This solicitation is for the construction of a Special Operations Command - North (SOCNORTH), Theater Operational Support Facility at Peterson AFB, Colorado. The Department of the Army Corps of Engineers Engineering District Omaha seeks to award a firm fixed-price construction contract for the project. The solicitation is unrestricted and responses are due by the date specified on Federal Business Opportunities. Construction is to be completed within 540 calendar days after receiving notice to proceed.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0005 W9128F
SOCNORTH THEATER OPERATIONAL SUPPORT FACILITY, PN TDKA 143002 (FY20), PETERSON AFB, COLORADO
See attached documentation for content of the amendment revisions to solicitation
Date for receipt of proposals is 06 JAN 2021 at 1400 hours
Government Point of Contact: Bill Rawe, Contract Specialist, William.T.Rawe@usace.army.mil
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919
See Item 6
W9128F-20-R-0085
11/13/2020
10/06/2020
11/13/2020
Am #0005 - 1
Am #0005 - 2 (Continuation SF 30)
13 November 2020 Solicitation No. W9128F 20 R 0085
Date of Issue: 13 NOV 2020 New Date of Receiving Proposals: 06 JAN 2021
SUBJECT: Amendment No. 0005 to Request for Proposal Solicitation Package for Construction of SOCNORTH THEATER OPERATIONAL SUPPORT FACILITY.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Standard Form 1442 (SF1442), Page 00 10 00-1, item 13.A., delete the time and date for proposal receipt and substitute “1400” and “06 JAN 2021”.
(2) Section 00 21 00, Page 18, paragraph 1.20.1 “BIDDER INQUIRY”, delete the first sentence “Technical inquiries and questions...receipt of offers.” and substitute the following:
“Technical inquiries and questions relating to technical requirements, proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at: https://www.projnet.org/projnet/ No Later Than COB on 02 DEC 2020, in order that they may be given consideration or actions taken prior to receipt of offers.”
(3) Section 00 21 00, Page 19, paragraph 1.20.1 “BIDDER INQUIRY”, delete item c in its entirety and substitute the following:
“c. The Bidder Inquiry System will be unavailable for new inquires after COB on 02 DEC 2020 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.”
(4) Section 00 73 00, Page 2, paragraph 1.1 “(FAR 52.211-10)
COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)”,
delete the calendar days in the completion schedule for “Procure and install O&M funded Option Items” and substitute “840”.
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.
Pages or Sections Deleted Pages or Sections Substituted or Added
00 10 00 – CLIN 00 10 00 – CLIN
01 81 00 01 81 00 01 82 00 01 82 00 01 86 10 01 86 10 01 86 13 01 86 13 01 86 26 01 86 26 01 86 29 01 86 29
Am #0005 - 3
Pages or Sections Deleted Pages or Sections Substituted or Added ** 01 86 26AT – ODDG Chapter 12 Electrical 01 89 00 01 89 00 Appendix C – FF&E, pgs. 6 & 7 Appendix C – FF&E, pgs. 6 & 7 ** Appendix F – Antenna Cut Sheet
c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.
1. SHEET G-302, SECOND FLOOR SECURITY REQUIREMENTS PLAN
2. SHEET C1.01, SOCNORTH SITE LAYOUT PLAN
3. SHEET A-101B, FIRST FLOOR PLAN – AREA B
4. SHEET A-102A, SECOND FLOOR PLAN – AREA A
5. SHEET A-102B, SECOND FLOOR PLAN – AREA B
6. SHEET A-602, SECOND FLOOR ROOM FINISH SCHEDULE
7. SHEET A-603, FIRST FLOOR DOOR AND FRAME SCHEDULE
8. SHEET A-604, SECOND FLOOR DOOR AND FRAME SCHEDULE
9. SHEET I-101, COMPOSITE FIRST AND SECOND FLOOR FURNITURE PLANS
10. SHEET I-102A, SECOND FLOOR FURNITURE PLAN – AREA A
11. SHEET I-102B, SECOND FLOOR FURNITURE PLAN – AREA B
12. SHEET P-102A, SECOND FLOOR PLUMBING PLAN - AREA A
13. SHEET P-102B, SECOND FLOOR PLUMBING PLAN – AREA B
14. SHEET M-102A, SECOND FLOOR MECHANICAL PLAN – AREA A
15. SHEET M-102B, SECOND FLOOR MECHANICAL PLAN – AREA B
16. SHEET E-103, SECOND FLOOR LIGHTING PLAN - AREA A
17. SHEET E-104, SECOND FLOOR LIGHTING PLAN - AREA B
18. SHEET E-201, FIRST FLOOR POWER PLAN - AREA A
19. SHEET E-202, FIRST FLOOR POWER PLAN - AREA B
20. SHEET E-203, SECOND FLOOR POWER PLAN - AREA A
21. SHEET E-204, SECOND FLOOR POWER PLAN - AREA B
22. SHEET E-501, ELECTRICAL DETAILS
23. SHEET E-503, ELECTRICAL DETAILS
24. SHEET E-504, ELECTRICAL DETAILS
25. SHEET T-000, TELECOM SYMBOLS AND ABBREVIATIONS
26. SHEET T-101A, FIRST FLOOR PLAN - AREA A – TELECOM
27. SHEET T-101B, FIRST FLOOR PLAN - AREA B – TELECOM
28. SHEET T-102A, SECOND FLOOR PLAN - AREA A – TELECOM
29. SHEET T-102B, SECOND FLOOR PLAN - AREA B – TELECOM
30. SHEET AV-000, AUDIOVISUAL SYMBOLS AND ABBREVIATIONS
31. SHEET AV-101A, FIRST FLOOR PLAN - AREA A – AUDIOVISUAL
32. SHEET AV-102A, SECOND FLOOR PLAN - AREA A - AUDIOVISUAL
Am #0005 - 4
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.
4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 06 JAN 2021.
Attachments:
00 10 00 – SF1442 and CLIN Schedule Specifications listed in 1.b., above Drawings listed in 1.c., above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
13 NOV 2020
nep/2160
Am #0005 00 10 00 - 1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9128F-20-R-0085
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
6 OCT 2020
PAGES OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919
See Item 7
9. FOR INFORMATION
CALL:
A. NAME
Bill Rawe
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) Use Email: William.T.Rawe@usace.army.mil
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The offeror hereby agrees to do all work described in the documents entitled:
SOCNORTH THEATER OPERATIONAL SUPPORT FACILITY, PN TDKA 143002 (FY20)
PETERSON AFB, COLORADO
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00. ELECTRONIC COPIES OF
OFFER ARE ACCEPTABLE.
THIS SOLICITATION IS UNRESTRICTED AND IS OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION
11. The Contractor shall begin performance within 10 calendar days and complete it within ** calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. **See CLIN Schedule
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 06 JAN 2021. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than ___90_____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)
Prescribed by GSA FAR(48 CFR) 53.236-1(d)
Am #0005 00 10 00 - 2
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
DUNS Number:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 90 calendar days after the date offers are due.
AMOUNTS
SEE ATTACHED CLIN PRICING SCHEDULE
Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
U.S. Army Engineer District, Omaha 1616 Capitol Ave.
Omaha, Nebraska 68102-4901
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
STANDARD FORM 1442 BACK (REV. 4-85)
CLIN SCHEDULE 00 10 00 – 3 W9128F-20-R-0085
Am #0005
CONTRACT LINE ITEM (CLIN) PRICING SCHEDULE
ITEM
NO.
DESCRIPTION QTY UNIT AMOUNT
BASIC ITEMS
Entire work complete for Design of the SOCNORTH Theater Operational Support Facility, including all Basic and Option Items listed below. Design in compliance with all requirements contained in this RFP, its attachments, references, and appendices.
Job
Entire work complete for Construction of the SOCNORTH Theater Operational Support Facility, complete to the five-foot line (8,192 square meters), excluding items separately listed below. Scope includes construction of the design and associated systems described above and throughout this Contract.
Entire work complete for Construction of Sitework, Utilities, and Pavements from five-foot line to the limits of construction of the SOCNORTH Theater Operational Support Facility, including all required demolition, excluding items listed separately below.
Entire work complete for Procurement and Installation of Generator Sets and associated switchgear, controls and monitoring, and connections to fuel system.
Entire work complete for Construction of communications lines and ductbank from the SOCNORTH facility to Building 1038.
Entire work complete for cybersecurity documentation, and alterations to commercial equipment, devices, firmware, and software to satisfy cybersecurity requirements.
TOTAL BASIC AMOUNT $_____________________________
CLIN SCHEDULE 00 10 00 – 4 W9128F-20-R-0085
OPTION ITEMS
[Option]
Installation of FF&E. (O&M funded)
Installation of Intrusion Detection System (IDS) and Electronic Security Systems (ESS) to include facility Access Control System (ACS). (O&M funded)
Installation of audio-visual (A/V) system equipment and devices. (O&M funded)
Installation of CCTV system equipment and devices. (O&M funded)
Installation of uninterruptable power system (UPS) equipment and devices. (O&M funded)
Entire work complete to provide access control and secure area oversight as defined in 01 14 00 Work Restrictions and associated references. (O&M funded)
Entire work complete to construct south parking lot including associated landscape and lighting.
Additional cost to complete to construct parking using permeable pavers in lieu of asphalt.
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________
NOTES:
1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise option Items No. 0013 and 0014 within 90 calendar days of Notice to Proceed and remaining options within 560 calendar days of Notice to Proceed.
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted. Abbreviation: Operations and Maintenance (O&M).
CLIN SCHEDULE 00 10 00 – 5 W9128F-20-R-0085
3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected.
4. Contract duration is 740 calendar days; however, if any of the O&M funded Option Items No. 0007 – 0012 are awarded, the contract duration shall be increased by 100 calendar days up to a maximum total contract duration of 840 calendar days.
This page was intentionally left blank for duplex printing.
SOCNORTH Theater Operational Support Facility - Peterson AFB PE83
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 81 00
SUMMARY OF THE WORK
05/18
PART 1 GENERAL
1.1 REFERENCES
1.2 DESIGN AND CONSTRUCTION OBJECTIVES
1.2.1 Building Durability
1.2.2 Site Constraints
1.2.2.1 Critical Fiber Communications Standoff Distance
1.2.2.2 Site Access and Work Restrictions
1.3 PROJECT DESCRIPTION
1.4 PROJECT SITE
1.5 DESIGN AND CONSTRUCTION OBJECTIVES
1.5.1 Site and Infrastructure Functions
1.5.2 Facility Functions
1.6 PROJECT SCOPE
1.6.1 Existing Conditions
1.6.2 Demolition
1.6.3 New Work
1.7 DESIGN AND CONSTRUCTION REQUIREMENTS
1.7.1 Changes to RFP Criteria Requirements
1.7.2 Codes and Criteria
1.7.3 Secure Areas
1.7.3.1 Future Special Access Program (SAP) Spaces
1.7.4 Open-Storage Areas
1.7.5 Shelter-in-Place Provisions
1.7.6 Changes to RFP Criteria Requirements
1.7.7 Phasing of Work, Security, and Construction Staging
1.7.8 Sustainability
1.7.8.1 Criteria
1.7.8.2 Life-Cycle Cost Analysis (LCCA)
1.7.8.2.1 LCCA Format
1.7.8.2.2 LCCA Building-Level Analysis
1.7.8.2.3 LCCA Individual Component or System Alternatives
Analysis
1.7.8.3 Energy Consumption Reduction Requirement
1.7.8.4 Energy Compliance Analysis (ECA)
1.7.8.4.1 ECA Narrative Requirements
1.7.8.5 Total Building Commissioning
1.7.9 Cybersecurity
1.7.10 Bridging Documents
1.7.11 Design and Construction Measurement Units
1.7.12 Personnel Qualifications and Experience
1.7.13 Design and Construction Deliverables
1.7.14 Advanced Modeling and Facility Data Requirements
1.7.15 Operations and Maintenance Requirements
1.8 OVERVIEW OF DESIGN-BUILD PROCESS
1.8.1 Overview
SECTION 01 81 00 Page 1Am #0005
1.8.2 Process
1.9 DESIGN-BUILD CONTRACTOR REQUIRED A/E SERVICES
1.9.1 Dimensions
1.9.2 Professional Registrations, Licenses and/or Certifications
1.9.3 Request For Proposal - Binding Information
1.9.4 Evaluation of Systems
1.9.5 Documents Requirements
1.10 COMMON DEFICIENCIES
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 81 00 Page 2Am #0005
SECTION 01 81 00
SUMMARY OF THE WORK
05/18
PART 1 GENERAL
1.1 REFERENCES
The design publications listed below shall be used as sources of criteria for the design. The most current edition of the code or standard (with errata and addenda) available at the RFP proposal submission deadline shall be used as criteria for the design - unless noted otherwise. The criteria from these sources may be supplemented, but not supplanted, by applicable criteria contained in nationally recognized codes and standards.
[*Am-5] INTELLIGENCE COMMUNITY STANDARD (ICS)
ICS 705-1 Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities
ICD/ICS 705 Technical Specification for Construction and Management of Sensitive Compartmented Information Facilities
ICS 705-1 Physical and Technical Security Standard for Sensitive Compartmented Information Facilities
ICS 705-2 Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information [**Am-5]
U.S. DEPARTMENT OF DEFENSE (DOD)
DOD 8510.01 (2014; Change 1-2016; Change 2-2017) Risk Management Framework (RMF) for DoD Information Technology (IT)
DODI 8500.01 (2014) Cybersecurity
UFC 1-200-01 (2019) DoD Building Code (General Building Requirements)
UFC 1-200-02 (2016; Change 4, 2019) High Performance and Sustainable Building Requirements
UFC 3-101-01 (2011; Change 5, 2019) Architecture
UFC 3-600-01 (2016; Change [*Am-4] 5 [**Am-4], 2020) Fire Protection Engineering for Facilities
UFC 4-010-06 (2016; Change 1, 2017) Cybersecurity of Facility-Related Control Systems
UFC 4-021-01 (2008; with Change 1, 2010) Design and
SECTION 01 81 00 Page 3Am #0005
[*Am-5] INTELLIGENCE COMMUNITY STANDARD (ICS)
ICS 705-1 Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities
ICD/ICS 705 Technical Specification for Construction and Management of Sensitive Compartmented Information Facilities
ICS 705-1 Physical and Technical Security Standard for Sensitive Compartmented Information Facilities
ICS 705-2 Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information [**Am-5]
O&M: Mass Notification Systems
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST SP 800-82 NIST Special Publication: Guide to Industrial Control Systems (ICS) Security
1.2 DESIGN AND CONSTRUCTION OBJECTIVES
The design and construction of the SOCNORTH facility under this Contract shall comply with specifications and requirements contained in this Request for Proposal (RFP). Requirements emphasize low maintenance exterior and interior finishes as well as high energy efficiency. This project shall be designed and constructed to achieve federal guiding principles compliance via completion of the Air Force MILCON Sustainability Requirements Scoresheet. See 01 33 29 SUSTAINABILITY REPORTING for additional information.
The floor plans and elevations provided in this RFP are conceptual and establish the general requirements for square foot area, functional arrangement of rooms and spaces, exterior treatments and the overall unit configuration. During the design stages, the contractor shall make necessary adjustments to ensure constructability and compliance with the RFP criteria and requirements. The plans and elevations do not indicate all necessary construction requirements or components; the RFP describes associated technical, performance and system requirements. Design and construction shall be in accordance with all applicable industry and Air Force criteria, and the requirements of this RFP.
Design Quality Objective: The project objective is to obtain facilities to accommodate a maximum of 8,385 SM (90,255 SF) of accredited secure and open-storage administrative and training space with complementary site development within the funds available. Design quality is achieved through the integration of the facility to the site, balancing architecture features, managing design and construction security requirements, functionality and design for low-cost maintenance and operation. The Government desires to construct facilities of such quality that the foundations, foundation walls, footings, slabs and other foundation components last for a life of 50 years without structural damage, due to expansive soils or other geologic conditions, to the foundation or structures that the foundation supports.
It is desired that all equipment and products be easy to service, maintain, repair, and replace. All products or equipment shall follow industry standards. In extenuating circumstances, the use of special designed or manufactured items may be allowed, but they shall be submitted to the government for review and written approval prior to production, order or manufacture.
Scope of Work:
The proposal documents shall include adequate information to enable the Government to adequately evaluate the proposal for understanding and compliance with the entire scope of work. See Section 00 22 00 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD for complete requirements.
Project architectural features included but are not limited to [*Am-3]
SECTION 01 81 00 Page 4Am #0005
<text deleted> [**Am-3]stud backup wall construction, insulation, doors, windows/curtainwall, building hardware, gypsum wallboard, paint, wall coverings, cabinets, carpets, tile, acoustical ceiling tile, toilets, lavatories and accessories. Mechanical work includes but is not limited to construction of complete HVAC system(s) for the new facility, boilers and chillers, HVAC equipment and all associated controls, plumbing, EMCS/DDC and fire protection systems, lightning protection systems, complete cathodic protection system utilizing sacrificial anodes. Interior electrical includes panel boards, lighting fixtures, and general building power requirements. Communications work includes but is not limited to fiber optic and voice/data cabling including pre-wiring keyless access, CATV, security systems infrastructure, mass notification system and paging system. Anti-terrorism and force protection design and construction will be applied on this project.
1.2.1 Building Durability
Materials and equipment will be chosen for their durability and minimum maintenance. The building design shall conserve natural and manmade materials.
1.2.2 Site Constraints
See the bridging documents for the proposed project site(s). The site is highly constrained by a variety of factors. The contractor shall ensure the facility is designed and constructed in compliance with all site constraints including but not limited to the following:
1.2.2.1 Critical Fiber Communications Standoff Distance
A fiber communications concrete-encased duct which bisects the site shall remain undisturbed in its entirety. See the provided survey for the approximate location. Installation of foundations and utilities along the duct shall be located no closer than 5'-0" from the horizontal edge of the concrete encasement. Installation of grade beams (or other appropriate foundation feature) and utilities crossing the duct shall be located no closer than 1'-6" in any direction of the concrete encasement. Protective measures shall be taken during grading and construction activities to prevent disturbance to this concrete-encased duct.
1.2.2.2 Site Access and Work Restrictions
The various components of work fall under different levels of protection and oversight. Close coordination with the Government will be required during all phases of design and construction. See 01 14 00 WORK RESTRICTIONS and the bridging documents for requirements and restrictions related to various components of work.
1.3 PROJECT DESCRIPTION
The purpose of this project is to design and construct a new SOCNORTH Headquarters building that will serve as an administrative headquarters and command and control center. Major features include administrative office space, storage and secure areas. The secure areas provide space for Joint Operations Command (JOC), Special Technical Operations (STO), and administration space for J2, J3, and J5. Administrative functions include the Command Headquarters, J0, J1, J4, J6, and J8 staff. SOCNORTH has considerable storage requirements as various groups need to be prepared for rapid deployment.
SECTION 01 81 00 Page 5Am #0005
The new SOCNORTH facility is a two-story building. Certain functions such as major storage, and mechanical, fire riser, and primary electrical service rooms will be located on the first floor as they require visitor access, vehicular access, loading/unloading of materials, and/or access by base maintenance personnel. A lobby is adjacent to the main entry and will include space for reception with a waiting area in order to process security badges and facilitate access to the rest of the building through controlled access.
Project architectural features include but are not limited to construction of steel stud and masonry walls, concrete slabs, insulation, doors, windows/storefronts/curtainwall, building hardware, gypsum wallboard, paint, wall coverings, cabinets, carpets, tile, acoustical ceiling tile, toilets, lavatories and accessories.
Mechanical features include but are not limited to new HVAC system(s), utility service connections, HVAC equipment and all associated controls, plumbing, EMCS/DDC and fire protection/sprinkler systems. For additional information regarding mechanical requirements see Specification Section 01
86 10 MECHANICAL REQUIREMENTS.
Interior electrical includes panel boards, lighting fixtures, and general building power requirements. Communications work includes but is not limited to fiber optic and voice/data cabling, including pre-wiring keyless access, CCTV, CATV, and security systems infrastructure. (For additional information regarding electrical requirements see Specification Section 01 86 26 ELECTRICAL REQUIREMENTS.)
A fire alarm and mass notification system shall be installed throughout the facility in accordance with UFC 3-600-01 and UFC 4-021-01. A fire sprinkler system shall be installed throughout the facility in accordance with UFC 3-600-01.
See all discipline requirements sections of this RFP, combined with the bridging documents for the full technical scope of work relating to this project.
1.4 PROJECT SITE
The project is located at Peterson AFB, Colorado, within the Command Character area on the installation. Vicinity and location maps are included in the bridging documents provided with this RFP.
1.5 DESIGN AND CONSTRUCTION OBJECTIVES
The primary purpose of this project is to create interior spaces tailored to occupying unit operational needs, with a facility functional life of 50 years. See the bridging documents for floor plans, as well as space-by-space requirements for the new facility.
Among the features of work are the following. See individual discipline requirements specifications for additional requirements:
a. Design and installation of an air barrier system for the building to meet UFC 3-101-01 and the standards set forth in it.
b. Entire work complete for Procurement and Installation of Generator Set and Switchgear, associated controls and monitoring, and
SECTION 01 81 00 Page 6Am #0005 connections to fuel system.
c. Entire work complete for construction of communications lines and ductbank from the SOCNORTH facility to Building 1038.
d. Entire work complete for cybersecurity documentation and alterations to commercial equipment, devices, firmware, and software to satisfy cybersecurity requirements.
e. (Bid Option) Procurement and installation of furniture, furnishings, and equipment (FF&E).
f. (Bid Option) Procurement and installation of Intrusion Detection System (IDS) and Electronic Security Systems (ESS) to include facility Access Control System (ACS).
g. (Bid Option) Procurement and installation of CCTV system equipment and devices.
h. (Bid Option) Procurement and installation of audio-visual (A/V) system equipment and devices.
i. (Bid Option) Entire work complete for procurement and installation of uninterruptable power system (UPS) equipment and devices.
j. (Bid Option) Entire work complete to provide access control and secure area oversight as defined in 01 14 00 Work Restrictions and associated references.
k. (Bid Option) Entire work complete to construct south parking lot including associated landscape and lighting.
l. (Bid Option) Additional cost complete to construct parking using permeable pavers in lieu of asphalt pavement.
See 00 10 00 SF 1442 AND CONTRACT LINE ITEM PRICING SCHEDULE for a bid schedule including basic bid items as well as bid options.
1.5.1 Site and Infrastructure Functions
Significant site work is required by this project, including building earthwork, parking lots, drives, sidewalks and landscaping, as indicated in the briding documents. Coordinate laydown and staging areas with the Government after contract award; tenative staging areas are indicated in the bridging documents.
1.5.2 Facility Functions
The facility is intended to serve multiple SOCNORTH companies, yielding a requirement for a somewhat compartmentalized floor plan, as indicated in the briding documents. Building systems, door hardware, access control systems, and other building components shall be configured in a manner that preserves that compartmentalization. See the bridging documents for primary points of entry for each of those compartments. Those systems shall be configured to allowed shared access of spaces and resources when the units desire to do so.
The facility shall accomodate personnel at workstations and personnel's equipment storage lockers as shown on the bridging documents.
SECTION 01 81 00 Page 7Am #0005
1.6 PROJECT SCOPE
This project requires design and construction of the new SOCNORTH facility as described within this RFP.
The design shall include all work for the new SOCNORTH facility, including bid options. See Section 01 33 00.32 DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES for additional requirements.
1.6.1 Existing Conditions
The existing site is an open site with no existing structures. The site is adjacent to the base perimeter in the northeast corner of Peterson AFB in the Command Character area.
