This solicitation requests construction services for a Special Operations Command - North Theater Operational Support Facility located at Peterson Air Force Base in Colorado. The U.S. Army Corps of Engineers Engineering District Omaha seeks to award a firm fixed-price construction contract for work including site preparation, utilities infrastructure, building construction, and associated support facilities. The anticipated period of performance is 730 calendar days from notice to proceed. The solicitation is unrestricted and responses are due by February 18, 2020.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 0004 W9128F

SOCNORTH THEATER OPERATIONAL SUPPORT FACILITY, PN TDKA 143002 (FY20), PETERSON AFB, COLORADO

See attached documentation for content of the amendment revisions to solicitation

Date for receipt of proposals is 02 DEC 2020 at 1400 hours

Government Point of Contact: Bill Rawe, Contract Specialist, William.T.Rawe@usace.army.mil

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919

See Item 6

W9128F-20-R-0085

11/05/2020

10/06/2020

11/05/2020

Am #0004 - 1

Am #0004 - 2 (Continuation SF 30)

5 November 2020 Solicitation No. W9128F 20 R 0085

Date of Issue: 6 OCT 2020 Date of Receiving Proposals: 2 DEC 2020

SUBJECT: Amendment No. 0004 to Request for Proposal Solicitation Package for Construction of SOCNORTH THEATER OPERATIONAL SUPPORT FACILITY.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Section 01 30 00.24, Page 13, paragraph 1.16 “AVAILABILITY OF UTILITY SERVICES”, delete the first sentence “All reasonably required...outlets and supplies.” and substitute the following:

“All reasonably required amounts of domestic water, gas, and electricity will be made available to the Contractor by the Government from existing system outlets and supplies.”

(2) Section 01 30 00.24, Page 13, paragraph 1.16 “AVAILABILITY OF UTILITY SERVICES”, delete the last sentence “Normal quantities of...by the Government.” and substitute the following:

“Normal quantities of electricity, gas, and water used to make final tests of completely installed systems will be furnished by the Government.”

(3) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number CO20200002 in its entirety and substitute General Wage Rate Decision Number CO20200002 dated 10/30/2020. General Wage Rate Decision Number CO20200002 dated 10/30/2020 is included as an attachment to this Amendment.

(4) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number CO20200022 in its entirety and substitute General Wage Rate Decision Number CO20200022 dated 10/30/2020. General Wage Rate Decision Number CO20200022 dated 10/30/2020 is included as an attachment to this Amendment.

(5) Section 01 86 10, Page 17, paragraph 1.7.3.6 “Minimum Ventilation Requirements”, delete the description and requirements for “Mech, Main Elec Rooms & Storage Rooms” and substitute the following:

“Mech, Main Elec Rooms Ventilate per UFC 3-410-01

Paragraph 4-2.4.6 D408.3”

(6) Section 01 91 00.15 10, Page 3, paragraph 1.2 “SYSTEMS TO BE COMMISSIONED”, at the beginning of the list add the following:

“Building Envelope System Building Envelope Systems”

Am #0004 - 3

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added 01 81 00 01 81 00 01 82 00 01 82 00 01 84 00 01 84 00 01 86 13 01 86 13 01 86 26 01 86 26 01 86 29 01 86 29 01 89 00 01 89 00 Appendix C – Furniture, Fixtures Appendix C – Furniture, Fixtures & Equipment & Equipment

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.

1. SHEET G-301, FIRST FLOOR SECURITY REQUIREMENTS PLAN

2. SHEET G-302, SECOND FLOOR SECURITY REQUIREMENTS PLAN

3. SHEET C1.01, SOCNORTH SITE LAYOUT PLAN

4. SHEET L1.01, SOCNORTH LANDSCAPE PLAN

5. SHEET A-101, COMPOSITE FIRST FLOOR PLAN

6. SHEET A-101A, FIRST FLOOR PLAN – AREA A

7. SHEET A-101B, FIRST FLOOR PLAN – AREA B

8. SHEET A-601, FIRST FLOOR ROOM FINISH SCHEDULE

9. SHEET A-602, SECOND FLOOR ROOM FINISH SCHEDULE

10. SHEET P-101A, FIRST FLOOR PLUMBING PLAN - AREA A

11. SHEET ES101, ELECTRICAL SITE PLAN

12. SHEET E-203, SECOND FLOOR POWER PLAN - AREA A

13. SHEET E-204, SECOND FLOOR POWER PLAN - AREA B

14. SHEET E-205, MECHANICAL EQUIPMENT YARD POWER PLAN

15. SHEET E-602, PARTIAL SECONDARY ELECTRICAL ONE-LINE DIAGRAM

16. SHEET TS101, TELECOM SITE PLAN

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.

