Bid Tabulation.pdf

PDF 704 KB Posted

Attached to
CO FLAP MES 18(1) 18 Road Federal contract opportunity
Solicitation number
6982AF24B000013
Issued by
Department of Transportation Federal Highway Administration

About this file

This document is a Bid Tabulation for a Federal contract opportunity. The project is to reconstruct approximately six miles of 18 Road in Mesa County, Colorado, including earthwork, drainage improvements, fencing, signage, and paving. The contract opportunity has a solicitation number of 6982AF24B000013, a project ID of CO FLAP MES18(1), and an estimated cost range between $10,000,000 and $20,000,000. The Federal Highway Administration is the agency overseeing the contract. The apparent low bidder after the HUBZone price preference is Mountain Valley Contracting, Inc. at $11,108,061.65. The solicitation was opened on 08/22/24 in Lakewood, Colorado. The bid tabulation provides detailed pricing line items for various construction activities.

View the file

Other files for this federal contract opportunity

Other files attached to CO FLAP MES 18(1) 18 Road, newest first.
File Type Posted
Bid Opening Summary.pdf PDF
QnA 8.19.24.pdf PDF
A003.pdf PDF
A002.pdf PDF
QnA 8.15.24.pdf PDF
QnA 8.8.24.pdf PDF
A001.pdf PDF
QnA 8.1.24.pdf PDF
Pavement Report CO FLAP MES 18(1) 18 Road 20240613.pdf PDF
CO FLAP MES18(1) Plans Final - 06_20_2024.pdf PDF
6982AF24B000013.pdf PDF
CO FLAP MES18(1) Cross Sections Final - 06_20_2024.pdf PDF
CO FLAP MES 18(1) 18 Road Final Hydraulics Report with Addendum.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HUBZone Price Evaluation

CO FLAP MES 18(1) 18 ROAD Schedule A Total Bid Amount 10% factor Adjusted Bid Amount

Contractor

*Mountain Valley Contracting Inc. (SBC, SDBC) $11,108,061.65 $11,108,061.65 $0.00 $11,108,061.65 SEMA Construction Inc. (LB) $13,095,991.00 $13,095,991.00 $1,309,599.10 $14,405,590.10 Siete, Inc. (SBC, SDBC) $12,822,963.00 $12,822,963.00 $1,282,296.30 $14,105,259.30 Central Southern Construction (SBC, SDBC, HUBZONE) $11,985,532.00 $11,985,532.00 $0.00 $11,985,532.00 Steve Manning Construction Inc. (SBC, SDBC, HUBZONE) $13,696,832.00 $13,696,832.00 $0.00 $13,696,832.00

*Apparent low bidder after HUBZone Price Preference

Tabulation of Bids Report Date: 09/03/24

1 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF24B000013

Division: Central Federal Lands

State: CO County: Mesa

Federal Land: North Fruita Desert Special Recreation Management Area Opened at: Lakewood, CO

Opened by: Ryan Phillips

Date: 08/22/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Mountain Valley Contracting, Inc. $11,108,061.65 2756 Winters Ave.

Grand Junction, CO 81501

Central Southern Construction Corp. $11,985,532.00 119 Sewald Street Jacksonville, FL 32204

Siete. Inc. $12,822,963.00

SEMA CONSTRUCTION, INC. $13,095,991.00

7353 S. EAGLE STREET

CENTENNIAL, CO 80112

Steve Manning Construction, Inc $13,696,832.00 5211 Churn Creek Road Redding, CA 96002

Engineer's Estimate $12,929,664.00

09/03/2021

Contract Specialist

2 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0010 15101-0000 MOBILIZATION

Mountain Valley Contracting, Inc. Lump Sum $365,245.19 Central Southern Construction Corp. Lump Sum $1,400,000.00 Siete. Inc. Lump Sum $1,250,000.00 SEMA CONSTRUCTION, INC. Lump Sum $1,180,000.00 Steve Manning Construction, Inc Lump Sum $1,300,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,471,332.00

A0030 15215-1000 SURVEY AND STAKING, APPROACH ROAD

Mountain Valley Contracting, Inc. $780.66 $17,955.18 Central Southern Construction Corp. $2,500.00 $57,500.00 Siete. Inc. $2,000.00 $46,000.00

SEMA CONSTRUCTION, INC. $1,000.00 $23,000.00

Steve Manning Construction, Inc $1,200.00 $27,600.00 Engineer's Estimate 23 EACH $1,400.00 $32,200.00

A0050 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Mountain Valley Contracting, Inc. $557.61 $5,018.49 Central Southern Construction Corp. $2,000.00 $18,000.00 Siete. Inc. $5,000.00 $45,000.00

SEMA CONSTRUCTION, INC. $1,500.00 $13,500.00

Steve Manning Construction, Inc $1,300.00 $11,700.00 Engineer's Estimate 9 EACH $1,200.00 $10,800.00

A0070 15215-5000 SURVEY AND STAKING, BOX CULVERT

Mountain Valley Contracting, Inc. $3,234.16 $6,468.32 Central Southern Construction Corp. $7,500.00 $15,000.00 Siete. Inc. $5,000.00 $10,000.00

SEMA CONSTRUCTION, INC. $3,000.00 $6,000.00

Steve Manning Construction, Inc $4,000.00 $8,000.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00

A0090 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL

Mountain Valley Contracting, Inc. $2,457.56 $14,853.49 Central Southern Construction Corp. $12,000.00 $72,528.00 Siete. Inc. $3,500.00 $21,154.00

SEMA CONSTRUCTION, INC. $10,000.00 $60,440.00

Steve Manning Construction, Inc $3,000.00 $18,132.00 Engineer's Estimate 6.044 MILE $24,000.00 $145,056.00

3 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0110 15236-2000 SURVEY CONTROL, GRADE FINISHING

Mountain Valley Contracting, Inc. $3,125.22 $37,777.66 Central Southern Construction Corp. $5,500.00 $66,484.00 Siete. Inc. $3,000.00 $36,264.00

SEMA CONSTRUCTION, INC. $6,000.00 $72,528.00

Steve Manning Construction, Inc $5,000.00 $60,440.00 Engineer's Estimate 12.088 MILE $9,500.00 $114,836.00

A0130 15301-0000 CONTRACTOR QUALITY CONTROL

Mountain Valley Contracting, Inc. Lump Sum $342,598.17 Central Southern Construction Corp. Lump Sum $950,000.00 Siete. Inc. Lump Sum $550,000.00 SEMA CONSTRUCTION, INC. Lump Sum $800,000.00 Steve Manning Construction, Inc Lump Sum $295,000.00 Engineer's Estimate ALL LPSM Lump Sum $320,000.00

A0150 15401-0000 CONTRACTOR TESTING

Mountain Valley Contracting, Inc. Lump Sum $171,944.28 Central Southern Construction Corp. Lump Sum $125,000.00 Siete. Inc. Lump Sum $550,000.00 SEMA CONSTRUCTION, INC. Lump Sum $65,000.00 Steve Manning Construction, Inc Lump Sum $300,000.00 Engineer's Estimate ALL LPSM Lump Sum $320,000.00

A0170 15501-0000 CONSTRUCTION SCHEDULE

Mountain Valley Contracting, Inc. Lump Sum $14,955.19 Central Southern Construction Corp. Lump Sum $75,000.00 Siete. Inc. Lump Sum $25,000.00 SEMA CONSTRUCTION, INC. Lump Sum $100,000.00 Steve Manning Construction, Inc Lump Sum $30,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

A0190 15701-0000 SOIL EROSION CONTROL

Mountain Valley Contracting, Inc. Lump Sum $287,842.19 Central Southern Construction Corp. Lump Sum $375,000.00 Siete. Inc. Lump Sum $150,000.00 SEMA CONSTRUCTION, INC. Lump Sum $500,000.00 Steve Manning Construction, Inc Lump Sum $120,000.00 Engineer's Estimate ALL LPSM Lump Sum $200,000.00

4 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0210 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

Mountain Valley Contracting, Inc. Lump Sum $8,895.04 Central Southern Construction Corp. Lump Sum $50,000.00 Siete. Inc. Lump Sum $10,000.00 SEMA CONSTRUCTION, INC. Lump Sum $50,000.00 Steve Manning Construction, Inc Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00

A0230 15802-0000 WATERING FOR DUST CONTROL

Mountain Valley Contracting, Inc. Lump Sum $138,792.70 Central Southern Construction Corp. Lump Sum $325,000.00 Siete. Inc. Lump Sum $50,000.00 SEMA CONSTRUCTION, INC. Lump Sum $500,000.00 Steve Manning Construction, Inc Lump Sum $182,000.00 Engineer's Estimate ALL LPSM Lump Sum $45,000.00

A0250 20101-0000 CLEARING AND GRUBBING

Mountain Valley Contracting, Inc. $2,101.99 $46,243.78 Central Southern Construction Corp. $2,000.00 $44,000.00 Siete. Inc. $15,000.00 $330,000.00

SEMA CONSTRUCTION, INC. $5,000.00 $110,000.00

Steve Manning Construction, Inc $9,800.00 $215,600.00 Engineer's Estimate 22.0 ACRE $5,500.00 $121,000.00

A0270 20301-1900 REMOVAL OF PIPE CULVERT

Mountain Valley Contracting, Inc. $2,231.07 $26,772.84 Central Southern Construction Corp. $4,000.00 $48,000.00 Siete. Inc. $12,500.00 $150,000.00

SEMA CONSTRUCTION, INC. $7,500.00 $90,000.00

Steve Manning Construction, Inc $4,000.00 $48,000.00 Engineer's Estimate 12 EACH $1,000.00 $12,000.00

A0290 20301-2400 REMOVAL OF SIGN

Mountain Valley Contracting, Inc. $111.52 $557.60 Central Southern Construction Corp. $400.00 $2,000.00 Siete. Inc. $500.00 $2,500.00

SEMA CONSTRUCTION, INC. $110.00 $550.00

Steve Manning Construction, Inc $400.00 $2,000.00 Engineer's Estimate 5 EACH $175.00 $875.00

5 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0310 20302-0700 REMOVAL OF FENCE

Mountain Valley Contracting, Inc. $0.67 $4,482.30 Central Southern Construction Corp. $3.00 $20,070.00 Siete. Inc. $4.00 $26,760.00

SEMA CONSTRUCTION, INC. $2.20 $14,718.00

Steve Manning Construction, Inc $3.00 $20,070.00 Engineer's Estimate 6,690 LNFT $3.00 $20,070.00

A0330 20401-0000 ROADWAY EXCAVATION (CHANNEL GRADING)

Mountain Valley Contracting, Inc. $32.53 $26,024.00 Central Southern Construction Corp. $50.00 $40,000.00 Siete. Inc. $50.00 $40,000.00

SEMA CONSTRUCTION, INC. $32.00 $25,600.00

Steve Manning Construction, Inc $87.00 $69,600.00 Engineer's Estimate 800 CUYD $35.00 $28,000.00

A0350 20401-0000 ROADWAY EXCAVATION

Mountain Valley Contracting, Inc. $48.70 $1,972,350.00 Central Southern Construction Corp. $30.00 $1,215,000.00 Siete. Inc. $45.00 $1,822,500.00

SEMA CONSTRUCTION, INC. $20.00 $810,000.00

Steve Manning Construction, Inc $48.00 $1,944,000.00 Engineer's Estimate 40,500 CUYD $35.00 $1,417,500.00

A0370 20402-0000 SUBEXCAVATION

Mountain Valley Contracting, Inc. $71.41 $35,705.00 Central Southern Construction Corp. $50.00 $25,000.00 Siete. Inc. $450.00 $225,000.00

SEMA CONSTRUCTION, INC. $120.00 $60,000.00

Steve Manning Construction, Inc $450.00 $225,000.00 Engineer's Estimate 500 CUYD $240.00 $120,000.00

A0390 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

Mountain Valley Contracting, Inc. $343.01 $89,182.60 Central Southern Construction Corp. $275.00 $71,500.00 Siete. Inc. $300.00 $78,000.00

SEMA CONSTRUCTION, INC. $300.00 $78,000.00

Steve Manning Construction, Inc $300.00 $78,000.00 Engineer's Estimate 260 CUYD $250.00 $65,000.00

6 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0410 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4

Mountain Valley Contracting, Inc. $341.27 $27,301.60 Central Southern Construction Corp. $300.00 $24,000.00 Siete. Inc. $350.00 $28,000.00

SEMA CONSTRUCTION, INC. $300.00 $24,000.00

Steve Manning Construction, Inc $300.00 $24,000.00 Engineer's Estimate 80 CUYD $250.00 $20,000.00

A0430 25101-0600 PLACED RIPRAP, METHOD A, CLASS 6

Mountain Valley Contracting, Inc. $341.84 $58,112.80 Central Southern Construction Corp. $350.00 $59,500.00 Siete. Inc. $400.00 $68,000.00

SEMA CONSTRUCTION, INC. $300.00 $51,000.00

Steve Manning Construction, Inc $300.00 $51,000.00 Engineer's Estimate 170 CUYD $305.00 $51,850.00

A0470 30101-0000 AGGREGATE BASE

Mountain Valley Contracting, Inc. $36.95 $2,032,250.00 Central Southern Construction Corp. $32.00 $1,760,000.00 Siete. Inc. $35.00 $1,925,000.00

SEMA CONSTRUCTION, INC. $45.00 $2,475,000.00

Steve Manning Construction, Inc $39.00 $2,145,000.00 Engineer's Estimate 55,000 TON $54.00 $2,970,000.00

A0510 40101-0600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3

MILLION ESAL

Mountain Valley Contracting, Inc. $147.21 $2,738,106.00 Central Southern Construction Corp. $132.00 $2,455,200.00 Siete. Inc. $132.00 $2,455,200.00

SEMA CONSTRUCTION, INC. $175.00 $3,255,000.00

Steve Manning Construction, Inc $157.00 $2,920,200.00 Engineer's Estimate 18,600 TON $151.00 $2,808,600.00

A0530 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

Mountain Valley Contracting, Inc. $508.54 $96,622.60 Central Southern Construction Corp. $456.00 $86,640.00 Siete. Inc. $463.00 $87,970.00

SEMA CONSTRUCTION, INC. $500.00 $95,000.00

Steve Manning Construction, Inc $595.00 $113,050.00 Engineer's Estimate 190 TON $360.00 $68,400.00

7 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0570 40601-0000 FOG SEAL

Mountain Valley Contracting, Inc. $624.53 $31,226.50 Central Southern Construction Corp. $560.00 $28,000.00 Siete. Inc. $570.00 $28,500.00

SEMA CONSTRUCTION, INC. $1,000.00 $50,000.00

Steve Manning Construction, Inc $728.00 $36,400.00 Engineer's Estimate 50 TON $950.00 $47,500.00

A0590 40605-0000 BLOTTER

Mountain Valley Contracting, Inc. $162.82 $27,679.40 Central Southern Construction Corp. $170.00 $28,900.00 Siete. Inc. $150.00 $25,500.00

SEMA CONSTRUCTION, INC. $75.00 $12,750.00

Steve Manning Construction, Inc $150.00 $25,500.00 Engineer's Estimate 170 TON $33.00 $5,610.00

A0610 41102-1000 PRIME COAT, METHOD 1

Mountain Valley Contracting, Inc. $1.52 $170,240.00 Central Southern Construction Corp. $1.40 $156,800.00 Siete. Inc. $0.60 $67,200.00

SEMA CONSTRUCTION, INC. $2.25 $252,000.00

Steve Manning Construction, Inc $1.70 $190,400.00 Engineer's Estimate 112,000 SQYD $1.50 $168,000.00

A0630 41201-0000 TACK COAT

Mountain Valley Contracting, Inc. $1,287.93 $64,396.50 Central Southern Construction Corp. $1,155.00 $57,750.00 Siete. Inc. $2,000.00 $100,000.00

SEMA CONSTRUCTION, INC. $1,000.00 $50,000.00

Steve Manning Construction, Inc $1,500.00 $75,000.00 Engineer's Estimate 50 TON $1,000.00 $50,000.00

A0650 60103-0000 CONCRETE, HEADWALL (HEADWALL AND WINGWALLS FOR 12 FEET SPAN X 10 FEET RISE BOX CULVERT)

Mountain Valley Contracting, Inc. $46,274.51 $92,549.02 Central Southern Construction Corp. $50,000.00 $100,000.00 Siete. Inc. $85,000.00 $170,000.00

SEMA CONSTRUCTION, INC. $100,000.00 $200,000.00

Steve Manning Construction, Inc $110,000.00 $220,000.00 Engineer's Estimate 2 EACH $45,000.00 $90,000.00

8 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0670 60103-0000 CONCRETE, HEADWALL (HEADWALL AND WINGWALLS FOR 9 FEET SPAN X 6 FEET RISE BOX CULVERT)

Mountain Valley Contracting, Inc. $29,302.10 $58,604.20 Central Southern Construction Corp. $15,000.00 $30,000.00 Siete. Inc. $75,000.00 $150,000.00

SEMA CONSTRUCTION, INC. $75,000.00 $150,000.00

Steve Manning Construction, Inc $90,000.00 $180,000.00 Engineer's Estimate 2 EACH $25,000.00 $50,000.00

A0690 60103-0260 CONCRETE, HEADWALL FOR 60-INCH PIPE CULVERT

Mountain Valley Contracting, Inc. $9,973.49 $19,946.98 Central Southern Construction Corp. $15,000.00 $30,000.00 Siete. Inc. $65,000.00 $130,000.00

SEMA CONSTRUCTION, INC. $35,000.00 $70,000.00

Steve Manning Construction, Inc $80,000.00 $160,000.00 Engineer's Estimate 2 EACH $18,000.00 $36,000.00

A0710 60201-0600 18-INCH PIPE CULVERT (CONCRETE PIPE)

Mountain Valley Contracting, Inc. $134.09 $9,386.30 Central Southern Construction Corp. $225.00 $15,750.00 Siete. Inc. $300.00 $21,000.00

SEMA CONSTRUCTION, INC. $200.00 $14,000.00

Steve Manning Construction, Inc $380.00 $26,600.00 Engineer's Estimate 70 LNFT $175.00 $12,250.00

A0730 60201-0800 24-INCH PIPE CULVERT (CONCRETE PIPE)

Mountain Valley Contracting, Inc. $175.92 $11,434.80 Central Southern Construction Corp. $260.00 $16,900.00 Siete. Inc. $400.00 $26,000.00

SEMA CONSTRUCTION, INC. $250.00 $16,250.00

Steve Manning Construction, Inc $400.00 $26,000.00 Engineer's Estimate 65 LNFT $240.00 $15,600.00

A0750 60201-1100 42-INCH PIPE CULVERT (CONCRETE PIPE)

Mountain Valley Contracting, Inc. $398.81 $27,916.70 Central Southern Construction Corp. $400.00 $28,000.00 Siete. Inc. $500.00 $35,000.00

SEMA CONSTRUCTION, INC. $400.00 $28,000.00

Steve Manning Construction, Inc $620.00 $43,400.00 Engineer's Estimate 70 LNFT $460.00 $32,200.00

9 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0770 60201-1400 60-INCH PIPE CULVERT (CONCRETE PIPE)

Mountain Valley Contracting, Inc. $647.71 $48,578.25 Central Southern Construction Corp. $550.00 $41,250.00 Siete. Inc. $700.00 $52,500.00

SEMA CONSTRUCTION, INC. $500.00 $37,500.00

Steve Manning Construction, Inc $820.00 $61,500.00 Engineer's Estimate 75 LNFT $600.00 $45,000.00

A0790 60202-0200 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (ELLIPTICAL CONCRETE)

Mountain Valley Contracting, Inc. $288.23 $43,234.50 Central Southern Construction Corp. $350.00 $52,500.00 Siete. Inc. $400.00 $60,000.00

SEMA CONSTRUCTION, INC. $300.00 $45,000.00

Steve Manning Construction, Inc $410.00 $61,500.00 Engineer's Estimate 150 LNFT $250.00 $37,500.00

A0810 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (ELLIPTICAL CONCRETE)

Mountain Valley Contracting, Inc. $332.85 $69,898.50 Central Southern Construction Corp. $395.00 $82,950.00 Siete. Inc. $500.00 $105,000.00

SEMA CONSTRUCTION, INC. $350.00 $73,500.00

Steve Manning Construction, Inc $430.00 $90,300.00 Engineer's Estimate 210 LNFT $260.00 $54,600.00

A0830 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT (CONCRETE)

Mountain Valley Contracting, Inc. $1,516.23 $3,032.46 Central Southern Construction Corp. $3,000.00 $6,000.00 Siete. Inc. $5,000.00 $10,000.00

SEMA CONSTRUCTION, INC. $2,500.00 $5,000.00

Steve Manning Construction, Inc $1,800.00 $3,600.00 Engineer's Estimate 2 EACH $675.00 $1,350.00

A0850 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (CONCRETE)

Mountain Valley Contracting, Inc. $1,875.45 $3,750.90 Central Southern Construction Corp. $3,500.00 $7,000.00 Siete. Inc. $6,000.00 $12,000.00

SEMA CONSTRUCTION, INC. $3,000.00 $6,000.00

Steve Manning Construction, Inc $2,200.00 $4,400.00 Engineer's Estimate 2 EACH $1,050.00 $2,100.00

10 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0870 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT (CONCRETE)

Mountain Valley Contracting, Inc. $4,099.05 $8,198.10 Central Southern Construction Corp. $7,500.00 $15,000.00 Siete. Inc. $7,000.00 $14,000.00

SEMA CONSTRUCTION, INC. $5,000.00 $10,000.00

Steve Manning Construction, Inc $3,900.00 $7,800.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00

A0890 60211-0600 END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (ELLIPTICAL

CONCRETE)

Mountain Valley Contracting, Inc. $1,681.10 $6,724.40 Central Southern Construction Corp. $4,000.00 $16,000.00 Siete. Inc. $5,000.00 $20,000.00

SEMA CONSTRUCTION, INC. $3,500.00 $14,000.00

Steve Manning Construction, Inc $2,300.00 $9,200.00 Engineer's Estimate 4 EACH $2,500.00 $10,000.00

A0910 60211-0800 END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (ELLIPTICAL

CONCRETE)

Mountain Valley Contracting, Inc. $1,825.34 $10,952.04 Central Southern Construction Corp. $4,500.00 $27,000.00 Siete. Inc. $6,000.00 $36,000.00

SEMA CONSTRUCTION, INC. $4,000.00 $24,000.00

Steve Manning Construction, Inc $2,800.00 $16,800.00 Engineer's Estimate 6 EACH $2,000.00 $12,000.00

A0930 60220-2450 9 FEET SPAN, 6 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

Mountain Valley Contracting, Inc. $3,150.98 $239,474.48 Central Southern Construction Corp. $4,000.00 $304,000.00 Siete. Inc. $5,500.00 $418,000.00

SEMA CONSTRUCTION, INC. $3,000.00 $228,000.00

Steve Manning Construction, Inc $2,780.00 $211,280.00 Engineer's Estimate 76 LNFT $3,400.00 $258,400.00

A0950 60220-4150 12 FEET SPAN, 10 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

Mountain Valley Contracting, Inc. $5,018.02 $306,099.22 Central Southern Construction Corp. $6,500.00 $396,500.00 Siete. Inc. $6,500.00 $396,500.00

SEMA CONSTRUCTION, INC. $4,500.00 $274,500.00

Steve Manning Construction, Inc $5,230.00 $319,030.00 Engineer's Estimate 61 LNFT $4,400.00 $268,400.00

11 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0970 61901-0900 FENCE, BARBED WIRE, 4 STRAND

Mountain Valley Contracting, Inc. $5.58 $37,330.20 Central Southern Construction Corp. $10.00 $66,900.00 Siete. Inc. $8.00 $53,520.00

SEMA CONSTRUCTION, INC. $5.50 $36,795.00

Steve Manning Construction, Inc $26.00 $173,940.00 Engineer's Estimate 6,690 LNFT $15.00 $100,350.00

A0990 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Mountain Valley Contracting, Inc. $162.06 $12,964.80 Central Southern Construction Corp. $200.00 $16,000.00 Siete. Inc. $135.00 $10,800.00

SEMA CONSTRUCTION, INC. $150.00 $12,000.00

Steve Manning Construction, Inc $200.00 $16,000.00 Engineer's Estimate 80 HOUR $130.00 $10,400.00

A1010 62201-0350 BACKHOE

Mountain Valley Contracting, Inc. $135.16 $10,812.80 Central Southern Construction Corp. $200.00 $16,000.00 Siete. Inc. $130.00 $10,400.00

SEMA CONSTRUCTION, INC. $250.00 $20,000.00

Steve Manning Construction, Inc $220.00 $17,600.00 Engineer's Estimate 80 HOUR $160.00 $12,800.00

A1030 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY

Mountain Valley Contracting, Inc. $176.90 $7,076.00 Central Southern Construction Corp. $200.00 $8,000.00 Siete. Inc. $180.00 $7,200.00

SEMA CONSTRUCTION, INC. $250.00 $10,000.00

Steve Manning Construction, Inc $220.00 $8,800.00 Engineer's Estimate 40 HOUR $270.00 $10,800.00

A1050 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Mountain Valley Contracting, Inc. $294.33 $23,546.40 Central Southern Construction Corp. $250.00 $20,000.00 Siete. Inc. $196.00 $15,680.00

SEMA CONSTRUCTION, INC. $250.00 $20,000.00

Steve Manning Construction, Inc $280.00 $22,400.00 Engineer's Estimate 80 HOUR $205.00 $16,400.00

12 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1070 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY

Mountain Valley Contracting, Inc. $206.41 $8,256.40 Central Southern Construction Corp. $250.00 $10,000.00 Siete. Inc. $228.00 $9,120.00

SEMA CONSTRUCTION, INC. $400.00 $16,000.00

Steve Manning Construction, Inc $250.00 $10,000.00 Engineer's Estimate 40 HOUR $240.00 $9,600.00

A1090 62301-0000 GENERAL LABOR

Mountain Valley Contracting, Inc. $51.70 $4,136.00 Central Southern Construction Corp. $50.00 $4,000.00 Siete. Inc. $60.00 $4,800.00

SEMA CONSTRUCTION, INC. $60.00 $4,800.00

Steve Manning Construction, Inc $110.00 $8,800.00 Engineer's Estimate 80 HOUR $80.00 $6,400.00

A1110 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Mountain Valley Contracting, Inc. $178.44 $7,137.60 Central Southern Construction Corp. $250.00 $10,000.00 Siete. Inc. $165.00 $6,600.00

SEMA CONSTRUCTION, INC. $160.00 $6,400.00

Steve Manning Construction, Inc $300.00 $12,000.00 Engineer's Estimate 40 HOUR $210.00 $8,400.00

A1130 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Mountain Valley Contracting, Inc. $178.44 $7,137.60 Central Southern Construction Corp. $350.00 $14,000.00 Siete. Inc. $165.00 $6,600.00

SEMA CONSTRUCTION, INC. $250.00 $10,000.00

Steve Manning Construction, Inc $410.00 $16,400.00 Engineer's Estimate 40 HOUR $190.00 $7,600.00

A1150 62406-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH

Mountain Valley Contracting, Inc. $2,359.27 $49,544.67 Central Southern Construction Corp. $10,000.00 $210,000.00 Siete. Inc. $1,000.00 $21,000.00

SEMA CONSTRUCTION, INC. $3,500.00 $73,500.00

Steve Manning Construction, Inc $16,110.00 $338,310.00 Engineer's Estimate 21.0 ACRE $6,300.00 $132,300.00

13 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1170 62510-2000 SEEDING, HYDRAULIC METHOD

Mountain Valley Contracting, Inc. $2,043.64 $42,916.44 Central Southern Construction Corp. $4,000.00 $84,000.00 Siete. Inc. $1,500.00 $31,500.00

SEMA CONSTRUCTION, INC. $2,000.00 $42,000.00

Steve Manning Construction, Inc $1,380.00 $28,980.00 Engineer's Estimate 21.0 ACRE $1,500.00 $31,500.00

A1190 62515-2000 MULCHING, HYDRAULIC METHOD

Mountain Valley Contracting, Inc. $2,582.26 $54,227.46 Central Southern Construction Corp. $2,500.00 $52,500.00 Siete. Inc. $2,000.00 $42,000.00

SEMA CONSTRUCTION, INC. $2,500.00 $52,500.00

Steve Manning Construction, Inc $2,780.00 $58,380.00 Engineer's Estimate 21.0 ACRE $2,200.00 $46,200.00

A1210 63301-0000 SIGN SYSTEM

Mountain Valley Contracting, Inc. $585.49 $29,274.50 Central Southern Construction Corp. $600.00 $30,000.00 Siete. Inc. $525.00 $26,250.00

SEMA CONSTRUCTION, INC. $600.00 $30,000.00

Steve Manning Construction, Inc $1,750.00 $87,500.00 Engineer's Estimate 50 EACH $1,000.00 $50,000.00

A1230 63308-2000 OBJECT MARKER, TYPE 2

Mountain Valley Contracting, Inc. $273.23 $6,830.75 Central Southern Construction Corp. $300.00 $7,500.00 Siete. Inc. $245.00 $6,125.00

SEMA CONSTRUCTION, INC. $300.00 $7,500.00

Steve Manning Construction, Inc $150.00 $3,750.00 Engineer's Estimate 25 EACH $65.00 $1,625.00

A1250 63309-0000 DELINEATOR

Mountain Valley Contracting, Inc. $46.84 $27,167.20 Central Southern Construction Corp. $60.00 $34,800.00 Siete. Inc. $42.00 $24,360.00

SEMA CONSTRUCTION, INC. $45.00 $26,100.00

Steve Manning Construction, Inc $120.00 $69,600.00 Engineer's Estimate 580 EACH $60.00 $34,800.00

14 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1270 63316-1000 REMOVE AND RESET SIGN

Mountain Valley Contracting, Inc. $446.09 $2,230.45 Central Southern Construction Corp. $500.00 $2,500.00 Siete. Inc. $400.00 $2,000.00

SEMA CONSTRUCTION, INC. $500.00 $2,500.00

Steve Manning Construction, Inc $900.00 $4,500.00 Engineer's Estimate 5 EACH $1,000.00 $5,000.00

A1290 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Mountain Valley Contracting, Inc. $3,238.62 $208,890.99 Central Southern Construction Corp. $1,300.00 $83,850.00 Siete. Inc. $3,500.00 $225,750.00

SEMA CONSTRUCTION, INC. $3,200.00 $206,400.00

Steve Manning Construction, Inc $1,900.00 $122,550.00 Engineer's Estimate 64.5 MILE $3,000.00 $193,500.00

A1310 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

Mountain Valley Contracting, Inc. $1,889.20 $9,446.00 Central Southern Construction Corp. $500.00 $2,500.00 Siete. Inc. $3,600.00 $18,000.00

SEMA CONSTRUCTION, INC. $2,000.00 $10,000.00

Steve Manning Construction, Inc $1,900.00 $9,500.00 Engineer's Estimate 5.0 MILE $1,000.00 $5,000.00

A1330 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM

Mountain Valley Contracting, Inc. Lump Sum $50,185.28 Central Southern Construction Corp. Lump Sum $50,000.00 Siete. Inc. Lump Sum $50,000.00 SEMA CONSTRUCTION, INC. Lump Sum $50,000.00 Steve Manning Construction, Inc Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

A1350 63501-3500 TEMPORARY TRAFFIC CONTROL, PUBLIC INFORMATION PROGRAM

Mountain Valley Contracting, Inc. Lump Sum $355,445.60 Central Southern Construction Corp. Lump Sum $50,000.00 Siete. Inc. Lump Sum $10,000.00 SEMA CONSTRUCTION, INC. Lump Sum $10,000.00 Steve Manning Construction, Inc Lump Sum $12,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

15 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1370 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Mountain Valley Contracting, Inc. $557.61 $2,230.44 Central Southern Construction Corp. $1,000.00 $4,000.00 Siete. Inc. $550.00 $2,200.00

SEMA CONSTRUCTION, INC. $600.00 $2,400.00

Steve Manning Construction, Inc $200.00 $800.00 Engineer's Estimate 4 EACH $340.00 $1,360.00

A1390 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER

Mountain Valley Contracting, Inc. $55.76 $11,152.00 Central Southern Construction Corp. $60.00 $12,000.00 Siete. Inc. $10.00 $2,000.00

SEMA CONSTRUCTION, INC. $45.00 $9,000.00

Steve Manning Construction, Inc $60.00 $12,000.00 Engineer's Estimate 200 EACH $35.00 $7,000.00

A1410 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Mountain Valley Contracting, Inc. $55.76 $5,910.56 Central Southern Construction Corp. $60.00 $6,360.00 Siete. Inc. $45.00 $4,770.00

SEMA CONSTRUCTION, INC. $50.00 $5,300.00

Steve Manning Construction, Inc $120.00 $12,720.00 Engineer's Estimate 106 EACH $100.00 $10,600.00

A1430 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

Mountain Valley Contracting, Inc. $55.76 $223.04 Central Southern Construction Corp. $100.00 $400.00 Siete. Inc. $60.00 $240.00

SEMA CONSTRUCTION, INC. $65.00 $260.00

Steve Manning Construction, Inc $800.00 $3,200.00 Engineer's Estimate 4 EACH $250.00 $1,000.00

A1450 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

Mountain Valley Contracting, Inc. $223.05 $446.10 Central Southern Construction Corp. $1,000.00 $2,000.00 Siete. Inc. $800.00 $1,600.00

SEMA CONSTRUCTION, INC. $850.00 $1,700.00

Steve Manning Construction, Inc $100.00 $200.00 Engineer's Estimate 2 EACH $250.00 $500.00

16 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1470 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

Mountain Valley Contracting, Inc. $55.76 $5,576.00 Central Southern Construction Corp. $100.00 $10,000.00 Siete. Inc. $60.00 $6,000.00

SEMA CONSTRUCTION, INC. $65.00 $6,500.00

Steve Manning Construction, Inc $100.00 $10,000.00 Engineer's Estimate 100 EACH $50.00 $5,000.00

A1490 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Mountain Valley Contracting, Inc. $16,728.43 $33,456.86 Central Southern Construction Corp. $20,000.00 $40,000.00 Siete. Inc. $20,000.00 $40,000.00

SEMA CONSTRUCTION, INC. $20,000.00 $40,000.00

Steve Manning Construction, Inc $8,200.00 $16,400.00 Engineer's Estimate 2 EACH $24,000.00 $48,000.00

A1510 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN (Bipartisan Infrastructure Law Sign)

Mountain Valley Contracting, Inc. $1,672.84 $1,672.84 Central Southern Construction Corp. $2,000.00 $2,000.00 Siete. Inc. $10,000.00 $10,000.00

SEMA CONSTRUCTION, INC. $2,000.00 $2,000.00

Steve Manning Construction, Inc $2,200.00 $2,200.00 Engineer's Estimate 1 EACH $1,000.00 $1,000.00

A1530 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Mountain Valley Contracting, Inc. $178.44 $10,706.40 Central Southern Construction Corp. $100.00 $6,000.00 Siete. Inc. $90.00 $5,400.00

SEMA CONSTRUCTION, INC. $100.00 $6,000.00

Steve Manning Construction, Inc $420.00 $25,200.00 Engineer's Estimate 60 EACH $75.00 $4,500.00

A1550 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Mountain Valley Contracting, Inc. $42.38 $156,806.00 Central Southern Construction Corp. $40.00 $148,000.00 Siete. Inc. $40.00 $148,000.00

SEMA CONSTRUCTION, INC. $45.00 $166,500.00

Steve Manning Construction, Inc $90.00 $333,000.00 Engineer's Estimate 3,700 HOUR $65.00 $240,500.00

17 out of 17

Project No: CO FLAP MES18(1)

Project Name: 18 Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1570 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Mountain Valley Contracting, Inc. $55.76 $105,944.00 Central Southern Construction Corp. $85.00 $161,500.00 Siete. Inc. $85.00 $161,500.00

SEMA CONSTRUCTION, INC. $100.00 $190,000.00

Steve Manning Construction, Inc $120.00 $228,000.00 Engineer's Estimate 1,900 HOUR $95.00 $180,500.00

Total Schedule - All Items

Mountain Valley Contracting, Inc. $11,108,061.65 Central Southern Construction Corp. $11,985,532.00 Siete. Inc. $12,822,963.00

SEMA CONSTRUCTION, INC. $13,095,991.00

Steve Manning Construction, Inc $13,696,832.00 Engineer's Estimate $12,929,664.00