1.6.2 Demolition
Conduct all demolition necessary to meet all requirements as described in this RFP. See 02 41 00 DEMOLITION for additional requirements. Demolition shall include, but is not limited to the following:
a. Site materials at new SOCNORTH facility location.
1.6.3 New Work
Provide all work neccessary to construct the SOCNORTH facility in full compliance with the bridging documents, and all portions of this RFP -including but not limited to the following:
a. Provide walls, substrates, and finishes as indicated by the room finish schedule.
b. Provide a fire sprinkler system and sprinkler heads per accommodate floor plan layout per 01 86 13 FIRE PROTECTION REQUIREMENTS.
c. Provide fire alarm and mass notification per 01 86 13 FIRE
PROTECTION REQUIREMENTS.
d. Provide lighting (fixtures, switches, and wiring) per 01 86 26
ELECTRICAL REQUIREMENTS.
e. Provide ceilings where indicated in rooms per 01 82 00
ARCHITECTURAL REQUIREMENTS.
f. Provide communications infrastructure, equipment, and wiring per
01 86 26 ELECTRICAL REQUIREMENTS.
g. Provide building power, equipment, conduit, wiring, and receptacles per 01 86 26 ELECTRICAL REQUIREMENTS.
h. Provide HVAC equipment, diffusers, grilles, and associated ductwork per 01 86 10 MECHANICAL REQUIREMENTS.
i. Provide plumbing fixtures, supply lines, vent and waste lines per
01 86 10 MECHANICAL REQUIREMENTS.
j. Install an air barrier system on the exterior walls per 01 82 00
ARCHITECTURAL REQUIREMENTS.
SECTION 01 81 00 Page 8Am #0005
k. Provide interior and exterior doors, frames, and door hardware as indicated in the bridging documents and per 01 82 00 ARCHITECTURAL
REQUIREMENTS.
l. Provide storage lockers/cages where indicated in the bridging documents per 01 82 00 ARCHITECTURAL REQUIREMENTS.
m. Provide Intrusion Detection System (IDS), Electronic Security System (ESS) and facility Access Control System (ACS) infrastructure, conduit, and wiring for new IDS and ESS systems (infrastructure/wiring in base bid, IDS, ESS and ACS equipment and systems in bid option).
n. Provide closed-circuit television (CCTV) infrastructure, conduit and wiring for new CCTV system (infrastructure/wiring in base bid, CCTV equipment and system in bid option).
o. Provide A/V system infrastructure, conduit, and wiring for A/V system (infrastructure/wiring in base bid, A/V equipment and system in bid option).
1.7 DESIGN AND CONSTRUCTION REQUIREMENTS
1.7.1 Changes to RFP Criteria Requirements
This Request for Proposal provides requirements expected of the Design-Build Contractor during the design and construction of this project.
The RFP bridging documents present an overall design concept of the project; provide useful project information; establish some definition of the systems to be used; and incorporate requirements expected by the Using Service.
It shall be the responsibility of the Design-Build Contractor to assemble the best-value-priced construction systems for this project that meet or exceed all provisions of the RFPand referenced criteria set forth herein.
Offerors should not consider changes to RFP criteria requirements during proposal preparation. After contract award, any changes to the RFP criteria requirements require approval by the Contracting Officer.
See Section 01 33 00.32 DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES for additional requirements.
1.7.2 Codes and Criteria
All pertinent building codes, life safety codes, and reference criteria shall be met or exceeded. This project utilizes the DoD Building Code, as defined by UFC 1-200-01 and its references.
If there is a conflict in requirements, order of precedence shall be as follows, in order of decreasing precedence:
a. Life Safety, as defined by DoD Building Code UFC 1-200-01 and its references;
b. RFP Specifications;
c. RFP Drawings;
SECTION 01 81 00 Page 9Am #0005
d. Non-life safety criteria, as defined by DoD Building Code UFC 1-200-01 and its references;
e. Peterson AFB Construction Standards (5.12.20) and Peterson AFB Installation Facilities Standards (IFS) - 7.31.18;
f. Other criteria as listed herein.
***Note that some appendices, such as the Peterson AFB Installation Facilities Standards (IFS) and Peterson AFB Construction Standards are provided for reference and/or refinement of referenced critera and RFP requirements. These items are labelled as such, and contain disclaimers and caveats as such on their respective cover sheets. The contents of these appendices shall not supercede any codes, criteria, or requirements indicated above except as specifically outlined above.
1.7.3 Secure Areas
Areas identified in the RFP and bridging documents as "secure area" shall be designed, constructed, and accredited to the criteria listed below. The contractor shall design and construct the perimeter and all spaces within the boundary in compliance with the following criteria:
The listed criteria carries impacts to all building systems within the designated boundary. Use the most current version of the referenced criteria available at the RFP proposal submission deadline:
a. ICD/ICS 705 - Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities.
b. ICS 705-1 - Physical and Technical Security Standards for Sensitive Compartmented Information Facilities.
c. ICS 705-2 - Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information.
d. UFC 4-010-05 - Sensitive compartmented Information Facility Planning, Design and Construction.