4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 02 DEC 2020.

Am #0004 - 4

Attachments:

General Wage Rate Decisions CO20200002 dated 10/30/2020 CO20200022 dated 10/30/2020 Specifications listed in 1.b., above Drawings listed in 1.c., above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

5 NOV 2020

nep/2160

Am #0004 CO20200002 - 1 10/30/2020

General Decision Number: CO20200002 10/30/2020

Superseded General Decision Number: CO20190002

State: Colorado

Construction Type: Heavy

Counties: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld Counties in Colorado.

HEAVY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/31/2020 2 08/28/2020 3 10/30/2020

Am #0004 CO20200002 - 2 10/30/2020

ASBE0028-001 07/01/2019

Rates Fringes

Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 32.98 14.73

BRCO0007-004 01/01/2019

ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,

JEFFERSON AND WELD COUNTIES

BRICKLAYER.......................$ 29.52 10.48

BRCO0007-006 05/01/2018

EL PASO AND PUEBLO COUNTIES

Rates Fringes

BRICKLAYER.......................$ 25.88 10.34

ELEC0012-004 06/01/2019

PUEBLO COUNTY

Rates Fringes

ELECTRICIAN

Electrical contract over $1,000,000..................$ 27.50 12.50+3% Electrical contract under $1,000,000..................$ 24.85 12.50+3%

* ELEC0068-001 06/01/2020

JEFFERSON, LARIMER, AND WELD COUNTIES

ELECTRICIAN......................$ 38.00 16.97

* ELEC0111-001 09/01/2020

Am #0004 CO20200002 - 3 10/30/2020

Line Construction:

Groundman...................$ 22.04 24.25%+6.80 Line Equipment Operator.....$ 35.61 24.25%+6.80 Lineman and Welder..........$ 49.45 24.25%+6.80

* ELEC0113-002 06/01/2020

EL PASO COUNTY

Rates Fringes

ELECTRICIAN......................$ 33.25 3%+15.75

ELEC0969-002 06/01/2019

MESA COUNTY

Rates Fringes

ELECTRICIAN......................$ 25.20 10.06

ENGI0009-001 05/01/2020

Rates Fringes

Power equipment operators:

Blade: Finish...............$ 30.37 11.15 Blade: Rough................$ 30.37 11.15 Bulldozer...................$ 30.37 11.15 Cranes: 50 tons and under..$ 30.20 11.15 Cranes: 51 to 90 tons......$ 30.47 11.15 Cranes: 91 to 140 tons.....$ 31.55 11.15 Cranes: 141 tons and over...$ 33.67 11.15 Forklift....................$ 29.67 11.15 Mechanic....................$ 30.53 11.15 Oiler.......................$ 29.29 11.15 Scraper: Single bowl under 40 cubic yards........$ 30.20 11.15 Scraper: Single bowl, including pups 40 cubic yards and over and tandem bowls.......................$ 30.37 11.15 Trackhoe....................$ 30.20 11.15

IRON0024-003 11/01/2019

Rates Fringes

Ironworkers:.....................$ 30.85 22.26 Structural

LABO0086-001 05/01/2009

Am #0004 CO20200002 - 4 10/30/2020

Laborers:

Pipelayer...................$ 18.68 6.78

PLUM0003-005 06/01/2017

JEFFERSON, LARIMER AND WELD COUNTIES

PLUMBER..........................$ 39.08 16.44

PLUM0058-002 07/01/2018

EL PASO COUNTY

Rates Fringes

Plumbers and Pipefitters.........$ 32.75 14.85

PLUM0058-008 07/01/2018

PUEBLO COUNTY

Rates Fringes

Plumbers and Pipefitters.........$ 32.75 14.85

PLUM0145-002 07/01/2016

MESA COUNTY

Rates Fringes

Plumbers and Pipefitters.........$ 35.17 11.70

PLUM0208-004 06/01/2016

JEFFERSON, LARIMER AND WELD COUNTIES

PIPEFITTER.......................$ 37.10 16.62

SHEE0009-002 07/01/2019

Am #0004 CO20200002 - 5 10/30/2020

Sheet metal worker...............$ 34.62 17.95

* TEAM0455-002 07/01/2020

Rates Fringes

Truck drivers:

