T02 DB SOW Attachment 5 Structural As Built Details 2022 07 07.pdf
PDF 837 KB Posted
- Attached to
- Amendment 0001, Column Abatement and Reconstruction Design, Paul G. Rogers Fed Bldg, W Palm Beach, FL
- Solicitation number
- 47PE0722R0021
About this file
This solicitation is for a design-build contractor to perform hazardous materials abatement and reconstruction services on columns at the Paul G. Rogers Federal Building in West Palm Beach, Florida. The selected contractor will be required to conduct a pre-alteration hazardous materials assessment, abate asbestos-containing materials from 68 columns, properly dispose of all hazardous and non-hazardous waste, and provide structural analysis and design options for reconstructing or refinishing the columns. Additional requirements include concrete repairs to the walkway, and applying new traffic coating and waterproofing. The solicitation was issued by the General Services Administration and proposals are due by the date specified in Amendment 0001. Pricing will be provided for the base contract and optional items.
The key requirements are hazardous materials abatement of columns, structural analysis and design services, and concrete and coating work. The solicitation was issued by GSA and proposals are due on the amended date. Pricing will include options in addition to the base scope of work.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bldg Section A-A
| Main Roof Framing Plan |
| Structural Sections Penthouse |
File details come from the government source that posted it. Updated .