The following factors shall be used when applying criteria described above:
e. Facility is being constructed within the Continental United States
(CONUS).
f. Amplified sound is present in some of the occupied spaces within the secure area, as shown in the bridging documents.
g. Facility shall be treated as having moderate threat level per TEMPEST risk assessment.
h. RF shielding is required at the secure area perimeter.
i. All open and private offices shall be constructed to "open storage" requirements per secure area criteria.
j. Spaces and/or space groups shall be constructed to compartmented areas when indicated in the bridging documents. See secure area criteria for
SECTION 01 81 00 Page 10Am #0005 requirements.
1.7.3.1 Future Special Access Program (SAP) Spaces
Areas identified in the RFP and bridging documents as "SAP spaces" shall be designed, constructed but not separately accredited as individual secure areas within the secure area (s) that they occur. The contractor shall design and construct the perimeter and all spaces within the boundary in compliance with the secure area criteria listed above, but with the following assumptions:
a. Facility is being constructed within the Continental United States
(CONUS).
b. Amplified sound is present within all SAP spaces.
c. Facility shall be treated as having moderate threat level per TEMPEST risk assessment.
d. RF shielding is not required at each SAP perimeter.
1.7.4 Open-Storage Areas
The secure training area and boundary indicated in the bridging documents shall be classified and accredited as secure "open-storage" space in compliance with the following criteria. See the bridging documents for the approximate perimeter of "open-storage" spaces from otherwise designated functions. The contractor shall design and construct the perimeter and all spaces within the boundary in compliance with the following criteria. The listed criteria carries impacts to many building systems within the designated boundary. Use the most current version of the referenced criteria available at the time of contract award:
a. AFI 31-101 - Integrated Defense.
b. DODM 5200.01 - (Volumes 1-3) DOD Information Security Program.
c. AFI 16-1404 - Air Force Information Security Program.
d. AFI 16-1406 - Air Force Industrial Security Program.
e. AFM 33-221 - Communications Security: Protected Distribution Systems
(PDS)
1.7.5 Shelter-in-Place Provisions
The project design shall accommodate basic provisions for shelter-in-place activities per applicable criteria. The design shall include features, where appropriate, that allow compliance with basic shelter-in-place provisions including but not limited to open space for a short duration stay (5 SF/PN), 100% exhaust air, locking door hardware, space for an appropriately sized emergency provisions kit, etc. [*Am-4] Locations for these shelter-in-place provisions shall be in the following rooms: 135, 137, 270, 271 and 284. [**Am-4]
1.7.6 Changes to RFP Criteria Requirements
This Request for Proposal provides requirements expected of the Design-Build Contractor during the design and construction of this
SECTION 01 81 00 Page 11Am #0005 project. The RFP drawings present an overall design concept of the project, provide useful project information, establish some definition of the systems to be used, and incorporate requirements expected by the Using Service.
It shall be the responsibility of the design-build Contractor to assemble the best-valued-priced construction systems for this project that meet or exceed the design criteria set forth herein.
Offerors shall not consider changes to RFP criteria requirements during proposal preparation. After contract award, any changes to the RFP criteria requirements require approval by the Contracting Officer.
See Section 01 33 00.32 DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES for additional requirements.
NOTE: If there is a conflict between the Peterson Air Force Base Installation Facilities Standards, Peterson Air Force Base Construction Standards and the RFP criteria, the RFP criteria governs with questions being directed to the Contracting Officer before proceeding.
1.7.7 Phasing of Work, Security, and Construction Staging
The Contractor shall maintain a construction area fence throughout the duration of the contract. See Section 01 89 00 SITE WORK REQUIREMENTS and the bridging documents for additional information.
1.7.8 Sustainability
1.7.8.1 Criteria
Comply with Air Force sustainable design and development (SDD) criteria as follows:
Comply with all the Federal sustainability requirements as detailed in UFC 1-200-02, High Performance and Sustainable Building Requirements.
Design Build Contractor is responsible for all costs and activities required to successfully third-party validate that all of the Federal/UFC requirements have been met using the DoD version of either the US Green Building Council (USGBC)/Green Business Certification Inc. (GBCI) Guiding Principles Assessment or Green Building Initiative (GBI) Guiding Principle Compliance (GPC) system. (See specification section 01 33 29).
Use the AF Sustainability Requirements Scoresheet (attached) to track and report project compliance status at all design/construction submittals;
and submit the Microsoft Excel scoresheet, along with the design analysis to AFCEC.CF.SustainableRpt@us.af.mil in conjunction with each design submission and when construction is complete.
1.7.8.2 Life-Cycle Cost Analysis (LCCA)
The purpose of the LCCA methodology as detailed in CFR Title 10 Part 436 Subpart A is to identify and compare life-cycle cost-effective (LCCE) building energy and water systems that will in total achieve the energy and water requirements stated in this document. An LCCA is required for the following:
1. Energy consuming systems (ex: HVAC Systems and Domestic Water Heating
SECTION 01 81 00 Page 12Am #0005
System)
2. When LCCE is selected as the reason any requirement of the AF Sustainability Requirements Scoresheet is "Partially compliant" or "Not Applicable" (reference paragraph 4-2). The LCCA methodology may also be used to evaluate multiple options, such as selecting the building construction type and comparing compliant materials; and is at the discretion of the project team.
1.7.8.2.1 LCCA Format
Prepare the LCCA in accordance with CFR Title 10 Part 436, Subpart A and NIST Handbook 135 "Life-Cycle Costing Manual for the Federal Energy Management Program". The LCCA must be prepared using the Building LifeCycle Costing (BLCC) program, available from the National Institute of Standards and Technology (http://energy.gov/eere/femp/building-lifecycle-cost-programs). The implied long-term inflation rate and discount rates identified in the Annual supplement to NIST Handbook 135 must be used. A link to BLCC can also be found at the Department of Energy's building energy tools web site: http://energy.gov/eere/femp/buildinglife-cycle-cost-programs.
1.7.8.2.2 LCCA Building-Level Analysis
Any building-level LCCA must be calculated using a maximum of a 40-year building life and equipment lives based on accepted industry averages.
Individual components or systems life expectancies must be reflected by inclusion of appropriate replacement and salvage values in the appropriate year of this analysis.
1.7.8.2.3 LCCA Individual Component or System Alternatives Analysis
LCCAs comparing at least three individual component or system alternatives must use the estimated life of the mutually exclusive alternative having the longest life, not to exceed 40 years from the beginning of beneficial use or the lowest common multiple of the expected lives of the alternatives. Include the appropriate replacement and salvage values for each of the other alternatives. A number of tools comparing energy system alternatives and evaluating specific efficiency measures may be of benefit in performing energy efficiency calculations. Perform this analysis based on the actual conditions expected over the life of the facility including anticipated occupancies, scheduled hours of operation and process loads.
Use UFC 3410-01 Appendix E.
1.7.8.3 Energy Consumption Reduction Requirement
Meet the requirements of ASHRAE 90.1.
Design the building to achieve at least 30% energy consumption reduction from ASHRAE 90.1 baseline.
If a 30% reduction is not LCCE, modify the design of the proposed building to achieve an energy consumption level at the highest level of energy efficiency that is LCCE.
Determine energy consumption levels for both the ASHRAE Baseline Building and proposed building alternatives by using the Performance Rating Method found in UFC 1-200-02.
SECTION 01 81 00 Page 13Am #0005
1.7.8.4 Energy Compliance Analysis (ECA)
In the design analysis, include an ECA which demonstrates compliance with all energy related requirements in UFC 1-200-02. Identify the specific energy efficiency criteria that apply to the project, the software used to prepare the necessary calculations, a summary of all input to and output from the calculations, and the calculated baseline and as-designed building energy consumption of the proposed design. Include in the ECA a completed "Performance Rating Report" as shown in Appendix G of the ASHRAE
90.1 "User's Manual." Building-level energy consumption calculations must be performed using a computer program or programs that integrate architectural features such as windows for daylighting, air-conditioning, heating, lighting, and other energy producing or consuming systems. These programs must be capable of simulating the features, systems, and thermal loads used in the design. Include the energy savings and any parasitic energy loads associated with the utilization of recovered energy, solar heat, solar photovoltaic energy and other renewable or waste heat applications. The program must be capable of performing 8,760 hourly calculations. The Department of Energy (DoE) maintains a list of building energy tools for design (such as eQuest).
1.7.8.4.1 ECA Narrative Requirements
ECA LCCA narratives must be prepared by each of the following individuals:
the Lead Project Architect, Lead Project Mechanical Engineer, and the Lead Project Electrical Engineer. List in each of the three narratives the conservation features considered for that discipline; conservation measures adopted in the design; and any supporting LCCA calculations.
1.7.8.5 Total Building Commissioning
Apply total building commissioning principles and fully commission the facility, in compliance with 01 91 00.15 TOTAL BUILDING COMMISSIONING and
UFC 1-200-02.
1.7.9 Cybersecurity
All control systems (including systems separate from an energy management control system) shall be planned, designed, acquired, executed, and maintained in accordance with DODI 8500.01, DOD 8510.01, NIST SP 800-82, and UFC 4-010-06, and as required by individual Service Implementation Policy. Systems requiring cybersecurity are listed in 01 86 10 MECHANICAL
REQUIREMENTS.
1.7.10 Bridging Documents
Conceptual drawings of the site plans, floor plans, and elevations are included for use in developing this design.
1.7.11 Design and Construction Measurement Units
Design, products, and construction for the project shall be accomplished using English units of…