CO FLAP MES 18(1) 18 Road

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF24B000013
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Colorado, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Transportation Federal Highway Administration is seeking full and open competition for the reconstruction of approximately six miles of 18 Road in Mesa County, Colorado. The scope of work includes roadway excavation, placement of aggregate base and asphalt concrete pavement, drainage improvements, fence replacement, signing, striping, and revegetation. The estimated cost range for the project is between $10,000,000 and $20,000,000. The solicitation has a due date of August 22, 2024, and the government will apply a 10% price evaluation preference for HUBZone small business concerns. Contractors will be required to submit a subcontracting plan if they are a large business with an anticipated award exceeding $1.5 million.

This contract opportunity is not set aside for any particular business size or type. The project is located on Bureau of Land Management (BLM) land in Mesa County, Colorado, and will provide access to the North Fruita Desert Special Recreation Management Area. The key numerical details include 40,000 cubic yards of roadway excavation, 55,000 tons of aggregate base, and 19,000 tons of asphalt concrete pavement. The anticipated start date for the project is Fall 2024, and the contractor must maintain vehicular, cyclist, and pedestrian access during construction.

Notice text

PROJECT NUMBER:  CO FLAP MES 18(1)

PROJECT NAME:  18 Road

PROJECT DESCRIPTION:  The project will reconstruct approximately six miles of 18 Road in Mesa County Colorado.  It is located approximately seven miles north of the City of Fruita, beginning north of the Government Highline Canal and terminating at the existing Bureau of Land Management (BLM) 18 Road BLM Campground.  The project is fully contained within BLM land and the road provides access to the North Fruita Desert Special Recreation Management Area (SRMA) at an approximate elevation of 5,000 to 5,500 feet. 

SCOPE OF THE WORK:  The scope includes reconstruction of the existing roadway, earthwork and grading, placement of aggregate base and placement of asphalt concrete pavement.  The roadway will be improved with minor widening to include vehicular lanes with dedicated bicycle shoulders.  The project includes drainage improvements with two box culvert installations, several minor drainage culvert replacements, ditch grading, and stabilization.  It also includes removal and replacement of fencing, signing, striping, and revegetation.  This road has a high recreational use, primarily for mountain biking, equestrian, and off-road vehicles, and camping.  Vehicular, cyclist, and pedestrian access through roadway and to adjacent public lands must be maintained during construction.

PRINCIPAL WORK ITEMS:

40,000 cubic yards of roadway excavation

55,000 tons of aggregate base

19,000 tons of asphalt concrete pavement

800 linear feet of concrete culverts with end sections

140 linear feet of concrete box culverts

6,500 linear feet of fence, barbed wire

21 acres placing conserved topsoil, mulching, and seeding

70 miles pavement markings, type b solid and broken

Traffic control items

ESTIMATED COST RANGE:  Between $10,000,000 and $20,000,000

This is available for full and open competition.

Attachments

Files attached to this notice, newest first
File Type Posted
Bid Tabulation.pdf PDF
Bid Opening Summary.pdf PDF
A003.pdf PDF
QnA 8.19.24.pdf PDF
A002.pdf PDF
QnA 8.15.24.pdf PDF
QnA 8.8.24.pdf PDF
A001.pdf PDF
QnA 8.1.24.pdf PDF
CO FLAP MES 18(1) 18 Road Final Hydraulics Report with Addendum.pdf PDF
CO FLAP MES18(1) Cross Sections Final - 06_20_2024.pdf PDF
Pavement Report CO FLAP MES 18(1) 18 Road 20240613.pdf PDF
CO FLAP MES18(1) Plans Final - 06_20_2024.pdf PDF
6982AF24B000013.pdf PDF
Show all 14

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
CO FLAP MES 18(1) 18 Road Award Award Notice
CO FLAP MES 18(1) 18 Road This notice · Latest solicitation Solicitation
CO FLAP MES 18(1) 18 Road Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity