Column Abatement and Reconstruction Design, Paul G. Rogers Fed Bldg, W Palm Beach, FL

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
47PE0722R0021
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
West Palm Beach, Florida 33401, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This Pre-Solicitation Notice seeks design-build services for column abatement and reconstruction at the Paul G. Rogers Federal Building in West Palm Beach, Florida. The selected contractor will be required to perform hazardous materials assessment and abatement for asbestos-containing materials on 68 columns. The contractor must also provide conceptual and full design options for reconstruction and refinishing of the columns, along with a structural analysis of the columns and walkway. The General Services Administration Public Buildings Service Region 4 is seeking these goods and services and will evaluate proposals based on technical qualifications and price. Interested vendors are encouraged to provide feedback on the draft statement of work by August 5, 2022.

This opportunity is set aside for total small businesses and anticipated NAICS codes include 541310, 541330, and 238220. No budget range or current contractor is specified. The project scope includes concrete repairs to the walkway and applying a new traffic coating and waterproofing. Vendors are asked to provide pricing for the base contract and options, though no estimated value or timeline is given. The pre-solicitation notice does not include a formal response due date or anticipated award date.

Notice text

Acquisition Note: Potential Bidders are HIGHLY encouraged to provide feedback regarding the Statement of Work requirements and approach, prior to or shortly following RFP issuance. The attached SOW is a draft (no atchs) and work in progress, which may result in further revisions. Previous version(s) should not be used for bidding purposes.

DESCRIPTION: 

This project requires the Design Build Contractor to perform a Pre-Alterations Assessment for Hazardous Materials prior to executing the work. Further the DB Contractor shall design, plan and perform the abatement for ACM containing cladding materials and mastics for 68 columns and properly dispose of the hazardous and non-hazardous materials properly. The DB Contractor shall also provide four (4) conceptual design options, one full design option, and estimated pricing for each reconstruction/refinish options for the 68 columns for GSA SMEs and Historical Preservation review. Additionally, the DB Contractor shall conduct a structural analysis of the existing columns and concrete walkway to determine if any additional work will be required to strengthen the columns or if the proposed finish materials are within the weight capacity of the design. This project includes concrete repairs of the concrete walkway, and new traffic coating and waterproofing of the concrete walkway. This Design Build Contract includes performing Construction and Design services for a Base Contract and Options.

Note: Set-aside type is not official until RFP release, however, it reflects the analysis of responses from the previously issued sources sought notice.  

Files

Notice history

Notice Type Posted
Column Abatement and Reconstruction Design, Paul G. Rogers Fed Bldg, W Palm Beach, FL Award Award Notice
Amendment 0001, Column Abatement and Reconstruction Design, Paul G. Rogers Fed Bldg, W Palm Beach, FL Latest solicitation Solicitation
This notice Pre-Solicitation
Column Abatement and Reconstruction, Paul G. Rogers Fed Bldg, W Palm Beach, FL Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors