T10 RFP Instructions 47PE0722R0021 2022 10 24.pdf
PDF 136 KB Posted
- Attached to
- Amendment 0001, Column Abatement and Reconstruction Design, Paul G. Rogers Fed Bldg, W Palm Beach, FL
- Solicitation number
- 47PE0722R0021
About this file
This request for proposal solicits design-build services for column abatement and reconstruction at the Paul Rogers Federal Building and Courthouse in West Palm Beach, Florida. The selected contractor will be required to perform hazardous materials assessments of existing columns, develop conceptual design options and cost estimates for reconstruction, conduct structural analyses of columns and walkways, and complete concrete repairs and new coatings. The base contract value is between $1 million and $5 million. Proposals are due by November 24, 2022 at 5:00 PM EST and will be evaluated using lowest price technically acceptable criteria. This is a 100% small business set-aside offered by the General Services Administration.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA Southeast Sunbelt Region
REQUEST FOR PROPOSAL (RFP) INSTRUCTIONS
GSA Solicitation Number: 47PE0722R0021 – Column Abatement and Reconstruction Design, Paul Rogers Federal Building and Courthouse, West Palm Beach, FL
Place of Performance: 701 Clematis Street, West Palm Beach FL
Contracting Officer (CO): Mark Bentley, (615)_617-6101, mark.bentley@gsa.gov Contract Specialist (CS): Ric Sochor, (813) 215-6989 ric.sochor@gsa.gov Project Manager/COR: Mike Greco, (305) 439-2631 michael.greco@gsa.gov
Who Can Participate in This Procurement?
This procurement is a 100% Small Business set-aside
IAW 52.219-6
Site Visit & Pre-Proposal Conference:
A pre-proposal site visit has been scheduled for:
November 3, 2022, at 1:00 pm EDT.
Offerors are highly encouraged to inspect the site where the work will be performed. See Solicitation Section I.G. FAR 52.236-27 Site Visit – Construction
Bonds & Insurance Requirements
Bid Bond (Provision - FAR 52.228-1) Performance Bond (Clause - FAR 52.228-15) Payment Bond (Clause - FAR 52.228-15) Insurance (Clause - FAR 52.228-5)
Performance Time & Liquidated Damages
The construction performance period is 195 calendar days after issuance of the NTP. The design period is 130 calendar days.
The liquidated damages for each calendar day beyond the performance period completion date: $289.76
Construction Magnitude
Between $1,000,000 - $5,000,000
System for Award Management As prescribed in FAR 4.1100, contractors are required to register in the System for Award Management (SAM) database. Please be sure your record is current!
What D o c u me n t s Do I Submit?
Document
SF 1442 (complete blocks 14 through 20c and price schedule.)
Price Proposal – Reference Solicitation Section II.C.
Tech. Proposal – Reference Solicitation Section II.D.
Bid Bond (SF 24) – Reference Solicitation Section I.F.
Offeror’s Representations and Certifications Reference Solicitation Section II.E.
When Is My Offer Due?
Unless changed by amendment, your proposal is due by the date and time specified in Block 13 of the Standard Form 1442, Solicitation, Offer, and Award which is currently:
Date: 11/24/2022 Time: 5:00 PM (EDT)
Check and acknowledge all amendments for offer due date extensions.
What method of award will be used?
LPTA IAW FAR 15.101-2
Reference Solicitation Section VI.
Where Do I Submit My Offer?
Send your electronic proposal documents to the Contract Specialist (see POC email Info above) mailto:mark.bentley@gsa.gov
File details come from the government source that posted it. Updated .