Pickup......................$ 22.66 4.42 Tandem/Semi and Water.......$ 23.29 4.42

SUCO2001-006 12/20/2001

Rates Fringes

BOILERMAKER......................$ 17.60

Carpenters:

Form Building and Setting...$ 16.97 2.74 All Other Work..............$ 15.14 3.37

Cement Mason/Concrete Finisher...$ 17.31 2.85

IRONWORKER, REINFORCING..........$ 18.83 3.90

Laborers:

Common......................$ 11.22 2.92 Flagger.....................$ 8.91 3.80 Landscape...................$ 12.56 3.21

Painters:

Brush, Roller & Spray.......$ 15.81 3.26

Power equipment operators:

Backhoe.....................$ 16.36 2.48 Front End Loader............$ 17.24 3.23 Skid Loader.................$ 15.37 4.41

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other

Am #0004 CO20200002 - 6 10/30/2020 health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates

Am #0004 CO20200002 - 7 10/30/2020 the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Am #0004 CO20200002 - 8 10/30/2020

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Am #0004 CO20200022 - 1 10/30/2020

General Decision Number: CO20200022 10/30/2020

Superseded General Decision Number: CO20190022

State: Colorado

Construction Type: Building

County: El Paso County in Colorado.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/10/2020 2 01/24/2020 3 08/28/2020 4 10/30/2020

Am #0004 CO20200022 - 2 10/30/2020

ASBE0028-002 07/01/2019

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 32.98 14.73

* ELEC0113-005 06/01/2020

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring)..................$ 33.25 3%+15.75

ELEV0025-001 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 46.53 35.245

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0009-017 05/01/2018

Rates Fringes

POWER EQUIPMENT OPERATOR

(Crane) 141 tons and over...........$ 31.07 10.70 50 tons and under...........$ 28.40 10.70 51 to 90 tons...............$ 28.57 10.70 91 to 140 tons..............$ 29.55 10.70

IRON0024-009 11/01/2019

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 30.85 11.92

IRON0024-011 11/01/2019

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 30.85 11.92

Am #0004 CO20200022 - 3 10/30/2020

PAIN0079-009 08/01/2017

PAINTER (Spray)..................$ 20.50 8.41

PLAS0577-002 05/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 29.00 12.95

* PLUM0058-003 07/01/2020

Rates Fringes

PLUMBER (Excludes HVAC Duct, Pipe and Unit Installation)......$ 34.85 15.77

* PLUM0058-004 07/01/2020

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation (Excludes HVAC Duct and Unit Installation)....................$ 34.85 15.77

* SFCO0669-002 04/01/2020

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 38.23 24.78

SHEE0009-005 07/01/2019

Rates Fringes

SHEET METAL WORKER (Excludes HVAC Duct, Pipe and Unit Installation)....................$ 34.62 17.95

SUCO2013-008 07/31/2015

Rates Fringes

BRICKLAYER.......................$ 21.96 0.00

CARPENTER........................$ 22.63 6.98

LABORER: Common or General......$ 13.40 1.40

LABORER: Mason Tender - Brick...$ 15.99 0.00

Am #0004 CO20200022 - 4 10/30/2020

LABORER: Mason Tender - Cement/Concrete..................$ 16.00 0.00

LABORER: Pipelayer..............$ 16.96 3.68

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 20.26 8.62

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.58 2.42

OPERATOR: Grader/Blade..........$ 21.50 0.00

PAINTER (Brush and Roller).......$ 17.20 0.00

ROOFER...........................$ 16.71 0.00

SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 25.18 6.30

SHEET METAL WORKER (HVAC Unit Installation Only)...............$ 24.00 2.18

TRUCK DRIVER: Dump Truck........$ 17.34 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

Am #0004 CO20200022 - 5 10/30/2020

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Am #0004 CO20200022 - 6 10/30/2020

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Am #0004 CO20200022 - 7 10/30/2020

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

This page was intentionally left blank for duplex printing.

SOCNORTH Theater Operational Support Facility - Peterson AFB PE83

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 81 00

SUMMARY OF THE WORK

05/18

PART 1 GENERAL

1.1 REFERENCES

1.2 DESIGN AND CONSTRUCTION OBJECTIVES

1.2.1 Building Durability

1.2.2 Site Constraints

1.2.2.1 Critical Fiber Communications Standoff Distance

1.2.2.2 Site Access and Work Restrictions

1.3 PROJECT DESCRIPTION

1.4 PROJECT SITE

1.5 DESIGN AND CONSTRUCTION OBJECTIVES

1.5.1 Site and Infrastructure Functions

1.5.2 Facility Functions

1.6 PROJECT SCOPE

1.6.1 Existing Conditions

1.6.2 Demolition

1.6.3 New Work

1.7 DESIGN AND CONSTRUCTION REQUIREMENTS

1.7.1 Changes to RFP Criteria Requirements

1.7.2 Codes and Criteria

1.7.3 Secure Areas

1.7.3.1 Future Special Access Program (SAP) Spaces

1.7.4 Open-Storage Areas

1.7.5 Shelter-in-Place Provisions

1.7.6 Changes to RFP Criteria Requirements

1.7.7 Phasing of Work, Security, and Construction Staging

1.7.8 Sustainability

1.7.8.1 Criteria

1.7.8.2 Life-Cycle Cost Analysis (LCCA)

1.7.8.2.1 LCCA Format

1.7.8.2.2 LCCA Building-Level Analysis

1.7.8.2.3 LCCA Individual Component or System Alternatives

Analysis

1.7.8.3 Energy Consumption Reduction Requirement

1.7.8.4 Energy Compliance Analysis (ECA)

1.7.8.4.1 ECA Narrative Requirements

1.7.8.5 Total Building Commissioning

1.7.9 Cybersecurity

1.7.10 Bridging Documents

1.7.11 Design and Construction Measurement Units

1.7.12 Personnel Qualifications and Experience

1.7.13 Design and Construction Deliverables

1.7.14 Advanced Modeling and Facility Data Requirements

1.7.15 Operations and Maintenance Requirements

1.8 OVERVIEW OF DESIGN-BUILD PROCESS

1.8.1 Overview

SECTION 01 81 00 Page 1Am #0004

1.8.2 Process

1.9 DESIGN-BUILD CONTRACTOR REQUIRED A/E SERVICES

1.9.1 Dimensions

1.9.2 Professional Registrations, Licenses and/or Certifications

1.9.3 Request For Proposal - Binding Information

1.9.4 Evaluation of Systems

1.9.5 Documents Requirements

1.10 COMMON DEFICIENCIES

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 81 00 Page 2Am #0004

SECTION 01 81 00

SUMMARY OF THE WORK

05/18

PART 1 GENERAL

1.1 REFERENCES

The design publications listed below shall be used as sources of criteria for the design. The most current edition of the code or standard (with errata and addenda) available at the RFP proposal submission deadline shall be used as criteria for the design - unless noted otherwise. The criteria from these sources may be supplemented, but not supplanted, by applicable criteria contained in nationally recognized codes and standards.

U.S. DEPARTMENT OF DEFENSE (DOD)

DOD 8510.01 (2014; Change 1-2016; Change 2-2017) Risk Management Framework (RMF) for DoD Information Technology (IT)

DODI 8500.01 (2014) Cybersecurity

UFC 1-200-01 (2019) DoD Building Code (General Building Requirements)

UFC 1-200-02 (2016; Change 4, 2019) High Performance and Sustainable Building Requirements

UFC 3-101-01 (2011; Change 5, 2019) Architecture

UFC 3-600-01 (2016; Change [*Am-4] 5 [**Am-4], 2020) Fire Protection Engineering for Facilities

UFC 4-010-06 (2016; Change 1, 2017) Cybersecurity of Facility-Related Control Systems

UFC 4-021-01 (2008; with Change 1, 2010) Design and O&M: Mass Notification Systems

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)

NIST SP 800-82 NIST Special Publication: Guide to Industrial Control Systems (ICS) Security

1.2 DESIGN AND CONSTRUCTION OBJECTIVES

The design and construction of the SOCNORTH facility under this Contract shall comply with specifications and requirements contained in this Request for Proposal (RFP). Requirements emphasize low maintenance exterior and interior finishes as well as high energy efficiency. This project shall be designed and constructed to achieve federal guiding principles compliance via completion of the Air Force MILCON Sustainability Requirements Scoresheet. See 01 33 29 SUSTAINABILITY REPORTING for additional information.

SECTION 01 81 00 Page 3Am #0004

[*Am-4] 5 [**Am-4], The floor plans and elevations provided in this RFP are conceptual and establish the general requirements for square foot area, functional arrangement of rooms and spaces, exterior treatments and the overall unit configuration. During the design stages, the contractor shall make necessary adjustments to ensure constructability and compliance with the RFP criteria and requirements. The plans and elevations do not indicate all necessary construction requirements or components; the RFP describes associated technical, performance and system requirements. Design and construction shall be in accordance with all applicable industry and Air Force criteria, and the requirements of this RFP.

Design Quality Objective: The project objective is to obtain facilities to accommodate a maximum of 8,385 SM (90,255 SF) of accredited secure and open-storage administrative and training space with complementary site development within the funds available. Design quality is achieved through the integration of the facility to the site, balancing architecture features, managing design and construction security requirements, functionality and design for low-cost maintenance and operation. The Government desires to construct facilities of such quality that the foundations, foundation walls, footings, slabs and other foundation components last for a life of 50 years without structural damage, due to expansive soils or other geologic conditions, to the foundation or structures that the foundation supports.

It is desired that all equipment and products be easy to service, maintain, repair, and replace. All products or equipment shall follow industry standards. In extenuating circumstances, the use of special designed or manufactured items may be allowed, but they shall be submitted to the government for review and written approval prior to production, order or manufacture.

Scope of Work:

The proposal documents shall include adequate information to enable the Government to adequately evaluate the proposal for understanding and compliance with the entire scope of work. See Section 00 22 00 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD for complete requirements.

Project architectural features included but are not limited to [*Am-3] <text deleted> [**Am-3]stud backup wall construction, insulation, doors, windows/curtainwall, building hardware, gypsum wallboard, paint, wall coverings, cabinets, carpets, tile, acoustical ceiling tile, toilets, lavatories and accessories. Mechanical work includes but is not limited to construction of complete HVAC system(s) for the new facility, boilers and chillers, HVAC equipment and all associated controls, plumbing, EMCS/DDC and fire protection systems, lightning protection systems, complete cathodic protection system utilizing sacrificial anodes. Interior electrical includes panel boards, lighting fixtures, and general building power requirements. Communications work includes but is not limited to fiber optic and voice/data cabling including pre-wiring keyless access, CATV, security systems infrastructure, mass notification system and paging system. Anti-terrorism and force protection design and construction will be applied on this project.

1.2.1 Building Durability

Materials and equipment will be chosen for their durability and minimum

SECTION 01 81 00 Page 4Am #0004 maintenance. The building design shall conserve natural and manmade materials.

1.2.2 Site Constraints

See the bridging documents for the proposed project site(s). The site is highly constrained by a variety of factors. The contractor shall ensure the facility is designed and constructed in compliance with all site constraints including but not limited to the following:

1.2.2.1 Critical Fiber Communications Standoff Distance

A fiber communications concrete-encased duct which bisects the site shall remain undisturbed in its entirety. See the provided survey for the approximate location. Installation of foundations and utilities along the duct shall be located no closer than 5'-0" from the horizontal edge of the concrete encasement. Installation of grade beams (or other appropriate foundation feature) and utilities crossing the duct shall be located no closer than 1'-6" in any direction of the concrete encasement. Protective measures shall be taken during grading and construction activities to prevent disturbance to this concrete-encased duct.

1.2.2.2 Site Access and Work Restrictions

The various components of work fall under different levels of protection and oversight. Close coordination with the Government will be required during all phases of design and construction. See 01 14 00 WORK RESTRICTIONS and the bridging documents for requirements and restrictions related to various components of work.

1.3 PROJECT DESCRIPTION

The purpose of this project is to design and construct a new SOCNORTH Headquarters building that will serve as an administrative headquarters and command and control center. Major features include administrative office space, storage and secure areas. The secure areas provide space for Joint Operations Command (JOC), Special Technical Operations (STO), and administration space for J2, J3, and J5. Administrative functions include the Command Headquarters, J0, J1, J4, J6, and J8 staff. SOCNORTH has considerable storage requirements as various groups need to be prepared for rapid deployment.

The new SOCNORTH facility is a two-story building. Certain functions such as major storage, and mechanical, fire riser, and primary electrical service rooms will be located on the first floor as they require visitor access, vehicular access, loading/unloading of materials, and/or access by base maintenance personnel. A lobby is adjacent to the main entry and will include space for reception with a waiting area in order to process security badges and facilitate access to the rest of the building through controlled access.

Project architectural features include but are not limited to construction of steel stud and masonry walls, concrete slabs, insulation, doors, windows/storefronts/curtainwall, building hardware, gypsum wallboard, paint, wall coverings, cabinets, carpets, tile, acoustical ceiling tile, toilets, lavatories and accessories.

Mechanical features include but are not limited to new HVAC system(s), utility service connections, HVAC equipment and all associated controls, SECTION 01 81 00 Page 5Am #0004 plumbing, EMCS/DDC and fire protection/sprinkler systems. For additional information regarding mechanical requirements see Specification Section 01

86 10 MECHANICAL REQUIREMENTS.

Interior electrical includes panel boards, lighting fixtures, and general building power requirements. Communications work includes but is not limited to fiber optic and voice/data cabling, including pre-wiring keyless access, CCTV, CATV, and security systems infrastructure. (For additional information regarding electrical requirements see Specification Section 01 86 26 ELECTRICAL REQUIREMENTS.)

A fire alarm and mass notification system shall be installed throughout the facility in accordance with UFC 3-600-01 and UFC 4-021-01. A fire sprinkler system shall be installed throughout the facility in accordance with UFC 3-600-01.

See all discipline requirements sections of this RFP, combined with the bridging documents for the full technical scope of work relating to this project.

1.4 PROJECT SITE

The project is located at Peterson AFB, Colorado, within the Command Character area on the installation. Vicinity and location maps are included in the bridging documents provided with this RFP.

1.5 DESIGN AND CONSTRUCTION OBJECTIVES

The primary purpose of this project is to create interior spaces tailored to occupying unit operational needs, with a facility functional life of 50 years. See the bridging documents for floor plans, as well as space-by-space requirements for the new facility.

Among the features of work are the following. See individual discipline requirements specifications for additional requirements:

a. Design and installation of an air barrier system for the building to meet UFC 3-101-01 and the standards set forth in it.

b. Entire work complete for Procurement and Installation of Generator Set and Switchgear, associated controls and monitoring, and connections to fuel system.

c. Entire work complete for construction of communications lines and ductbank from the SOCNORTH facility to Building 1038.

d. Entire work complete for cybersecurity documentation and alterations to commercial equipment, devices, firmware, and software to satisfy cybersecurity requirements.

e. (Bid Option) Procurement and installation of furniture, furnishings, and equipment (FF&E).

f. (Bid Option) Procurement and installation of Intrusion Detection System (IDS) and Electronic Security Systems (ESS) to include facility Access Control System (ACS).

g. (Bid Option) Procurement and installation of CCTV system equipment and devices.

SECTION 01 81 00 Page 6Am #0004

h. (Bid Option) Procurement and installation of audio-visual (A/V) system equipment and devices.

i. (Bid Option) Entire work complete for procurement and installation of uninterruptable power system (UPS) equipment and devices.

j. (Bid Option) Entire work complete to provide access control and secure area oversight as defined in 01 14 00 Work Restrictions and associated references.

k. (Bid Option) Entire work complete to construct south parking lot including associated landscape and lighting.

l. (Bid Option) Additional cost complete to construct parking using permeable pavers in lieu of asphalt pavement.

See 00 10 00 SF 1442 AND CONTRACT LINE ITEM PRICING SCHEDULE for a bid schedule including basic bid items as well as bid options.

1.5.1 Site and Infrastructure Functions

Significant site work is required by this project, including building earthwork, parking lots, drives, sidewalks and landscaping, as indicated in the briding documents. Coordinate laydown and staging areas with the Government after contract award; tenative staging areas are indicated in the bridging documents.

1.5.2 Facility Functions

The facility is intended to serve multiple SOCNORTH companies, yielding a requirement for a somewhat compartmentalized floor plan, as indicated in the briding documents. Building systems, door hardware, access control systems, and other building components shall be configured in a manner that preserves that compartmentalization. See the bridging documents for primary points of entry for each of those compartments. Those systems shall be configured to allowed shared access of spaces and resources when the units desire to do so.

The facility shall accomodate personnel at workstations and personnel's equipment storage lockers as shown on the bridging documents.

1.6 PROJECT SCOPE

This project requires design and construction of the new SOCNORTH facility as described within this RFP.

The design shall include all work for the new SOCNORTH facility, including bid options. See Section 01 33 00.32 DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES for additional requirements.

1.6.1 Existing Conditions

The existing site is an open site with no existing structures. The site is adjacent to the base perimeter in the northeast corner of Peterson AFB in the Command Character area.

SECTION 01 81 00 Page 7Am #0004

1.6.2 Demolition

Conduct all demolition necessary to meet all requirements as described in this RFP. See 02 41 00 DEMOLITION for additional requirements. Demolition shall include, but is not limited to the following:

a. Site materials at new SOCNORTH facility location.

1.6.3 New Work

Provide all work neccessary to construct the SOCNORTH facility in full compliance with the bridging documents, and all portions of this RFP -including but not limited to the following:

a. Provide walls, substrates, and finishes as indicated by the room finish schedule.

b. Provide a fire sprinkler system and sprinkler heads per accommodate floor plan layout per 01 86 13 FIRE PROTECTION REQUIREMENTS.

c. Provide fire alarm and mass notification per 01 86 13 FIRE

PROTECTION REQUIREMENTS.

d. Provide lighting (fixtures, switches, and wiring) per 01 86 26

ELECTRICAL REQUIREMENTS.

e. Provide ceilings where indicated in rooms per 01 82 00

ARCHITECTURAL REQUIREMENTS.

f. Provide communications infrastructure, equipment, and wiring per

01 86 26 ELECTRICAL REQUIREMENTS.

g. Provide building power, equipment, conduit, wiring, and receptacles per 01 86 26 ELECTRICAL REQUIREMENTS.

h. Provide HVAC equipment, diffusers, grilles, and associated ductwork per 01 86 10 MECHANICAL REQUIREMENTS.

i. Provide plumbing fixtures, supply lines, vent and waste lines per

01 86 10 MECHANICAL REQUIREMENTS.

j. Install an air barrier system on the exterior walls per 01 82 00

ARCHITECTURAL REQUIREMENTS.

k. Provide interior and exterior doors, frames, and door hardware as indicated in the bridging documents and per 01 82 00 ARCHITECTURAL

REQUIREMENTS.

l. Provide storage lockers/cages where indicated in the bridging documents per 01 82 00 ARCHITECTURAL REQUIREMENTS.

m. Provide Intrusion Detection System (IDS), Electronic Security System (ESS) and facility Access Control System (ACS) infrastructure, conduit, and wiring for new IDS and ESS systems (infrastructure/wiring in base bid, IDS, ESS and ACS equipment and systems in bid option).

n. Provide closed-circuit television (CCTV) infrastructure, conduit and wiring for new CCTV system (infrastructure/wiring in base bid, CCTV equipment and system in bid option).

SECTION 01 81 00 Page 8Am #0004

o. Provide A/V system infrastructure, conduit, and wiring for A/V system (infrastructure/wiring in base bid, A/V equipment and system in bid option).

1.7 DESIGN AND CONSTRUCTION REQUIREMENTS

1.7.1 Changes to RFP Criteria Requirements

This Request for Proposal provides requirements expected of the Design-Build Contractor during the design and construction of this project.

The RFP bridging documents present an overall design concept of the project; provide useful project information; establish some definition of the systems to be used; and incorporate requirements expected by the Using Service.

It shall be the responsibility of the Design-Build Contractor to assemble the best-value-priced construction systems for this project that meet or exceed all provisions of the RFPand referenced criteria set forth herein.

Offerors should not consider changes to RFP criteria requirements during proposal preparation. After contract award, any changes to the RFP criteria requirements require approval by the Contracting Officer.

See Section 01 33 00.32 DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES for additional requirements.

1.7.2 Codes and Criteria

All pertinent building codes, life safety codes, and reference criteria shall be met or exceeded. This project utilizes the DoD Building Code, as defined by UFC 1-200-01 and its references.

If there is a conflict in requirements, order of precedence shall be as follows, in order of decreasing precedence:

a. Life Safety, as defined by DoD Building Code UFC 1-200-01 and its references;

b. RFP Specifications;

c. RFP Drawings;

d. Non-life safety criteria, as defined by DoD Building Code UFC 1-200-01 and its references;

e.…