This solicitation seeks a design-build contractor to conduct hazardous materials abatement and reconstruction design services for 68 columns at the Paul G. Rogers Federal Building in West Palm Beach, Florida. The General Services Administration is procuring pre-alteration assessment, asbestos abatement and disposal of cladding materials and mastics, structural analysis of columns and walkways, and concrete repairs and new coatings. Offerors must provide past performance, key personnel qualifications, and pricing, with award being made to the technically acceptable proposal with the lowest price using lowest price technically acceptable source selection. The deadline for questions is November 10th and proposals are due by November 24th.

This is a 100% set-aside for total small businesses. The primary NAICS code is 541330 with an estimated value between $1-5 million. The place of performance is the Paul G. Rogers Federal Building located at West Palm Beach, Florida 33401. The contractor must complete pre-alteration testing, design four conceptual options and one full design option for refinishing 68 columns, and structural analysis with a period of performance from December 2022 through October 2023. Concrete repairs and new coatings must also be installed on the walkways.

Notice text

2 versions

Update #2 · Latest ·

11/18/22 Amendment 0001-RFI responses. 

This project requires the Design Build Contractor to perform a Pre-Alterations Assessment for Hazardous Materials prior to executing the work. Further the DB Contractor shall design, plan and perform the abatement for ACM containing cladding materials and mastics for 68 columns and properly dispose of the hazardous and non-hazardous materials properly. The DB Contractor shall also provide four (4) conceptual design options, one full design option, and estimated pricing for each reconstruction/refinish options for the 68 columns for GSA SMEs and Historical Preservation review. Additionally, the DB Contractor shall conduct a structural analysis of the existing columns and concrete walkway to determine if any additional work will be required to strengthen the columns or if the proposed finish materials are within the weight capacity of the design. This project includes concrete repairs of the concrete walkway, and new traffic coating and waterproofing of the concrete walkway. This Design Build Contract includes performing Construction and Design services for a Base Contract and Options.

See attachments for complete solicitation and project requirements including, but not limited to, the following: 

Statement of Work, The Solicitation, The Agreement, SF1442, Wage Determination. 

The RFP Instructions, 1 pg, is included as a general guide and reference tool. It is not an official contract document.  

Update #1 ·

This project requires the Design Build Contractor to perform a Pre-Alterations Assessment for Hazardous Materials prior to executing the work. Further the DB Contractor shall design, plan and perform the abatement for ACM containing cladding materials and mastics for 68 columns and properly dispose of the hazardous and non-hazardous materials properly. The DB Contractor shall also provide four (4) conceptual design options, one full design option, and estimated pricing for each reconstruction/refinish options for the 68 columns for GSA SMEs and Historical Preservation review. Additionally, the DB Contractor shall conduct a structural analysis of the existing columns and concrete walkway to determine if any additional work will be required to strengthen the columns or if the proposed finish materials are within the weight capacity of the design. This project includes concrete repairs of the concrete walkway, and new traffic coating and waterproofing of the concrete walkway. This Design Build Contract includes performing Construction and Design services for a Base Contract and Options.

See attachments for complete solicitation and project requirements including, but not limited to, the following: 

Statement of Work, The Solicitation, The Agreement, SF1442, Wage Determination. 

The RFP Instructions, 1 pg, is included as a general guide and reference tool. It is not an official contract document.  

Files

Show all 13

Notice history

Notice Type Posted
Column Abatement and Reconstruction Design, Paul G. Rogers Fed Bldg, W Palm Beach, FL Award Award Notice
This notice Latest solicitation Solicitation
Column Abatement and Reconstruction Design, Paul G. Rogers Fed Bldg, W Palm Beach, FL Pre-Solicitation
Column Abatement and Reconstruction, Paul G. Rogers Fed Bldg, W Palm Beach, FL Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, Florida Homestead, Florida 33039, United States · NAICS 236220 Reserve Command No set-aside
F108--620-26-206 Asbestos Abatement NAICS 562910 Veterans Integrated Service Network 2 No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors