECT: Amendment No. 0009 to Request for Proposal Solicitation Package for Construction of SOCNORTH THEATER OPERATIONAL SUPPORT FACILITY.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number CO20200002 in its entirety and substitute General Wage Rate Decision Number CO20200002 dated 12/18/2020. General Wage Rate Decision Number CO20200002 dated 12/18/2020 is included as an attachment to this Amendment.
(2) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number CO20200022 in its entirety and substitute General Wage Rate Decision Number CO20200022 dated 12/18/2020. General Wage Rate Decision Number CO20200022 dated 12/18/2020 is included as an attachment to this Amendment.
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.
Pages or Sections Deleted Pages or Sections Substituted or Added 01 86 26 01 86 26 01 86 29 01 86 29 Appendix C – FF&E Appendix C – FF&E
c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.
1. SHEET G-301, FIRST FLOOR SECURITY REQUIREMENTS PLAN
2. SHEET G-302, SECOND FLOOR SECURITY REQUIREMENTS PLAN
3. SHEET C4.01, SOCNORTH SITE GRADING AND DRAINAGE PLAN
4. SHEET U1.01, SOCNORTH UTILITY PLAN
5. SHEET A-102B, SECOND FLOOR PLAN - AREA B
6. SHEET I-102A, SECOND FLOOR FURNITURE PLAN - AREA A
7. SHEET I-102B, SECOND FLOOR FURNITURE PLAN - AREA B
8. SHEET E-104, SECOND FLOOR LIGHTING PLAN - AREA B
9. SHEET E-201, FIRST FLOOR POWER PLAN - AREA A
Am #0009 - 3 (Continuation SF 30)
10. SHEET E-202, FIRST FLOOR POWER PLAN - AREA B
11. SHEET E-203, SECOND FLOOR POWER PLAN - AREA A
12. SHEET E-204, SECOND FLOOR POWER PLAN - AREA B
13. SHEET E-602, PARTIAL SECONDARY ELECTRICAL ONE LINE DIAGRAM
14. SHEET E-603, PARTIAL SECONDARY ELECTRICAL ONE LINE DIAGRAM
15. SHEET T-000, TELECOM SYMBOLS AND ABBREVIATIONS
16. SHEET T-102B, SECOND FLOOR PLAN - AREA B – TELECOM
17. SHEET AV-000, AUDIOVISUAL SYMBOLS AND ABBREVIATIONS
18. SHEET AV-102B, SECOND FLOOR PLAN - AREA B - AUDIOVISUAL
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.
4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 06 JAN 2021.
Attachments:
General Wage Rate Decisions CO20200002 dated 12/18/2020 CO20200022 dated 12/18/2020 Specifications listed in 1.b., above Drawings listed in 1.c., above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
18 DEC 2020
nep/2160
This page was intentionally left blank for duplex printing.
Am #0009 CO20200002 - 1 12/18/2020
General Decision Number: CO20200002 12/18/2020
Superseded General Decision Number: CO20190002
State: Colorado
Construction Type: Heavy
Counties: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld Counties in Colorado.
