About this file

This document contains an amendment to a federal solicitation for construction services. The solicitation is for the construction of a Special Operations Command - North Theater Operational Support Facility at Peterson Air Force Base in Colorado. The amendment provides instructions for obtaining CAD and BIM files related to the project and includes a disclaimer regarding their use. It also notes that there are no changes to the specifications or drawings and extends the deadline for proposal submissions to November 24, 2020 at 2:00 PM local time. Electronic submissions are to be provided according to the instructions in section 00 22 00 of the original solicitation. The U.S. Army Corps of Engineers Omaha District is the issuing agency.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 0001 W9128F

SOCNORTH THEATER OPERATIONAL SUPPORT FACILITY, PN TDKA 143002 (FY20), PETERSON AFB, COLORADO

See attached documentation for content of the amendment revisions to solicitation

Date for receipt of proposals is 24 NOV 2020 at 1400 hours

Government Point of Contact: Bill Rawe, Contract Specialist, William.T.Rawe@usace.army.mil

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919

See Item 6

W9128F-20-R-0085

10/13/2020

10/06/2020

10/13/2020

Am #0001 - 1

Am #0001 - 2 (Continuation SF 30)

13 October 2020 Solicitation No. W9128F 20 R 0085

Date of Issue: 6 OCT 2020 Date of Receiving Proposals: 24 NOV 2020

SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for Construction of SOCNORTH THEATER OPERATIONAL SUPPORT FACILITY.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly). NO CHANGES

See attachment for instructions on how to obtain CAD-BIM files and disclaimer on their use.

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.

4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 24 NOV 2020.

Attachments:

CAD-BIM Files Disclaimer (For Information Only)

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

13 OCT 2020

nep/2160

CAD/BIM files developed for the RFP can be obtained for use in preparation of proposals by contacting Bill Rawe, William.T.Rawe@usace.army.mil and Christine Wilson, Christine.L.Wilson@usace.army.mil. Request for CAD/BIM files must contain an email address; instructions for downloading a zip file containing the CAD/BIM files and set up instructions will be sent via DOD SAFE to the email address provided.

Disclaimer

The files contained herein were used to compile bridging documents for the subject RFP. The subject files are being provided for information only to prospective bidders. Files are provided in .dwg, format. Please note that the Government does not warrant consistency or accuracy of the files in relation to the electronic .PDF files that serve as the basis for bidding the work.

The files developed for the RFP were not developed or coordinated in compliance with the BIM development requirements listed in the RFP. Use of the concept drawings shall not limit compliance with BIM or As‐Built requirements in this contract. Utilization of these files shall not limit compliance with any portions or requirements of the RFP.

Standard_Form_30
Am-0001_W9128F-20-R-0085_Narrative
Attachments
CAD-BIM-Files_Disclaimer

File details come from the government source that posted it. Updated .