Chickamauga Lock Chamber Replacement
Award Notice Posted
- Solicitation number
- W912P5-17-B-0001
- Agency
-
ENDIST Nashville
US Army Corps of Engineers, Department of Defense
- Awarded
- to Shimmick Construction Company, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912P517C0007 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Chickamauga Lock Resident Engineer Office 5518 Trailhead Drive Chattanooga, Tennessee 37415, United States
Notice details come from SAM.gov. Updated .
Notice text
7 versions
Update #7 · Latest ·
Added: Jul 11, 2017 6:57 pm
Modified: Aug 24, 2017 4:48 pmTrack Changes
Amendment 0001 adds the Site Visit Rosters and the Site Visit Presentation to the IFB package on the FBO website; adds Wage Determinations for the Muscle Shoals storage site and a revised Wage Determination for the chamber site; adds CAD drawings for the Lock Chamber; adds Geotechnical Data (Appendix B to Tech Specs); adds FIO & As-Built drawings associated with previous contracts for the cofferdam, chamber excavation, approach wall, & GFP components; makes corrections to previously published drawings and specifications; revises the Bid Schedule; and publishes preliminary Q&A to the solicitation. The amendment also changes the deadline for all questions related to the IFB, Plans, Specifications, and initial site visits to 11:00 AM Central, 25 Jul 2017.
See Package #1 attachments for documents described above, except for CAD drawing zip files which are located in Amendment #1 attachments.
Amendment 0002 replaces the Bid Schedule; replaces Technical Specifications Section 01 22 00 entirely; replaces Technical Specifications Section 03 30 01 pages 25 through 30; and publishes the second set of Q&A to the solicitation. The amendment also extends the date for receipt of bids to 31 August 2017, 10:00 Central Time. See attachments for documents described above.
Amendment 0003 revises the Option table in FAR Clause 52.211-10; adds supporting files to the solicitation; replaces the Bid Schedule; removes and replaces Technical Specifications Sections or pages; replaces or revises Contract Drawings; and publishes the third set of Q&A to the solicitation. See attachments for documents described above.
Amendment 0004 removes and replaces pages 9 and 10 of Section 40 95 00 in the Technical Specifications; and adds new drawings to the set of Contract Drawings (see DFARS Clause 252.236-7001, contained in the Amendment). This Amendment also removes the following FAR Clauses associated with Executive Order 13673 from the solicitation (Section 00700) IAW Public Law 115-11: 52.222-59 Compliance with Labor Laws; 52.222-60 Paycheck Transparency; and 52.222-61 Arbitration of Contractor Employee Claims.
Amendment 0005 adds Question #294 to the Q&A; revises paragraph 1.3 in the Instructions to Bidders; corrects the Bid Schedule for Option #4 quantity of CLIN 0306-04 Segmental Cofferdam Dowels to 1,840; removes and replaces page 24 of Section 03 30 01 in the Technical Specifications; and updates Wage Determination TN146.
Update #6 ·
Added: Jul 11, 2017 6:57 pm
Modified: Aug 14, 2017 11:03 amTrack Changes
Amendment 0001 adds the Site Visit Rosters and the Site Visit Presentation to the IFB package on the FBO website; adds Wage Determinations for the Muscle Shoals storage site and a revised Wage Determination for the chamber site; adds CAD drawings for the Lock Chamber; adds Geotechnical Data (Appendix B to Tech Specs); adds FIO & As-Built drawings associated with previous contracts for the cofferdam, chamber excavation, approach wall, & GFP components; makes corrections to previously published drawings and specifications; revises the Bid Schedule; and publishes preliminary Q&A to the solicitation. The amendment also changes the deadline for all questions related to the IFB, Plans, Specifications, and initial site visits to 11:00 AM Central, 25 Jul 2017.
See Package #1 attachments for documents described above, except for CAD drawing zip files which are located in Amendment #1 attachments.
Amendment 0002 replaces the Bid Schedule; replaces Technical Specifications Section 01 22 00 entirely; replaces Technical Specifications Section 03 30 01 pages 25 through 30; and publishes the second set of Q&A to the solicitation. The amendment also extends the date for receipt of bids to 31 August 2017, 10:00 Central Time. See attachments for documents described above.
Amendment 0003 revises the Option table in FAR Clause 52.211-10; adds supporting files to the solicitation; replaces the Bid Schedule; removes and replaces Technical Specifications Sections or pages; replaces or revises Contract Drawings; and publishes the third set of Q&A to the solicitation. See attachments for documents described above.
Amendment 0004 removes and replaces pages 9 and 10 of Section 40 95 00 in the Technical Specifications; and adds new drawings to the set of Contract Drawings (see DFARS Clause 252.236-7001, contained in the Amendment). This Amendment also removes the following FAR Clauses associated with Executive Order 13673 from the solicitation (Section 00700) IAW Public Law 115-11: 52.222-59 Compliance with Labor Laws; 52.222-60 Paycheck Transparency; and 52.222-61 Arbitration of Contractor Employee Claims.
Update #5 ·
Added: Jul 11, 2017 6:57 pm
Modified: Aug 08, 2017 2:17 pmTrack Changes
Amendment 0001 adds the Site Visit Rosters and the Site Visit Presentation to the IFB package on the FBO website; adds Wage Determinations for the Muscle Shoals storage site and a revised Wage Determination for the chamber site; adds CAD drawings for the Lock Chamber; adds Geotechnical Data (Appendix B to Tech Specs); adds FIO & As-Built drawings associated with previous contracts for the cofferdam, chamber excavation, approach wall, & GFP components; makes corrections to previously published drawings and specifications; revises the Bid Schedule; and publishes preliminary Q&A to the solicitation. The amendment also changes the deadline for all questions related to the IFB, Plans, Specifications, and initial site visits to 11:00 AM Central, 25 Jul 2017.
See Package #1 attachments for documents described above, except for CAD drawing zip files which are located in Amendment #1 attachments.
Amendment 0002 replaces the Bid Schedule; replaces Technical Specifications Section 01 22 00 entirely; replaces Technical Specifications Section 03 30 01 pages 25 through 30; and publishes the second set of Q&A to the solicitation. The amendment also extends the date for receipt of bids to 31 August 2017, 10:00 Central Time. See attachments for documents described above.
Amendment 0003 revises the Option table in FAR Clause 52.211-10; adds supporting files to the solicitation; replaces the Bid Schedule; removes and replaces Technical Specifications Sections or pages; replaces or revises Contract Drawings; and publishes the third set of Q&A to the solicitation. See attachments for documents described above.
Update #4 ·
Added: Jun 02, 2017 3:45 pm Modified: Jul 28, 2017 9:30 amTrack Changes
The Chickamauga Lock Chamber Replacement project consists of the following construction activities:
1) Construction of an on-site batch plant and concrete conveyance and testing facilities.
2) Excavation of approximately 9,900 CY of rock and demolition of approximately 3,600 CY of existing heavily reinforced concrete spillway (to be disposed of in an offsite disposal area) including 3,000 LF of pre-splitting, 13,700 LF of line drilling, installation of rock bolts and shotcrete placements.
3) Land based installation of approximately 43 reinforced concrete drilled shafts that are approximately 54 to 74 inches in diameter ranging up to approximately 46 feet long.
4) Approximately 10,000 CY of dental excavation (offsite disposal) and placement of dental concrete and 19,315 SY of rock foundation preparations for placement of approximately 285,068 CY of concrete in the construction of monoliths for the new 600 ft. long lock including 6,936 Tons of deformed steel bars.
5) Installation of a chamber grout curtain.
6) Installation of 361 tons of embedded and misc. metals.
7) Transportation, handling, and installation of Government furnished miter gates sections, culvert valves, and other appurtenant items.
8) Construction of a new 6,633 SF Operations building and gate operation control shelters.
9) Installation of electrical and mechanical systems to support the lock and operation building.
10) Drilling, installation, and water tightness grouting and testing of 16 vertical 52-strand post tensioned anchors averaging 177 feet in length (this work will involve drilling through concrete and limestone);
11) Operation and maintenance of an automated instrumentation system comprised of bi-axial tilt meters, piezometers, etc. with associated data loggers and cell phone transmission system.
12) Commissioning of a new lock.
Added: Jul 11, 2017 6:57 pm
Modified: Jul 28, 2017 9:30 amTrack Changes
Amendment 0001 adds the Site Visit Rosters and the Site Visit Presentation to the IFB package on the FBO website; adds Wage Determinations for the Muscle Shoals storage site and a revised Wage Determination for the chamber site; adds CAD drawings for the Lock Chamber; adds Geotechnical Data (Appendix B to Tech Specs); adds FIO & As-Built drawings associated with previous contracts for the cofferdam, chamber excavation, approach wall, & GFP components; makes corrections to previously published drawings and specifications; revises the Bid Schedule; and publishes preliminary Q&A to the solicitation. The amendment also changes the deadline for all questions related to the IFB, Plans, Specifications, and initial site visits to 11:00 AM Central, 25 Jul 2017.
See Package #1 attachments for documents described above, except for CAD drawing zip files which are located in Amendment #1 attachments.
Amendment 0002 replaces the Bid Schedule; replaces Technical Specifications Section 01 22 00 entirely; replaces Technical Specifications Section 03 30 01 pages 25 through 30; and publishes the second set of Q&A to the solicitation. The amendment also extends the date for receipt of bids to 31 August 2017, 10:00 Central Time. See attachments for documents described above.
Update #3 ·
Added: Jul 11, 2017 6:57 pm
Amendment 0001 adds the Site Visit Rosters and the Site Visit Presentation to the IFB package on the FBO website; adds Wage Determinations for the Muscle Shoals storage site and a revised Wage Determination for the chamber site; adds CAD drawings for the Lock Chamber; adds Geotechnical Data (Appendix B to Tech Specs); adds FIO & As-Built drawings associated with previous contracts for the cofferdam, chamber excavation, approach wall, & GFP components; makes corrections to previously published drawings and specifications; revises the Bid Schedule; and publishes preliminary Q&A to the solicitation. The amendment also changes the deadline for all questions related to the IFB, Plans, Specifications, and initial site visits to 11:00 AM Central, 25 Jul 2017.
See Package #1 attachments for documents described above, except for CAD drawing zip files which are located in Amendment #1 attachments.
Update #2 ·
Added: Jun 02, 2017 3:45 pm Modified: Jun 19, 2017 5:06 pmTrack Changes
The Chickamauga Lock Chamber Replacement project consists of the following construction activities:
1) Construction of an on-site batch plant and concrete conveyance and testing facilities.
2) Excavation of approximately 9,900 CY of rock and demolition of approximately 3,600 CY of existing heavily reinforced concrete spillway (to be disposed of in an offsite disposal area) including 3,000 LF of pre-splitting, 13,700 LF of line drilling, installation of rock bolts and shotcrete placements.
3) Land based installation of approximately 43 reinforced concrete drilled shafts that are approximately 54 to 74 inches in diameter ranging up to approximately 46 feet long.
4) Approximately 10,000 CY of dental excavation (offsite disposal) and placement of dental concrete and 19,315 SY of rock foundation preparations for placement of approximately 285,068 CY of concrete in the construction of monoliths for the new 600 ft. long lock including 6,936 Tons of deformed steel bars.
5) Installation of a chamber grout curtain.
6) Installation of 361 tons of embedded and misc. metals.
7) Transportation, handling, and installation of Government furnished miter gates sections, culvert valves, and other appurtenant items.
8) Construction of a new 6,633 SF Operations building and gate operation control shelters.
9) Installation of electrical and mechanical systems to support the lock and operation building.
10) Drilling, installation, and water tightness grouting and testing of 16 vertical 52-strand post tensioned anchors averaging 177 feet in length (this work will involve drilling through concrete and limestone);
11) Operation and maintenance of an automated instrumentation system comprised of bi-axial tilt meters, piezometers, etc. with associated data loggers and cell phone transmission system.
12) Commissioning of a new lock.
Three site visits for three distinct locations have been arranged to aid in preparation of offerors'
bids:
(a) An organized site visit has been scheduled for the lock chamber site--
27 June 2017, 9:00 AM - 12:00 PM local time (Eastern Daylight Savings Time)
Participants will meet at--
TVA Chickamauga Power House
Chattanooga, TN 37415
Coordinates: 35°06'06.4"N 85°13'43.4"W
Google Map Link: https://www.google.com/maps/place/35%C2%B006'06.4%22N+85%C2%B013'43.4%22W/@35.101782,-85.2292675,203m/data=!3m2!1e3!4b1!4m5!3m4!1s0x0:0x0!8m2!3d35.101782!4d-85.228719
(b) An organized site visit has been scheduled for the Government Furnished Material storage site--
28 June 2017, 9:30 - 11:30 AM local time (Central Daylight Savings Time)
Participants will meet at--
TVA River Ops Storage Area
Muscle Shoals, AL
Coordinates of the Muscle Shoals parking lot meeting location:
34 46' 58.7"N 87 37'24.2"W
Google Map Link: https://www.google.com/maps/search/34%C2%B046'58.7%22N+87%C2%B037'24.2%22W?sa=X&ved=0ahUKEwilh4efiZjUAhVIbSYKHW-zDlUQ8gEIJTAA
(c) An organized site visit has been scheduled for the core samples storage site--
29 June 2017, 9:00 AM - 11:00 AM local time (Central Daylight Savings Time)
Participants will meet at--
U.S. Army Corps of Engineers
Regulatory Branch
3701 Bell Road
Nashville, TN 37214-2660
(d) All participants are required to have personal protective equipment, i.e. hard hat, safety glasses, reflective vests, and steel-toed shoes before entering sites (a) and (b) above. Contractors who do not have these items present at the Site Visit may not be able to participate in the visit.
SITE VISIT REGISTRATION:
Contractors and/or potential contractors wishing to attend a pre-bid meeting held at or in a TVA restricted/controlled areas (such as a Power Plant or Dam) shall submit a Nashville District (LRN) Security Access Form to the Contract Specialist ten (10) days prior to the site visit or meeting. If submitting the document in less than ten days, the Offeror may not receive approval for participation. The Contract Specialist will notify the Contractor if the request is approval or denied. Any pre-bid meeting which will cover anything other than public domain information shall be limited to US Citizens, except under unique circumstances. The Security Access Form and guidance is available at http://www.lrn.usace.army.mil/BusinessWithUs/Contracting/ContractSecurityRequirements
U.S. CITIZENS: The Offeror shall submit a Nashville District Corps of Engineers U.S. Citizen Pre-Bid and/or Site Visit Request Form to the LRN Point of Contact, Contract Specialist J.W. Purcell, no later than ten (10) days prior to the site visit. If submitting the document in less than ten days, the Offeror may not receive approval for participation. The LRN POC will notify the individual(s) if the request is approved or denied. The Security Access Form and guidance is available as a pdf attachment on www.fbo.gov with this solicitation and is titled Pre-Bid Meeting and/or Site Visit Request Form.
FOREIGN NATIONALS (FNs): All non-U.S. Citizens, including permanent residents wishing to attend the site visit must be approved in advance. FNs wishing to attend a site visit shall submit a completed Nashville District Corps of Engineers Foreign National Pre-Bid Meeting Request Form and legible color copies of two of the following documents: Passport (unexpired or expired), Certificate of U.S. Citizenship (INS Form N-560 04 N-561), Certificate of Naturalization (INS Form N-550 or N-570), unexpired foreign Passport with I-551 stamp or attached INS Form I-94 indicating unexpired employment authorization, an Alien Registration Receipt Card with photo (INS Form I-151 or I-551), unexpired Temporary Resident Card (INS Form I-688), unexpired Employment Authorization Card (INS Form I-688A), unexpired Reentry Permit (INS Form I-327), unexpired Refugee Travel Document (INS Form I-571), or unexpired Employment Authorization Documentation issued by the INS which contains a photograph (INS Form I-688B) to the LRN Point of Contact, Contract Specialist J.W.Purcell, who will forward the documents to the LRN-SM mailbox (dll-celrn-sm@usace.army.mil) for approval. These documents must be submitted seventeen (17) days prior to the site visit. FN requests require approval at the Headquarters U.S. Army Corps of Engineers (HQUSACE) level. Exceptions will be considered on a case by case basis but will be limited. The form is available as a pdf attachment on www.fbo.gov with this solicitation and is titled Foreign National Pre-Bid Meeting Request Form.
POINT-OF-CONTACT: For questions and /or concerns regarding the site visit, please contact Contract Specialist J.W. Purcell via email at the address referenced above.
This will be the only site visits for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel and time restrictions.
Update #1 ·
Added: Jun 02, 2017 3:45 pm
This is a Pre-Solicitation notice, the full solicitation with all drawings and specifications is expected to be published on or about 17 June 2017.
The Chickamauga Lock Chamber Replacement project consists of the following construction activities:
1) Construction of an on-site batch plant and concrete conveyance and testing facilities.
2) Excavation of approximately 9,900 CY of rock and demolition of approximately 3,600 CY of existing heavily reinforced concrete spillway (to be disposed of in an offsite disposal area) including 3,000 LF of pre-splitting, 13,700 LF of line drilling, installation of rock bolts and shotcrete placements.
3) Land based installation of approximately 43 reinforced concrete drilled shafts that are approximately 54 to 74 inches in diameter ranging up to approximately 46 feet long.
4) Approximately 10,000 CY of dental excavation (offsite disposal) and placement of dental concrete and 19,315 SY of rock foundation preparations for placement of approximately 285,068 CY of concrete in the construction of monoliths for the new 600 ft. long lock including 6,936 Tons of deformed steel bars.
5) Installation of a chamber grout curtain.
6) Installation of 361 tons of embedded and misc. metals.
7) Transportation, handling, and installation of Government furnished miter gates sections, culvert valves, and other appurtenant items.
8) Construction of a new 6,633 SF Operations building and gate operation control shelters.
9) Installation of electrical and mechanical systems to support the lock and operation building.
10) Drilling, installation, and water tightness grouting and testing of 16 vertical 52-strand post tensioned anchors averaging 177 feet in length (this work will involve drilling through concrete and limestone);
11) Operation and maintenance of an automated instrumentation system comprised of bi-axial tilt meters, piezometers, etc. with associated data loggers and cell phone transmission system.
12) Commissioning of a new lock.
Three site visits for three distinct locations have been arranged to aid in preparation of offerors'
bids:
(a) An organized site visit has been scheduled for the lock chamber site--
27 June 2017, 8:00 AM - 12:30 PM local time (Eastern Daylight Savings Time)
Participants will meet at--
TVA Chickamauga Power House
Chattanooga, TN 37415
Coordinates: 35°06'06.4"N 85°13'43.4"W
Google Map Link: https://www.google.com/maps/place/35%C2%B006'06.4%22N+85%C2%B013'43.4%22W/@35.101782,-85.2292675,203m/data=!3m2!1e3!4b1!4m5!3m4!1s0x0:0x0!8m2!3d35.101782!4d-85.228719
(b) An organized site visit has been scheduled for the Government Furnished Material storage site--
28 June 2017, 9:30 - 11:30 AM local time (Central Daylight Savings Time)
Participants will meet at--
USACE, Wilson Lock Operations Building
704 South Wilson Dam Road
Florence, AL 35630-2010
Google Map Link: https://www.google.com/maps/search/34%C2%B046'58.7%22N+87%C2%B037'24.2%22W?sa=X&ved=0ahUKEwilh4efiZjUAhVIbSYKHW-zDlUQ8gEIJTAA
(c) An organized site visit has been scheduled for the core samples storage site--
29 June 2017, 9:00 AM - 11:00 AM local time (Central Daylight Savings Time)
Participants will meet at--
U.S. Army Corps of Engineers
Regulatory Branch
3701 Bell Road
Nashville, TN 37214-2660
(d) All participants are required to have personal protective equipment, i.e. hard hat, safety glasses, reflective vests, and steel-toed shoes before entering sites (a) and (b) above. Contractors who do not have these items present at the Site Visit may not be able to participate in the visit.
SITE VISIT REGISTRATION:
Contractors and/or potential contractors wishing to attend a pre-bid meeting held at or in a TVA restricted/controlled areas (such as a Power Plant or Dam) shall submit a Nashville District (LRN) Security Access Form to the Contract Specialist ten (10) days prior to the site visit or meeting. If submitting the document in less than ten days, the Offeror may not receive approval for participation. The Contract Specialist will notify the Contractor if the request is approval or denied. Any pre-bid meeting which will cover anything other than public domain information shall be limited to US Citizens, except under unique circumstances. The Security Access Form and guidance is available at http://www.lrn.usace.army.mil/BusinessWithUs/Contracting/ContractSecurityRequirements
U.S. CITIZENS: The Offeror shall submit a Nashville District Corps of Engineers U.S. Citizen Pre-Bid and/or Site Visit Request Form to the LRN Point of Contact, Contract Specialist J.W. Purcell, no later than ten (10) days prior to the site visit. If submitting the document in less than ten days, the Offeror may not receive approval for participation. The LRN POC will notify the individual(s) if the request is approved or denied. The Security Access Form and guidance is available as a pdf attachment on www.fbo.gov with this solicitation and is titled Pre-Bid Meeting and/or Site Visit Request Form.
FOREIGN NATIONALS (FNs): All non-U.S. Citizens, including permanent residents wishing to attend the site visit must be approved in advance. FNs wishing to attend a site visit shall submit a completed Nashville District Corps of Engineers Foreign National Pre-Bid Meeting Request Form and legible color copies of two of the following documents: Passport (unexpired or expired), Certificate of U.S. Citizenship (INS Form N-560 04 N-561), Certificate of Naturalization (INS Form N-550 or N-570), unexpired foreign Passport with I-551 stamp or attached INS Form I-94 indicating unexpired employment authorization, an Alien Registration Receipt Card with photo (INS Form I-151 or I-551), unexpired Temporary Resident Card (INS Form I-688), unexpired Employment Authorization Card (INS Form I-688A), unexpired Reentry Permit (INS Form I-327), unexpired Refugee Travel Document (INS Form I-571), or unexpired Employment Authorization Documentation issued by the INS which contains a photograph (INS Form I-688B) to the LRN Point of Contact, Contract Specialist J.W.Purcell, who will forward the documents to the LRN-SM mailbox (dll-celrn-sm@usace.army.mil) for approval. These documents must be submitted seventeen (17) days prior to the site visit. FN requests require approval at the Headquarters U.S. Army Corps of Engineers (HQUSACE) level. Exceptions will be considered on a case by case basis but will be limited. The form is available as a pdf attachment on www.fbo.gov with this solicitation and is titled Foreign National Pre-Bid Meeting Request Form.
POINT-OF-CONTACT: For questions and /or concerns regarding the site visit, please contact Contract Specialist J.W. Purcell via email at the address referenced above.
This will be the only site visits for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel and time restrictions.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| Chickamauga Lock Chamber Replacement | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity