This document contains Questions and Answers (Q&A) related to the federal contract opportunity for the CO FLAP MES 18(1) 18 Road project.

The Q&A addresses several details about the project, including clarifications on the quantity of fencing, the allowed length of T-posts, and the lack of specified quantities for end and corner braces. The agency has issued an Addendum 001 to update the notes and quantities. The project scope includes reconstruction of approximately six miles of 18 Road in Mesa County, Colorado, with work such as earthwork, grading, placement of aggregate base and asphalt concrete pavement, drainage improvements, fence removal and replacement, signing, striping, and revegetation. The estimated cost range for the project is between $10,000,000 and $20,000,000, and it is available for full and open competition.

View the file

Other files for this federal contract opportunity

Other files attached to CO FLAP MES 18(1) 18 Road, newest first.
File Type Posted
Bid Tabulation.pdf PDF
Bid Opening Summary.pdf PDF
QnA 8.19.24.pdf PDF
A003.pdf PDF
A002.pdf PDF
QnA 8.15.24.pdf PDF
QnA 8.8.24.pdf PDF
A001.pdf PDF
CO FLAP MES 18(1) 18 Road Final Hydraulics Report with Addendum.pdf PDF
Pavement Report CO FLAP MES 18(1) 18 Road 20240613.pdf PDF
CO FLAP MES18(1) Plans Final - 06_20_2024.pdf PDF
6982AF24B000013.pdf PDF
CO FLAP MES18(1) Cross Sections Final - 06_20_2024.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for CO FLAP MES 18(1) 18 Road

August 1, 2024

Questions Answers 1 After adding up all the fence they have I am coming up with

11,045' Almost twice as much as the bid quantity. Do we know why?

Addendum 001 updates notes and quantities to correct and clarify.

2 They want 76'' T-posts according to the detail. 72'' posts would give them 30'' in the ground. 2' in ground is the CDOT Standard.

Is 30'' adequate?

Addendum 001 updates to allow 72” post length with 30” embedment.

3 They show gates on the detail but I don't see gates on the plans or Bid Tab. Am I missing them?

No gates are being replaced as part of the project.

4 They don't have quantities for End and Corner Braces. This leaves a lot to interpretation as far as the overall price of the estimate.

Would they be willing to give a estimate on brace quantities?

Design and locations of brace and corner posts are not quantified or identified in the plans.

File details come from the government source that posted it. Updated .