HEAVY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/31/2020 2 08/28/2020 3 10/30/2020 4 12/18/2020
Am #0009 CO20200002 - 2 12/18/2020
ASBE0028-001 07/01/2019
Rates Fringes
Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 32.98 14.73
BRCO0007-004 01/01/2019
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,
JEFFERSON AND WELD COUNTIES
BRICKLAYER.......................$ 29.52 10.48
BRCO0007-006 05/01/2018
EL PASO AND PUEBLO COUNTIES
Rates Fringes
BRICKLAYER.......................$ 25.88 10.34
ELEC0012-004 06/01/2019
PUEBLO COUNTY
Rates Fringes
ELECTRICIAN
Electrical contract over $1,000,000..................$ 27.50 12.50+3% Electrical contract under $1,000,000..................$ 24.85 12.50+3%
ELEC0068-001 06/01/2020
JEFFERSON, LARIMER, AND WELD COUNTIES
ELECTRICIAN......................$ 38.00 16.97
ELEC0111-001 09/01/2020
Am #0009 CO20200002 - 3 12/18/2020
Line Construction:
Groundman...................$ 22.04 24.25%+6.80 Line Equipment Operator.....$ 35.61 24.25%+6.80 Lineman and Welder..........$ 49.45 24.25%+6.80
ELEC0113-002 06/01/2020
EL PASO COUNTY
Rates Fringes
ELECTRICIAN......................$ 33.25 3%+15.75
ELEC0969-002 06/01/2019
MESA COUNTY
Rates Fringes
ELECTRICIAN......................$ 25.20 10.06
ENGI0009-001 05/01/2020
Rates Fringes
Power equipment operators:
Blade: Finish...............$ 30.37 11.15 Blade: Rough................$ 30.37 11.15 Bulldozer...................$ 30.37 11.15 Cranes: 50 tons and under..$ 30.20 11.15 Cranes: 51 to 90 tons......$ 30.47 11.15 Cranes: 91 to 140 tons.....$ 31.55 11.15 Cranes: 141 tons and over...$ 33.67 11.15 Forklift....................$ 29.67 11.15 Mechanic....................$ 30.53 11.15 Oiler.......................$ 29.29 11.15 Scraper: Single bowl under 40 cubic yards........$ 30.20 11.15 Scraper: Single bowl, including pups 40 cubic yards and over and tandem bowls.......................$ 30.37 11.15 Trackhoe....................$ 30.20 11.15
* IRON0024-003 11/01/2020
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 32.00 12.01
Structural
LABO0086-001 05/01/2009
Am #0009 CO20200002 - 4 12/18/2020
Laborers:
Pipelayer...................$ 18.68 6.78
PLUM0003-005 06/01/2017
JEFFERSON, LARIMER AND WELD COUNTIES
PLUMBER..........................$ 39.08 16.44
PLUM0058-002 07/01/2018
EL PASO COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 32.75 14.85
PLUM0058-008 07/01/2018
PUEBLO COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 32.75 14.85
PLUM0145-002 07/01/2016
MESA COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 35.17 11.70
PLUM0208-004 06/01/2016
JEFFERSON, LARIMER AND WELD COUNTIES
PIPEFITTER.......................$ 37.10 16.62
SHEE0009-002 07/01/2019
Am #0009 CO20200002 - 5 12/18/2020
Sheet metal worker...............$ 34.62 17.95
TEAM0455-002 07/01/2020
Rates Fringes
Truck drivers:
Pickup......................$ 22.66 4.42 Tandem/Semi and Water.......$ 23.29 4.42
SUCO2001-006 12/20/2001
Rates Fringes
BOILERMAKER......................$ 17.60
Carpenters:
Form Building and Setting...$ 16.97 2.74 All Other Work..............$ 15.14 3.37
Cement Mason/Concrete Finisher...$ 17.31 2.85
IRONWORKER, REINFORCING..........$ 18.83 3.90
Laborers:
Common......................$ 11.22 2.92 Flagger.....................$ 8.91 3.80 Landscape...................$ 12.56 3.21
Painters:
Brush, Roller & Spray.......$ 15.81 3.26
Power equipment operators:
Backhoe.....................$ 16.36 2.48 Front End Loader............$ 17.24 3.23 Skid Loader.................$ 15.37 4.41
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other
Am #0009 CO20200002 - 6 12/18/2020 health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates
Am #0009 CO20200002 - 7 12/18/2020 the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Am #0009 CO20200002 - 8 12/18/2020
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Am #0009 CO20200022 - 1 12/18/2020
General Decision Number: CO20200022 12/18/2020
Superseded General Decision Number: CO20190022
State: Colorado
Construction Type: Building
County: El Paso County in Colorado.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/10/2020 2 01/24/2020 3 08/28/2020 4 10/30/2020 5 12/18/2020
Am #0009 CO20200022 - 2 12/18/2020
ASBE0028-002 07/01/2019
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 32.98 14.73
ELEC0113-005 06/01/2020
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring)..................$ 33.25 3%+15.75
ELEV0025-001 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 46.53 35.245
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0009-017 05/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
(Crane) 141 tons and over...........$ 31.07 10.70 50 tons and under...........$ 28.40 10.70 51 to 90 tons...............$ 28.57 10.70 91 to 140 tons..............$ 29.55 10.70
* IRON0024-009 11/01/2020
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 32.00 12.01
* IRON0024-011 11/01/2020
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 32.00 12.01
Am #0009 CO20200022 - 3 12/18/2020
PAIN0079-009 08/01/2017
PAINTER (Spray)..................$ 20.50 8.41
PLAS0577-002 05/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.00 12.95
PLUM0058-003 07/01/2020
Rates Fringes
PLUMBER (Excludes HVAC Duct, Pipe and Unit Installation)......$ 34.85 15.77
PLUM0058-004 07/01/2020
Rates Fringes
PIPEFITTER, Includes HVAC Pipe Installation (Excludes HVAC Duct and Unit Installation)....................$ 34.85 15.77
SFCO0669-002 04/01/2020
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 38.23 24.78
SHEE0009-005 07/01/2019
Rates Fringes
SHEET METAL WORKER (Excludes HVAC Duct, Pipe and Unit Installation)....................$ 34.62 17.95
SUCO2013-008 07/31/2015
Rates Fringes
BRICKLAYER.......................$ 21.96 0.00
CARPENTER........................$ 22.63 6.98
LABORER: Common or General......$ 13.40 1.40
LABORER: Mason Tender - Brick...$ 15.99 0.00
Am #0009 CO20200022 - 4 12/18/2020
LABORER: Mason Tender - Cement/Concrete..................$ 16.00 0.00
LABORER: Pipelayer..............$ 16.96 3.68
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 20.26 8.62
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.58 2.42
OPERATOR: Grader/Blade..........$ 21.50 0.00
PAINTER (Brush and Roller).......$ 17.20 0.00
ROOFER...........................$ 16.71 0.00
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 25.18 6.30
SHEET METAL WORKER (HVAC Unit Installation Only)...............$ 24.00 2.18
TRUCK DRIVER: Dump Truck........$ 17.34 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
Am #0009 CO20200022 - 5 12/18/2020
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Am #0009 CO20200022 - 6 12/18/2020
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Am #0009 CO20200022 - 7 12/18/2020
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
This page was intentionally left blank for duplex printing.
SOCNORTH Theater Operational Support Facility - Peterson AFB PE83
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 86 26
ELECTRICAL REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SCOPE OF WORK
1.2.1 General Electrical Scope of Work
1.2.2 New Utility Power Feeds, Generator and UPS
1.2.3 SOCNORTH Theater Support Building Electric Service
1.2.4 SOCNORTH Theater Facility
1.2.4.1 Separation of Systems
1.2.5 Unclean Beacon Systems
1.2.6 Exit-Only Doors
1.2.7 Raised Access Floor Areas
1.2.8 Antenna Farms
1.2.9 Cyber Security
PART 2 PRODUCTS & INSTALLATION
2.1 Standard Products
2.2 Environmental Conditions
2.3 Color of Exterior Equipment
2.4 Accommodation of Disabilities
2.5 Antiterrorism/Force Protection
2.5.1 Unobstructed Space
2.5.2 Electrical and Mechanical Equipment
2.5.3 Utility Distribution and Installation
2.6 Coordination of Electrical Criteria
2.7 Exterior Primary Electrical Distribution System
2.7.1 Manholes
2.7.2 Ductbanks
2.7.3 Medium Voltage Cables and Conduit
2.7.4 Connections to Manholes
2.7.5 Connections to Existing Underground Structures
2.7.6 Partially Completed Duct Banks
2.7.7 Fittings
2.7.7.1 Metal Fittings
2.7.7.2 PVC Conduit Fittings
2.7.7.3 PVC Duct Fittings
2.7.8 Duct Sealant
2.7.9 CAST-IN-PLACE CONCRETE
2.7.10 Terminations and Splices
2.7.11 Separable Insulated Connector Type
2.7.12 Above Ground Equipment
2.8 Pad-Mounted Tamperproof Compartmental Transformers
2.8.1 Locations
2.8.2 Clearances
2.8.3 Grounding
2.8.4 Over-Current Protection
2.9 Underground Service Entrance/Feeder/Branch Circuits
SECTION 01 86 26 Page 1Am #0009
2.10 Conductors
2.11 Conduits
2.12 Exterior Lighting System
2.12.1 Exterior Building Lighting
2.12.2 Exterior LED Lighting Fixtures
2.12.3 Exterior Lighting Controls
2.12.4 Underground Lighting Circuits
2.13 Services of "Corrosion Expert"
2.14 Sacrificial Cathodic Protection System
2.14.1 Test Stations
2.14.2 Cathodic Protection for Tracer Wire
2.14.3 Installation Documentation.
2.15 Lightning Protection System
2.16 Underground Cable Markings
2.17 Interior Distribution
2.17.1 Cable Marking
2.17.2 Solid-State Circuit Breakers
2.18 Service Equipment [*Am-6] and Switchboards [**Am-6]
2.19 Panelboards
2.20 Advanced Metering
2.21 Conference Rooms
2.22 Power System Analysis
2.22.1 Determination of Facts
2.22.2 Single Line Diagram
2.22.3 Short Circuit Study
2.22.3.1 Method
2.22.3.1.1 Data
2.22.3.1.2 Fault Current Availability
2.22.4 Protective Coordination Study
2.22.5 Arc Flash Hazard Study
2.22.6 Study Report
2.22.7 Field Adjustment
2.22.8 Arc Flash Labels
2.23 Motors
2.24 General Purpose Receptacle Outlets
2.24.1 Special Receptacles
2.24.2 Computer Receptacles
2.24.3 Computer Loads
2.24.4 Desks and Workstations
2.24.5 Automatic Receptacle Control
2.25 Wiring Devices and Cover Plates
2.26 Other Loads
2.27 Architectural/Mechanical Connections
2.28 Wiring Methods
2.28.1 Conductors
2.28.2 Conduits
2.29 Interior Lighting System
2.29.1 Illumination Levels
2.29.1.1 Calculations
2.29.1.2 Circulation/Commuting Space Illumination Levels
2.29.2 Conservation and Controls Requirements
2.29.3 Scene-Based Dimming
2.29.4 Personal Lighting Control
2.29.5 Testing Agent Title
2.29.6 Manufacturer Support
2.29.7 Incandescent [*Am-6] and Flourescent [**Am-6] Lighting
Fixtures
2.29.8 Interior Lighting Fixtures
2.29.8.1 Interior LED Lighting Fixtures
SECTION 01 86 26 Page 2Am #0009
2.29.9 Egress and Exit Lighting Fixtures
2.30 CABLE INSPECTION
2.30.1 CABLE INSTALLATION PLAN AND PROCEDURE
2.31 Grounding System
2.31.1 Grounding and Bonding
2.31.2 Communications Grounding System
2.31.3 Ground Bus
2.31.4 Equipment Grounding Conductors
2.31.5 Earth Electrode System
2.31.6 Separately Derived System
2.32 Equipment Sizing Requirements and Ratings
2.32.1 Interrupting Capacities
2.32.2 Feeders and Branch Circuits
2.32.3 Transformer Feeders
2.32.4 Neutral Sizing
2.32.5 Derating
2.32.6 Nuisance Tripping
2.33 Installation
2.34 Alternative/Supplemental Energy Production Systems
PART 3 FIELD QUALITY CONTROL
3.1 Testing
3.2 Devices Subject to Manual Operation
3.3 600-Volt Wiring Test
3.4 Transformer Tests
3.5 Ground-Fault Receptacle Test
3.6 Grounding System Test
3.7 Watthour Meter
3.8 Medium Voltage Cables
3.9 Follow-Up Verification
-- End of Section Table of Contents --
SECTION 01 86 26 Page 3Am #0009
SECTION 01 86 26
ELECTRICAL REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
Publications, codes, specifications and standards shall be used as the basis for the project design and shall include, but not be limited to the following. Publications and codes that imply recommendations shall be taken to be mandatory. Where there are conflicting criteria, the requirements of this RFP take precedence.
The design publications listed below shall be used as sources of criteria for the design. The most current edition of the code or standard (with errata and addenda) available at the RFP proposal submission deadline shall be used as criteria for the design - unless noted otherwise. The criteria from these sources may be supplemented, but not supplanted, by applicable criteria contained in nationally recognized codes and standards.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 90.1 - IP (2013; INT 1 2013; Errata 1-2 2013) Energy Standard for Buildings Except Low-Rise Residential Buildings
ASHRAE 189.1 (2014) Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings
U.S. AIR FORCE (USAF)
AF 91-501 Air Force Consolidated Occupational Safety Standard
AFGM 2017-32-01 Air Force Guidance Memorandum, Civil Engineer Control Systems Cybersecurity
AFI 16-1404 Air Force Information Security Program
AFI 16-1406 Air Force Industrial Security Program
AFI 31-101_IC2 Integrated Defense
AFI 32-1054 Corrosion Control
AFI 32-1065 Grounding Systems
AFI 33-210 Certification and Accreditation (C&A) Program
AFMAN 32-1082 Facilities Engineering Electrical Exterior Facilities
SECTION 01 86 26 Page 4Am #0009
AFMAN 32-1083 Facilities Engineering Electrical Interior Facilities
AFMAN 32-1084 Facility Requirements
AFPAM 32-1186 Valve-Regulated Leaad-Acid Batteries for Stationary Applications
ETL 01-18 [*Am-7] (2001) [**Am-7] Fire Protection Engineering - Electronic Equipment Installations
ETL 11-10 Electrical Manhole Design Consideration
ETL 12-15 Light-Emitting Diode (LED) Fixture Design and Installation Criteria for Interior and Exterior Lighting Applications
ETL 13-4 Standby Generator Design, Maintenance, and Testing Criteria
AMERICAN SOCIETY FOR TESTING AND MATERIALS INTERNATIONAL (ASTM)
ASTM F2160 Standard Specification for Solid Wall High Density Polyethylene (HDPE) Conduit Based on Controlled Outside Diameter (OD)
U.S. ARMY CORPS OF ENGINEERS (USACE)
ODDG [*Am-5] July 2019 [**Am-5] Omaha District Design Guide for Design Solicitations
EM 385-1-1 Safety and Health Requirements Manual
PETERSON AIR FORCE BASE CRITERIA
IFS (Jul 2018) Peterson AFB Installation Facilities Standards
Construction Standards (May 2020) Peterson Air Force Base Construction Standards
U.S. DEPARTMENT OF AGRICULTURE (USDA)
RUS Bull 1728F-806 Specifications and Drawings for Underground Electrical Distribution
Publication 202-1 LIST OF MATERIALS, Acceptable for Use on Systems Of USDA Rural Development Electrification Borrowers
U.S. DEPARTMENT OF THE ARMY
AR 380-5 Department of the Army Information Security Program
SECTION 01 86 26 Page 5Am #0009
U.S. DEPARTMENT OF DEFENSE (DOD)
DoD Manual 5105.21 Sensitive Compartmented Information Facilities
DODM 5200.01-V1 (Volume 1) DoD Information Security Program: Overview, Classification, and Declassification
FED-STD 795 Uniform Federal Accessibility Standards
MIL-HDBK 232 (1987; Rev A; Notice 1 1988; Notice 2 2000; Notice 3 2014) Red/Black Engineering
- Installation Guidelines
MIL-HDBK-411B Power and the Environment for Sensitive DOD Electronic Equipment
MIL-HDBK-419 Grounding, Bonding, and Shielding for Electronic Equipments and Facilities Volumes 1 of 2 Basic Theory
UFC 1-200-01 (2019) DoD Building Code (General Building Requirements)
UFC 1-200-02 (2016, Change 4, 2019) High Performance and Sustainable Building Requirements
UFC 3-501-01 (2015; Change 1, 2019) Electrical Engineering
UFC 3-520-01 (2015; Change 1, 2019) Interior Electrical Systems
UFC 3-520-05 (2015; Change 2, 2020) Stationary and Mission Batteries
UFC 3-530-01 (2020) Interior and Exterior Lighting Systems and Controls
UFC 3-540-01 (2014; Change 2, 2019) Engine-Driven Generator Systems for Prime and Standby Power Applications
UFC 3-550-01 (2016; Change 3, 2019) Exterior Electrical Power Distribution
UFC 3-560-01 (2017; Change 2, 2019) Electrical Safety, O&M
UFC 3-570-01 (2016; Change 1, 2019) Cathodic Protection
UFC 3-575-01 (2012) Lightning and Static Electricity Protection Systems
UFC 3-580-01 (2016; Change 1, 2016) Telecommunications Interior Infrastructure Planning and Design
UFC 3-600-01 (2016; Change [*Am-4] 5 [**Am-4], 2020)
SECTION 01 86 26 Page 6Am #0009
Fire Protection Engineering for Facilities
UFC 4-010-01 (2018) DoD Minimum Antiterrorism Standards for Buildings
UFC 4-010-02 DoD Minimum Antiterrorism Standoff Distances for Buildings (FOUO)
UFC 4-010-05 (2013; Change 1, 2013) Sensitive Compartmented Information Facilities Planning, Design, and Construction
UFC 4-010-06 (2016; Change 1, 2017) Cybersecurity of Facility-Related Control Systems
U.S. DEFENSE INTELLIGENCE AGENCY (DIA)
ICD 705 Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities
ICS 705-1 Physical and Technical Security Standards for Sensitive Compartmented Information Facilities
ICS 705-2 Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information Facilities
ICD/ICS 705 Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities
ELECTRONIC INDUSTRIES ALLIANCE (EIA)
TIA J-STD-607-A Commercial Building Grounding (Earthing) and Bonding Requirements for Telecomminucations (ANSI-J-STD-607-A)
ILLUMINATING ENGINEERING SOCIETY (IES)
IES HB-10 (2011; Errata 2015) IES Lighting Handbook
IES LM-79-08 Electrical and Photometric Measurements of Solid-State Lighting Products
IES LM-80-15 Measuring Luminous Flux and Color Maintenance of LED Packages, Arrays and Modules
TM-21-11 Projecting Long Term Lumen Maintenance of LED Light Sources
TM-21-11 ADD B Projecting Long Term Lumen Maintenance of LED Light Sources Addendum B
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 81 Guide for Measuring Earth Resistivity, SECTION 01 86 26 Page 7Am #0009
Ground Impedance, and Earth Surface Potentials of a Ground System
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
IEEE 142 Recommended Practice for Grounding of Industrial and Commercial Power Systems - IEEE Green Book
IEEE 241 Recommended Practice for Electric Power Systems in Commercial Buildings - IEEE Gray Book
IEEE 242 Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems - Buff Book
IEEE 259 Standard Test Procedure for Evaluation of Systems of Insulation for Dry-Type Specialty and General-Purpose Transformers
IEEE 386 Separable Insulated Connector Systems for Power Distribution Systems Rated 2.5 kV through 35 kV
IEEE 399 Brown Book IEEE Recommended Practice for Power Systems Analysis
IEEE 400.2 Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency
(VLF)
IEEE 446 Orange Book IEEE Recommended Practice for Emergency and Standby Power Systems for Industrial and Commercial Applications
IEEE 519 Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems
IEEE 551 Recommended Practice for Calculating Short- Circuit Currents in Industrial and Commercial Power Systems - IEEE Violet Book
IEEE 576 Recommended Practice for Installation, Termination, and Testing of Insulated Power Cable as Used in Industrial and Commercial Applications
IEEE 848 Standard Procedure for the Determination of the Ampacity Derating Factor for Fire-Protected Cable Systems
IEEE 1100 Recommended Practice for Powering and Grounding Electronic Equipment - IEEE Emerald Book
IEEE 1159 Recommended Practice on Monitoring
SECTION 01 86 26 Page 8Am #0009
Electric Power Quality
IEEE 1184 Guide for Batteries for Uninterruptible Power Supply Systems
IEEE 1215 Guide for the Application of Separable Insulated Connectors
IEEE 1375 Guide for the Protection of Stationary Battery Systems
IEEE 1584 IEEE Guide for Performing Arc-Flash Hazard Calculations (with amendments and changes)
IEEE 1584.1 Guide for the Spedification of Scope and Deliverable Requirements for an Arc-Flash Hazard Calculation Study in Accordance with IEEE Std 1584
IEEE 1635 Guide for the Ventilation and Thermal Management of Batteries for Stationary Applications
IEEE C2 National Electrical Safety Code
IEEE C37.20.2 Metal-Clad Switchgear
IEEE C37.46 Standard for High Voltage Expulsion and Current-Limiting Type Power Class Fuses and Fuse Disconnecting Switches
IEEE C37.96 Guide for AC Motor Protection
IEEE C57.12.00 Standard General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers
IEEE C57.12.10 Liquid-Immersed Power Transformers Corrigendum 2: Correction of A.3.2.13 Autotransformer LTC Application Considerations
IEEE C57.12.26 IEEE Standard for Pad-mounted, Compartmental-Type, Self-cooled, Three phase Distribution Transformers for Use with Separable Insulated High-voltage Connectors (34 500 Grd Y/19 920 V and Below, 2500 kVA and Smaller
IEEE C57.12.28 Standard for Pad-Mounted Equipment - Enclosure Integrity
IEEE C57.12.70 Standard Terminal Markings and Connections for Distribution and Power Transformers
IEEE C57.12.80 Standard Terminology for Power and Distribution Transformers
IEEE C57.96 Guide for Loading Dry-Type Distribution
SECTION 01 86 26 Page 9Am #0009 and Power Transformers
IEEE C62.41 Recommended Practice on Surge Voltages in Low-Voltage AC Power Circuits
IEEE C62.41.1 Guide on the Surges Environment in Low-Voltage (1000 V and Less) AC Power Circuits
IEEE C62.41.2 Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits
IEEE C62.45 Recommended Practice on Surge Testing for Equipment Connected to Low-Voltage (1000v and less) AC Power Circuits
IEEE Stds Dictionary IEEE Standards Dictionary: Glossary of Terms & Definitions
INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
ICEA S-94-649 Standard for Concentric Neutral Cables Rated 5 Through 46 KV
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2018) International Building Code
NACE INTERNATIONAL (NACE)
NACE SP0169 Control of External Corrosion on Underground or Submerged Metallic Piping Systems
NACE SP0177 Mitigation of Alternating Current and Lightning Effects on Metallic Structures and Corrosion Control Systems
NACE SP0185 Extruded Polyolefin Resin Coating Systems with Soft Adhesives for Underground or Submerged Pipe
NACE SP0188 Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
36 CFR 1191 Architectural Barriers Act (ABA) Accessibility Guidelines
ABA Accessibility Guidelines for Buildings and Facilities
NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)
NECA 90 Recommended Practice for Commissioning Building Electrical Systems (ANSI)
SECTION 01 86 26 Page 10Am #0009
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2018; ERTA 1-2 2018) Standard for Portable Fire Extinguishers
NFPA 37 Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
NFPA 70B Recommended Practice for Electrical Equipment Maintenance
NFPA 70E Standard for Electrical Safety in the Workplace
NFPA 77 Recommended Practice on Static Electricity
NFPA 101 (2018) Life Safety Code
NFPA 110 (2016) Standard for Emergency and Standby Power Systems
NFPA 780 Standard for the Installation of Lightning Protection Systems
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI C12.1 Electric Meters Code for Electricity Metering
ANSI C80.1 American National Standard for Electrical Rigid Steel Conduit (ERSC)
ANSI C80.3 American National Standard for Electrical Metallic Tubing (EMT)
ANSI C136.2 American National Standard for Roadway and Area Lighting Equipment: Luminaires Voltage Classification
ANSI C136.3 American National Standard for Roadway and Area Lighting Equipment Luminaire Attachments
ANSI C136.10 American National Standard for Roadway and Area Lighting Equipment-Locking-Type Photocontrol Devices and Mating Receptacles--Physical and Electrical
SECTION 01 86 26 Page 11Am #0009
Interchangeability and Testing
ANSI C136.21 American National Standard for Roadway and Area Lighting Equipment - Vertical Tenons Used with Post-Top-Mounted Luminaires
ANSI Z535.1 American National Standard for Safety--Color Code
ANSI/NEMA OS 1 Sheet-Steel Outlet Boxes, Device Boxes, Covers, and Box Supports
ANSI/NEMA OS 2 Nonmetallic Outlet Boxes, Device Boxes, Covers, and Box Supports
ANSI/NEMA WC 66 Performance Standard for Category 6 and Category 7 100 Ohm Shielded and Unshielded Twisted Pairs
ANSI/NEMA WC 71/ICEA S-96-659 Standard for Nonshielded Cables Rated 2001-5000 Volts for use in the Distribution of Electric Energy
NEMA 250 Enclosures for Electrical Equipment (1000 Volts Maximum)
NEMA AB 1 Molded-Case Circuit Breakers, Molded Case Switches, and Circuit-Breaker Enclosures
NEMA AB 3 Molded Case Circuit Breakers and Their Application
NEMA ANSLG C78.377 American National Standard for Electric Lamps— Specifications for the Chromaticity of Solid State Lighting Products
NEMA C12.1 Code for Electricity Metering
NEMA C37.50 American National Standard for Switchgear--Low-Voltage AC Power Circuit Breakers Used in Enclosures - Test Procedures
NEMA C82.77 Harmonic Emission Limits - Related Power Quality Requirements for Lighting Equipment
NEMA FB 1 Standard for Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit, Electrical Metallic Tubing, and Cable
NEMA ICS 2 Standard for Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 4 Terminal Blocks
NEMA ICS 5 Control Circuit and Pilot Devices
NEMA ICS 6 Enclosures
SECTION 01 86 26 Page 12Am #0009
NEMA ICS 7 Adjustable-Speed Drives
NEMA KS 1 Enclosed and Miscellaneous Distribution Equipment Switches (600 V Maximum)
NEMA LA 1 Standard for Surge Arresters
NEMA MG 1 Motors and Generators
NEMA MG 2 Safety Standard for Construction and Guide for Selection, Installation and Use of Electric Motors and Generators
NEMA MG 3 Sound Level Prediction for Installed Rotating Electrical Machines
NEMA MG 10 Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction Motors
NEMA MG 11 Energy Management Guide for Selection and Use of Single Phase Motors
NEMA PB 1 Panelboards
NEMA PB 2 Deadfront Distribution Switchboards
NEMA PE 1 Uninterruptible Power Systems (UPS) Specification and Performance Verification
NEMA PE 5 Utility-Type Battery Chargers
NEMA RN 1 Polyvinyl-Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and Intermediate Metal Conduit
NEMA SSL 1 Electronic Drivers for LED Devices, Arrays, or Systems
NEMA SSL 3 High-Power White LED Binning for General Illumination
NEMA ST 20 Standard for Dry-Type Transformers for General Applications
NEMA TC 2 Standard for Electrical Polyvinyl Chloride (PVC) Conduit
NEMA TC 3 Standard for Polyvinyl Chloride (PVC) Fittings for Use With Rigid PVC Conduit and Tubing
NEMA TC 6 & 8 Standard for Polyvinyl Chloride (PVC) Plastic Utilities Duct for Underground Installations
NEMA TC 7 Standard for Smooth-Wall Coilable Electrical Polyethylene Conduit
SECTION 01 86 26 Page 13Am #0009
NEMA TC 9 Standard for Fittings for Polyvinyl Chloride (PVC) Plastic Utilities Duct for Underground Installation
NEMA TP 1 Guide for Determining Energy Efficiency for Distribution Transformers
NEMA TR 1 Transformers, Regulators, and Reactors
NEMA VE 1 Standard for Metal Cable Tray Systems
NEMA VE 2 Cable Tray Installation Guidelines
NEMA WC 7
Cross-Linked-Thermosetting-Polyethylene-Insulated Wire and Cable for the Transmission and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .