W912P5-17-B-0001-0001.pdf

PDF 445 KB Posted

Attached to
Chickamauga Lock Chamber Replacement
Solicitation number
W912P5-17-B-0001
Issued by

About this file

Solicitation W912P5-17-B-0001 Amendment 0001

View the file

Other files

File Type Posted
Bid_Abstract_(Corrected)_W912P5-17-B-0001.pdf PDF
Abstract_of_Offers.pdf PDF
W912P5-17-B-0001-0005.pdf PDF
W912P5-17-B-0001Am5_TSpecs-pages.pdf PDF
W912P5-17-B-0001-0004.pdf PDF
W912P5-17-B-0001Am4_Plans-sheets.pdf PDF
W912P5-17-B-0001Am4_TSpecs-pages.pdf PDF
TVA_RSOE_LICENSE_AGREEMENT_DRAFT_7-27-17.pdf PDF
W912P5-17-B-0001Am3_Plans-sheets.pdf PDF
CHL_Enterprise_Database_Schema.pdf PDF
W912P5-17-B-0001-0003.pdf PDF
W912P5-17-B-0001Am3_Bid_Schedule_.xlsx XLSX spreadsheet
W912P5-17-B-0001Am3_TSpecs-pages.pdf PDF
TVA_FACILITY_ACCESS_AGREEMENT_DRAFT_7-27-17.pdf PDF
W912P5-17-B-0001-0002.pdf PDF
W912P5-17-B-0001Am2_Bid_Schedule.xlsx XLSX spreadsheet
W912P5-17-B-0001Am2_TSpecs-pages.pdf PDF
W912P5-17-B-0001Am1_TSpecs-pages.pdf PDF
CKLK_LC_CAD_DGN.zip ZIP file
CKLK_LC_Revit_Control_Shelter.zip ZIP file
CKLK_LC_Revit_Operations_Building.zip ZIP file
Arch_Keynotes_UFGS_118339.txt TXT text file
118339_v2015_A_OPS.rvt —
W912P5-17-B-0001Am1_AppBv1(03of16).pdf PDF
FIO_DS_Cross-Over_Bridge_and_US_Lock_Wall_Bridge_Access_-_Shop_Drawings.pdf PDF
Chickamauga_Lock_Chamber_GFE_Delivery.pdf PDF
W912P5-17-B-0001Am1_AppBv2(07of15).pdf PDF
118339_v2015_A_CS.rvt —
W912P5-17-B-0001Am1_AppBv1(09of16).pdf PDF
118339_v2015_SITE.rvt —
FIO_Combined_Cofferdam.pdf PDF
FIO_Approach_Wall_Beam_As-Builts.pdf PDF
W912P5-17-B-0001Am1_AppBv1(04of16).pdf PDF
SiteVisitRoster-Muscle_Shoals.pdf PDF
118339_v2015_M_CS.rvt —
W912P5-17-B-0001Am1_AppBv2(06of15).pdf PDF
118339_v2015_S_CS.rvt —
FIO_Lock_Excavation.pdf PDF
W912P5-17-B-0001Am1_AppBv1(12of16).pdf PDF
118339_v2015_E_OPS.rvt —
W912P5-17-B-0001Am1_AppBv2(08of15).pdf PDF
W912P5-17-B-0001Am1_AppBv2(10of15).pdf PDF
FIO_Miter_Gates,_Culvert_Valves,_Culvert_Bulkheads_and_Air_Seals_-_Shop_Drawings.pdf PDF
FIO_Plans_For_DS_Cross-Over_Bridge_and_US_Lock_Wall_Bridge_Access.pdf PDF
W912P5-17-B-0001Am1_AppBv2(05of15).pdf PDF
118339_v2015_S_OPS.rvt —
SiteVisitRoster-Core_Samples.pdf PDF
Chick_Pre-Bid_Site_Visit_Presentation_27June2017.pdf PDF
W912P5-17-B-0001Am1_AppBv1(13of16).pdf PDF
W912P5-17-B-0001Am1_AppBv2(11of15).pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XDD61416277

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT: Chickamauga Lock Chamber Replacement

The purpose of this amendment is to add the Site Visit Rosters and Site Visit Presentation to the IFB package on the FBO w ebsite; add Wage Determinations for the Muscle Shoals storage site; add CAD draw ings for the Lock Chamber; add Geotechnical Data (Appendix B to Tech Specs); add FIO & As-Built draw ings associated w ith previous contracts for the cofferdam, chamber excavation, approach w all, & GFP/GFE components; revise the Bid Schedule; and publish preliminary Q&A to the solicitation.

The deadline for all questions related to the IFB, Plans, Specif ications, and initial site visits is changed to 11:00 AM Central Time, 25 Jul 2017 (see revised "Instructions to Bidders"). The bid opening date and time remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 39

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-17-B-0001

X 9B. DATED (SEE ITEM 11)

19-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jul-2017

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, ROOM A680

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P5-17-B-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001 - TECH CHANGES

IFB No. W912P5-17-B-0001 Amendment No. 0001

Chickamauga Lock Chamber Replacement

CHANGES TO TECHNICAL SPECIFICATIONS

Section 01 00 00 GENERAL REQUIREMENTS

Remove Section 01 00 00 pages 3 through 5, and replace with revised Section 01 00 00 pages 3 through 5.

Section 01 22 00 PRICE AND PAYMENT PROCEDURES

Remove Section 01 22 00 pages 21 through 28, and replace with revised Section 01 22 00 pages 21 through 28.

Section 01 45 00 QUALITY CONTROL

Remove Section 01 45 00 pages 5 through 14, and replace with revised Section 01 45 00 pages 5 through 14.

Section 03 30 01 CONCRETE: MATERIALS

Remove Section 03 30 01 pages 7 through 30, and replace with revised Section 03 30 01 pages 7 through

30.

Section 03 30 03 CONCRETE: PRODUCTION

Remove Section 03 30 03 in its entirety (20 pages), and replace with revised Section 03 30 03 (21 pages).

Section 05 50 15 CIVIL WORKS FABRICATIONS

Remove Section 05 50 15 in its entirety (18 pages), and replace with revised Section 05 50 15 (14 pages).

Section 31 63 26 DRILLED SHAFTS FOR LOCK WALLS

Remove Section 31 63 26 pages 23 and 24, and replace with revised Section 31 63 26 pages 23 and 24.

Appendix A - FORMS AND ATTACHMENTS

Remove Submittal Register pages 13 through 97, and replace with revised Submittal Register pages 13 through 97.

Appendix B – GEOTECHNICAL DATA

Add new Appendix B Volume 1 to the set of technical specifications (1,742 pages).

Add new Appendix B Volume 2 to the set of technical specifications (722 pages).

CHANGES TO CONTRACT DRAWINGS

Replace the following contract drawing with revised contract drawing:

Drawing No. Description

61W510-2-LC CONSTRUCTION LIMITS AND LAYDOWN AREAS

The following drawing folios are hereby incorporated into the set of solicitation FOR INFORMATION ONLY drawings:

FIO APPROACH WALL BEAM AS-BUILTS (14 Sheets.)

FIO COFFERDAM STABILIZATION (47 Sheets.)

FIO COMBINED COFFERDAM (381 Sheets.)

FIO DS CROSS-OVER BRIDGE AND US LOCK WALL BRIDGE ACCESS - SHOP DRAWINGS (10

Sheets.)

FIO LOCK EXCAVATION (131 Sheets.)

FIO MITER GATES, CULVERT VALVES, CULVERT BULKHEADS AND AIR SEALS - SHOP

DRAWINGS (1,222 Sheets.)

FIO PLANS FOR DS CROSS-OVER BRIDGE AND US LOCK WALL BRIDGE ACCESS (6 Sheets.)

FIO PLANS FOR MITER GATES, CULVERT VALVES, CULVERT BULKHEADS AND AIR SEALS

(266 Sheets.)

--- END OF AMENDMENT NO. 0001 TECHNICAL CHANGES---

AMENDMENT 01 - Q&A

Chickamauga Lock Chamber Replacement Solicitation Number: W912P5-17-B-0001 Amendment 0001 Question and Answers

1. Question: BoMetals would like your consideration for our PVC Waterstop to be specified in your project.

Answer: The Government has not specified a particular brand name of waterstop. Instead, the technical specifications set forth the salient characteristics the waterstop must meet or exceed.

2. Question: Whose responsibility is the maintenance of the concrete batch plant?

Answer: The contractor is responsible for all operation and maintenance of the concrete batch plant.

3. Question: What happens if the contract duration ends for the awarded base and options prior to receiving funding to award additional options?

Answer: If funding is not available to execute one (1) or more unexercised options before the contract completion date, then the contract will be closed out after completion of the awarded scope. If funding is not available to execute one (1) or more unexercised options before the option expiration date, the Government reserves the right to negotiate an extension of the option expiration date.

4. Question: Current contract durations may not have sufficient time to procure, fabricate and install portions of the embedded metals. Would you consider extending the period of performance for these options?

Answer: The Government reevaluated the option durations and determined that no additional time is warranted at this time.

5. Question: Is it acceptable for a contractor to complete option work earlier than the contract duration for individual options?

Answer: After award, the contractor is required to submit a schedule establishing work schedules and sequencing to complete the project. A schedule that provides for completion of awarded option work prior to the contract completion date is acceptable.

6. Question: Are the anticipated award dates based on contract durations for each option?

Answer: No. The anticipated award date for each option was established to provide flexibility to execute funding. Such dates reflect the latest date the Government intends to exercise each option.

7. Question: When will the Lock Excavation contract be completed?

Answer: Reference FAR Clause 52.211-10, which is incorporated in the Solicitation, the anticipated completion date of the Lock Excavation Contract is February 2019.

8. Question: How much money is available this FY for this contract?

Answer: For current year funding, the FY17 Work plan provided $37M for the Chickamauga Lock Replacement project, which project includes, among other items, the Lock Excavation Contract options and the Lock Chamber Contract.

9. Question: Why was the additional laydown area removed from the industry day presentation?

Answer: Large portions of this area are required by USACE Operations staff for maintenance of the existing lock structure. Currently, the existing chamber closure structure is stored at this location, preventing access to this area. Also, a portion of this area is reserved for crane access during the maintenance at the project. For these reasons, this area has been omitted from the current solicitation. A note has been added to drawing 61W510-2-LC stating, "For bidding purposes, the contractor shall assume the use of this area is restricted to government use only for the duration of the contract. Portions of this area may become available to the contractor when no longer needed by the government and after coordination with the Contracting Officer."

10. Question: What is the timeline for exercising options for this contract?

Answer: The timeline for exercising options is funding dependent. See FAR Clause 52.217-7, which is incorporated in the Solicitation, for the latest date the Government intends to exercise each option.

11. Question: What material was used to fill the segmental cofferdam?

Answer: The segmental cofferdam was filled with tremie placed concrete to create a plug in the bottom.

Thereafter, it was filled with conventional placed concrete to the top of the precast box.

12. Question: Where is the current contractor's employee parking area?

Answer: USACE has allowed the use of a portion of the restricted area near laydown area #1 identified on drawing 61W510-2-LC for Contractor parking.

13. Question: Are there any requirements for treating the water that is removed from the cofferdam?

Answer: Reference Specification (including, but not limited to Section 01 57 24 Para. 3.6; Section 01 57 19 Para. 3.7.6; Section 02 32 00 Para. 1.9; and Section 01 57 19 Para. 3.1.2.

14. Question: How does the current contractor access the cofferdam area?

Answer: The current contractor uses work barges and boats to ferry personnel, equipment, and materials from the work area.

15. Question: Could the cofferdam be used as a working surface, if so, what is the load capacity?

Answer: The vertical surcharge load allowed on the top of the cofferdam is 600 psf.

16. Question: How deep are the anchor blocks?

Answer: The anchor blocks vary in depth from 4.5 ft to approximately 23 ft.

17. Question: How deep will the excavation be at the completion of the lock excavation contract?

Answer: Drawing 61W510-64-LC illustrates the intended founding elevations at the completion of the Lock Excavation Contract. The elevations identified by hatch marks indicate the depth of excavation required under the Lock Chamber Contract.

18. Question: Has consideration been given to including an escalation clause?

Answer: Based on the Government’s research, which included input from material suppliers, it was determined that pricing volatility was not sufficient to warrant inclusion of the escalation clauses.

19. Question: Are shop drawings and specifications available for GFE?

Answer: See Amendment 0001. Reference Drawings:

FIO_DS Cross-Over Bridge and US Lock Wall Bridge Access - Shop Drawings.pdf FIO_Miter Gates, Culvert Valves, Culvert Bulkheads and Air Seals - Shop Drawings.pdf FIO_Plans For DS Cross-Over Bridge and US Lock Wall Bridge Access.pdf FIO_Plans For Miter Gates, Culvert Valves, Culvert Bulkheads and Air Seals.pdf

20. Question: How were the GFE items delivered in the previous contract?

Answer: Reference the For Information Only (FIO) files, specifically Chickamauga Lock Chamber GFE Delivery.pdf, which discusses the delivery of the GFE.

21. Question: Could a contractor use other means to transport GFE?

Answer: Reference Specification (including, but not limited to Paragraphs 1.2 and 1.4 of Section 35 20 17, Paragraphs 1.2 and 1.4 of Section 35 20 18, and Paragraph 1.4 of Section 32 34 30). The contractor is responsible for developing and submitting a plan for COR approval for transportation of GFE to Chickamauga Lock.

22. Question: What river mile is the Muscle Shoals facility?

Answer: The Muscle Shoals facility is just upstream of Wilson Lock, which is located at Tennessee River Mile 259.4.

23. Question: Who fabricated the GFE?

Answer: Fabricator information can be found on the shop drawings for each individual GFE provided in the FIO files. See Amendment 0001. Reference Drawings:

FIO_DS Cross-Over Bridge and US Lock Wall Bridge Access - Shop Drawings.pdf FIO_Miter Gates, Culvert Valves, Culvert Bulkheads and Air Seals - Shop Drawings.pdf

24. Question: Can we extend the date for bid opening?

Answer: No. Currently, the Government does not anticipate extending the bid opening date.

25. Question: Can we extend the contractor question period?

Answer: Yes. See Amendment 0001. The deadline for contractors to submit questions has been extended to 25 July 2017.

26. Question: Are there requirements for termination coupling between concrete placement options?

Answer: In the event one or more of the options is not exercised, there may be a need for termination couplings. If so, the Government will request a proposal to address such requirement.

27. Question: Please provide weight for shipping containers with GFE at Muscle Shoals facility.

Answers: Exact weights of shipping containers are unavailable. The shipping containers were packaged at the fabricator's facility then delivered by truck to the Muscle Shoals facility.

28. Question: Is the paint coating on the GFE the final coat?

Answers: Reference FAR Clause 252.236-7001. See Shop drawings added in Amendment 0001.

Generally, the miter gates, culvert valves and bulkheads have received a final coating of paint in most locations.

29. Question: Are pick points identified/provided for GFE?

Answer: Reference FAR Clause 252.236-7001. See Shop drawings added in Amendment 0001 for lifting point details.

30. Question: Are there any mechanical items included in the GFE?

Answer: All items are shown on drawing 61W510-401-LC and listed in the Specifications Appendix A.

31. Question: What are the requirements for warranty for the installation of the GFE?

Answer: A warranty of one year is required for any work performed as a part of this contract, subject to the contract requirement per FAR clause 52.246-21. With regard to GFP, the clause states the following:

(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.

32. Question: How will USACE verify installation of GFE if option 13 is not awarded?

Answer: The installation of GFE must meet installation tolerances stated in plans and specifications. They can be operated by temporary means if other options are not exercised.

33. Question: Do prevailing wage rates apply at individual locations?

Answer: TN89 and TN146 apply to the Lock Chamber location while AL44 and AL151 apply to Muscle Shoals.

34. Question: Are weights published for each individual GFE item?

Answers: Reference FAR Clause 252.236-7001. See Drawings added in Amendment 0001 for additional details.

35. Question: What is required for areas of the GFE with corrosion or damage?

Answer: The contractor is responsible for performing a condition assessment of the inventory prior to transportation. If necessary, the Government will request a repair plan to remedy areas of concern.

36. Question: Have all the [drill] logs been posted for viewing?

Answer: Reference Amendment 0001. See Appendix B – Geotechnical Data Volume 1 and 2

37. Question: Explain the checkerboard concept?

Answer: It is the phased removal of the spillway apron/baffle block where the first phase is removed and the monolith concrete in those sections are placed to an elevation specified on the plans before the phase 2 checkerboard is removed.

38. Question: In reference to Instructions to Bidders page 5 of 70, the cutoff date of RFI’s for the above indicated project is stated as July 14th, 2017. The bid due date for this project is August 23rd, 2017. We would like to respectfully request that you will consider extending the RFI cutoff date and postpone it to August 11th, 2017.

Answer: Reference Amendment 0001. The deadline for contractors to submit questions has been extended to 25 July 2017.

39. Question: While at the site visit in Alabama, we noticed that there was quite a bit of rusting on the already fabricated components for this project. Is it the intention for the Corps to repair the rusting pieces, or will the Corps be accepting those “As-Is”?

Answer: The contractor is responsible for performing a condition assessment of the inventory prior to transportation. If necessary, the Government will request a repair plan to remedy areas of concern.

40. Question: Please issue in an addendum the plan holders for this project and the site visit log with presentation from 6/27/2017 and 06/28/2017.

Answer: Reference Amendment 0001.

41. Question: Please provide a list or website to help locate qualified minority (HUB) vendors and subcontractors for this contract.

Answer: To locate qualified HUBZone, 8(a), or SDB contractors, the following website is provided:

http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm

To locate qualified veteran contractors, the following website is provided:

https://www.vip.vetbiz.gov/Default.aspx

42. Question: Please consider providing all available CAD files for drawings.

Answer: CAD files have been provided for reference purposes only. Contractor must, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files. These electronic CAD drawing files are not construction documents. Differences may exist between the CAD files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic CAD files, nor does it make representation to the compatibility of these files with the Contractor hardware or software. In the event that a conflict arises between the “For Construction Contract Documents” prepared by the Government and the furnished CAD files, the “For Construction Contract Documents” govern, refer to paragraph 6 “Order of Precedence” of Section 00800 of the Solicitation. The Contractor is responsible for determining if any conflict exists. Use of these CAD files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project. If the Contractor uses, duplicates or modifies these electronic source drawing files for use in producing construction data related to this contract, remove all previous indicia of ownership (seals, logos, signatures, initials and dates).

SECTION 00010 - SOLICITATION CONTRACT FORM

The Issued By organization has changed from:

US ARMY CORPS OF ENGINEERS-NASHVILLE

CELRN-EC-C,

110 NINTH AVE. SOUTH

NASHVILLE TN 37203

To:

US ARMY CORPS OF ENGINEERS-NASHVILLE

CELRN-RC-N,

110 NINTH AVE. SOUTH

NASHVILLE TN 37203

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

BID SCHEDULE

Chickamauga Lock Chamber Base Bid Schedule

Concrete Batch Plant

BID

ITEM DESCRIPTION SPEC.

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

AMOUNT

Div 01; General Requirements

0102-00 Mobilization and Demobilization - Batch Plant

01 22 00 1 Job $ $

0105-00 Premiums for Performance and Payment Bonds

01 22 00 1 Job $ $

0106-00 Maintenance and Protection of Traffic

01 50 00 1 Job $ $

BASE ESTIMATED AMOUNT $ _____________

Option 1 Bid Schedule

Conveyor, Testing Facilities, QA Facilities

BID

ITEM DESCRIPTION SPEC.

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

Div 01; General Requirements

0103-01 Mobilization and Demobilization – Conveyor

0104-01 Mobilization and Demobilization - QA Testing Lab and Field Office

0105-01 Premiums for Performance and Payment Bonds

0106-01 Maintenance and Protection of Traffic

0107-01 Maintain Testing Lab and COE Field Offices

01 50 00 5 MO $ $

OPTION 1 ESTIMATED AMOUNT $ _____________

OPTION 2 ESTIMATED AMOUNT $ _____________

Option 2 Bid Schedule

Mobilization, Remaining Excavation, Dental Excavation and Concrete, Rock Bolts, Shotcrete

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

01 Div 01; General Requirements

0101-02 Mobilization and Demobilization – General

0105-02 Performance & Payment Bonds Premiums 01 22 00 1 Job $ $ 0106-02 Maintenance and Protection of Traffic

0107-02 Maintain Testing Lab and COE Field Offices

01 50 00 1 MO $ $

0108-02 Diversion and Care of Water

01 57 24 1 Job $ $

02 Div 02; Existing Conditions

DEMOLITION

0201-02 Demolish Spillway Apron

02 41 17 1 Job $ $

03 Div 03; Concrete

0303-02 Reinforcing Steel – Material

03 20 02 2.5 TON $ $

0311-02 Cement, Ty II, MH - Low Alkali

03 30 01 1,390.0 TON $ $

0313-02 Class F Fly Ash

03 30 01 540.0 TON $ $

0325-02 Shotcrete Placement (4")

03 37 13 1,120.0 SY $ $

13 Div 13; Special Construction

1301-02 Instrumentation Program

13 50 00 1 Job $ $

31 Div 31; Earthwork

EXCAVATION

3104-02 Dental Excavation

31 23 05 10,000.0 CY $ $

3105-02 Dental Concrete

31 23 05 10,000.0 CY $ $

3106-02 Rock Excavation

31 23 05 9,900.0 CY $ $

3107-02 Pre-Splitting

31 23 06 2,700.0 LF $ $

3108-02 Line Drilling (6" spacing)

31 23 06 11,200.0 LF $ $

3110-02 Preliminary Clean-Ups

31 60 00 19,350.0 SY $ $

3112-02 Rock Bolts (Grouted)

31 68 13 1,900.0 LF $ $

32 Div 32; Exterior Improvements

SITE DEVELOPMENT

3215-02 Temporary Seeding 32 92 19 5 ACR $ $

Chickamauga Lock Chamber, W912P5-17-B-0001 Option 3 Bid Schedule

Mobilization, Foundation Prep, Mud Mat, Drilled Shaft

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

0101-03 Mobilization and Demobilization - General 01 22 00 1 Job $ $

0105-03 Premiums for Performance and Payment Bonds

01 22 00 1 Job $ $

0106-03 Maintenance and Protection of Traffic 01 50 00 1 Job $ $

0107-03 Maintain Testing Lab and COE Field Offices 01 50 00 5 MO $ $

0108-03 Diversion and Care of Water 01 57 24 1 Job $ $

0303-03 Reinforcing Steel - Material 03 20 02 58.0 TON $ $

0304-03 Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete

03 20 02 58.0 TON $ $

0311-03 Cement, Ty II, MH - Low Alkali 03 30 01 286.0 TON $ $

0313-03 Class F Fly Ash 03 30 01 148.0 TON $ $

0315-03 Structural Concrete (5ksi) 03 70 00 1,180.0 CY $ $

0318-03 Miscellaneous Concrete (3ksi) 03 70 01 150.0 CY $ $

05 Div 05: Metals

0501-03 Miscellaneous Metal (Check Post, Ladder, Line Hook, Grate, Hatch, Frame, HM Doors, Embedded Metals)

05 50 15 1 Job $ ________ $ ____________

0502-03 Wall Armor (Excluding Approach Wall Beams)

05 50 15 1 Job $ ________ $ ___________

13 Div 13; Special Construction

1301-03 Instrumentation Program 13 50 00 1 Job $ $

31 Div 31; Earthwork

EXCAVATION

3109-03 Clean and Backfill Exploratory Holes 31 32 23 200.0 CF $ $

3110-03 Preliminary Clean-Ups 31 60 00 19,380.0 SY $ $

3111-03 Foundation Preparation 31 60 00 19,400.0 SY $ $

PILES & DRILLED SHAFTS FOR LOCK

WALL

3124-03 74" Drilled Shaft (Riverward) 31 63 26 722.0 LF $ $

3125-03 54" Drilled Shaft (Landward) 31 63 26 558.0 LF $ $

33 Div 33; Utilities

3313-03 Grounding 33 70 02 1 Job $ $

OPTION 3 ESTIMATED AMOUNT $ _____________

Option 4 Bid Schedule

Landwall Concrete from foundation to 5ft above culvert (EL631.5)

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

0105-04 Premiums for Performance and Payment Bonds

01 22 00 1 Job $ $

0106-04 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0107-04 Maintain Testing Lab and COE Field

Offices

01 50 00 2 MO $ $

0108-04 Diversion and Care of Water 01 57 24 1 Job $ $

0301-04 Waterstop 03 15 14 1 Job $ $ 0302-04 2" LDPE Foam Expansion Joint 03 15 14 500.0 SF $ $ 0303-04 Reinforcing Steel - Material 03 20 02 908.1 TON $ $ 0304-04 Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete

03 20 02 908.1 TON $ $

0306-04 Segmental Cofferdam Dowels (#6, #8, #9, #10)

03 20 02 1,815 EA $ $

0307-04 Drill and Grout #6 Dowels; Waterstop Recess

03 20 02 15 EA $ $

0309-04 Drill and Grout #9 Dowels; Blocks 45 &

03 20 02 20 EA $ $

0310-04 Drill and Grout #11 Dowels; Spillway 03 20 02 265 EA $ $ 0311-04 Cement, Ty II, MH - Low Alkali 03 30 01 4,098.0 TON $ $ 0313-04 Class F Fly Ash 03 30 01 1,600.0 TON $ $ 0315-04 Structural Concrete (5ksi) 03 70 00 17,308.0 CY $ $ 0316-04 Mass Concrete (3ksi) 03 70 00 17,713.0 CY $ $ 0318-04 Miscellaneous Concrete (3ksi) 03 70 01 150.0 CY $ $ 0322-04 Roughen Cofferdam Surface 03 30 04 10,267.0 SF $ $

05 Div 05; Metals

0501-04 --DELETED --

0502-04 --DELETED --

0504-04 --DELETED --

0507-04 Culvert Liners 05 50 15 1 Job $ $

1301-04 Instrumentation Program 13 50 00 1 Job $ $ 22 Div 22; Plumbing

2201-04 Miscellaneous Embedded Plumbing Components

22 00 00 1 Job $ $

3301-04 Miscellaneous Embedded Utilities

33 30 00 1 Job $ $

3313-04 Grounding 33 70 02 1 Job $ $

OPTION 4 ESTIMATED AMOUNT $ _____________

Option 5 Bid Schedule

Upper Riverwall Concrete from foundation to 5ft above culvert (EL631.5)

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

0105-05 Premiums for Performance and Payment

01 22 00 1 Job $ $

0106-05 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0107-05 Maintain Testing Lab and COE Field

Offices

01 50 00 6 MO $ $

0108-05 Diversion and Care of Water 01 57 24 1 Job $ $

0301-05 Waterstop 03 15 14 1 Job $ $ 0302-05 2" LDPE Foam Expansion Joint 03 15 14 500.0 SF $ $ 0303-05 Reinforcing Steel - Material 03 20 02 534.9 TON $ $ 0304-05 Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete

03 20 02 534.9 TON $ $

0307-05 Drill and Grout #6 Dowels; Waterstop Recess

03 20 02 15 EA $ $

0310-05 Drill and Grout #11 Dowels; Spillway 03 20 02 265 EA $ $ 0311-05 Cement, Ty II, MH - Low Alkali 03 30 01 2,887.0 TON $ $ 0313-05 Class F Fly Ash 03 30 01 1,129.0 TON $ $ 0315-05 Structural Concrete (5ksi) 03 70 00 8,903.0 CY $ $ 0316-05 Mass Concrete (3ksi) 03 70 00 17,277.0 CY $ $ 0318-05 Miscellaneous Concrete (3ksi) 03 70 01 150.0 CY $ $

0501-05 --DELETED --

0502-05 --DELETED --

0504-05 --DELETED --

0507-05 Culvert Liners 05 50 15 1 Job $ $

1301-05 Instrumentation Program 13 50 00 1 Job $ $

2201-05 Miscellaneous Embedded Plumbing

3301-05 Miscellaneous Embedded Utilities

3313-05 Grounding 33 70 02 1 Job $ $

OPTION 5 ESTIMATED AMOUNT $ _____________

Option 6 Bid Schedule

Lower Riverwall Concrete from foundation to 5ft above culvert (EL631.5), Grouting

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

0105-06 Premiums for Performance and Payment Bonds 01 22 00 1 Job $

0106-06 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0107-06 Maintain Testing Lab and COE Field Offices 01 50 00 1 MO $ $ 0108-06 Diversion and Care of Water 01 57 24 1 Job $ $

0301-06 Waterstop 03 15 14 1 Job $ $ 0302-06 2" LDPE Foam Expansion Joint 03 15 14 500.0 SF $ $ 0303-06 Reinforcing Steel - Material 03 20 02 499.7 TON $ $ 0304-06 Place Rebar for Monolith, Structural, Mass, and

Miscellaneous Concrete

03 20 02 499.7 TON $ $

0307-06 Drill and Grout #6 Dowels; Waterstop Recess 03 20 02 15 EA $ $ 0311-06 Cement, Ty II, MH - Low Alkali 03 30 01 4,135.0 TON $ $ 0313-06 Class F Fly Ash 03 30 01 3,449.0 TON $ $ 0315-06 Structural Concrete (5ksi) 03 70 00 13,467.0 CY $ $ 0316-06 Mass Concrete (3ksi) 03 70 00 23,696.0 CY $ $ 0318-06 Miscellaneous Concrete (3ksi) 03 70 01 150.0 CY $ $

0501-06 --DELETED--

0502-06 --DELETED--

0504-06 --DELETED--

0507-06 Culvert Liners 05 50 15 1 Job $ $

1301-06 Instrumentation Program 13 50 00 1 Job $ $

2201-06 Miscellaneous Embedded Plumbing Components 22 00 00 1 Job $ $

GROUTING

3133-06 Drill Grout Holes in Rock 31 32 23 23,884.0 LF $ $ 3134-06 Pressure Washing (Hydraulic) 31 32 23 178.0 HR $ $ 3135-06 Pressure Testing (Hydraulic) 31 32 23 701 EA $ $ 3136-06 Portland Cement in Grout 31 32 23 20,474 BAG $ $ 3137-06 Grouting Connections 31 32 23 807 EA $ $ 3138-06 Placing Grout 31 32 23 55,988.0 CF $ $ 3139-06 Government Requested Standby - Grouting 31 32 23 230.0 HR $ $ 3140-06 Televiewer Survey 31 32 23 2,195.0 LF $ $ 3141-06 Verification Core Drilling 31 32 23 1,463.0 LF $ $

3142-06 Re-Drill Grout Holes in Rock 31 32 23 2,002.0 LF $ $

3301-06 Miscellaneous Embedded Utilities Components 33 30 00 1 Job $ $ 3313-06 Grounding 33 70 02 1 Job $ $

OPTION 6 ESTIMATED AMOUNT $ _____________

Option 7 Bid Schedule

Landwall Concrete from EL 631.5 to EL 645

NUMBER

EST.

QTY.

UNI

T

UNIT

PRICE

ESTIMATED

0105-07 Premiums for Performance and Payment

01 22 00 1 Job $ $

0106-07 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0107-07 Maintain Testing Lab and COE Field

Offices

01 50 00 1 MO $ $

0108-07 Diversion and Care of Water 01 57 24 1 Job $ $

0301-07 Waterstop 03 15 14 1 Job $ $ 0302-07 2" LDPE Foam Expansion Joint 03 15 14 500.0 SF $ $ 0303-07 Reinforcing Steel - Material 03 20 02 210.8 TON $ $ 0304-07 Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete

03 20 02 210.8 TON $ $

0307-07 Drill and Grout #6 Dowels; Waterstop Recess

03 20 02 15 EA $ $

0311-07 Cement, Ty II, MH - Low Alkali 03 30 01 2,324.0 TON $ $ 0313-07 Class F Fly Ash 03 30 01 830.0 TON $ $ 0315-07 Structural Concrete (5ksi) 03 70 00 791.0 CY $ $ 0316-07 Mass Concrete (3ksi) 03 70 00 17,193.

CY $ $

0318-07 Miscellaneous Concrete (3ksi) 03 70 01 150.0 CY $ $ 0322-07 Roughen Cofferdam Surface 03 30 04 10,166.

SF $ $

05 --DELETED --

0501-07 --DELETED --

0502-07 --DELETED --

0504-07 --DELETED --

0507-07 --DELETED --

1301-07 Instrumentation Program 13 50 00 1 Job $ $

2201-07 Miscellaneous Embedded Plumbing

3301-07 Miscellaneous Embedded Utilities

3313-07 Grounding 33 70 02 1 Job $ $

OPTION 7 ESTIMATED AMOUNT $ _____________

Option 8 Bid Schedule

Riverwall Concrete EL 631.5 to EL 660

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

0105-08 Premiums for Performance and Payment

01 22 00 1 Job $ $

0106-08 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0107-08 Maintain Testing Lab and COE Field

Offices

01 50 00 2 MO $ $

0108-08 Diversion and Care of Water 01 57 24 1 Job $ $

0301-08 Waterstop 03 15 14 1 Job $ $ 0302-08 2" LDPE Foam Expansion Joint 03 15 14 500.0 SF $ $ 0303-08 Reinforcing Steel - Material 03 20 02 411.9 TON $ $ 0304-08 Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete

03 20 02 411.9 TON $ $

0307-08 Drill and Grout #6 Dowels; Waterstop Recess

03 20 02 15 EA $ $

0311-08 Cement, Ty II, MH - Low Alkali 03 30 01 4,389.0 TON $ $ 0313-08 Class F Fly Ash 03 30 01 1,682.0 TON $ $ 0315-08 Structural Concrete (5ksi) 03 70 00 920.0 CY $ $ 0316-08 Mass Concrete (3ksi) 03 70 00 43,530.0 CY $ $ 0318-08 Miscellaneous Concrete (3ksi) 03 70 01 150.0 CY $ $

05 --DELETED--

0501-08 --DELETED--

0502-08 --DELETED--

0504-08 --DELETED--

0507-08 --DELETED--

1301-08 Instrumentation Program 13 50 00 1 Job $ $

2201-08 Miscellaneous Embedded Plumbing

3301-08 Miscellaneous Embedded Utilities

3313-08 Grounding 33 70 02 1 Job $ $

OPTION 8 ESTIMATED AMOUNT $ _____________

Option 9 Bid Schedule

Remainder of Concrete including Handrail, Instrumentation, Access Bridge Installation, Misc Work

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

0105-09 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $ 0106-09 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0107-09 Maintain Testing Lab and COE Field Offices 01 50 00 9 MO $ $ 0108-09 Diversion and Care of Water 01 57 24 1 Job $ $

0301-09 Waterstop 03 15 14 1 Job $ $ 0302-09 2" LDPE Foam Expansion Joint 03 15 14 500.0 SF $ $ 0303-09 Reinforcing Steel - Material 03 20 02 1,760.8 TON $ $ 0304-09 Place Rebar for Monolith, Structural, Mass, and

Miscellaneous Concrete

03 20 02 1,760.8 TON $ $

0306-09 Segmental Cofferdam Dowels (#6, #8, #9, #10) 03 20 02 1,815.0 EA $ $ 0307-09 Drill and Grout #6 Dowels; Waterstop Recess 03 20 02 15 EA $ $ 0309-09 Drill and Grout #9 Dowels; Blocks 45 & 46 03 20 02 20 EA $ $ 0310-09 Drill and Grout #11 Dowels; Spillway 03 20 02 530 EA $ $ 0311-09 Cement, Ty II, MH - Low Alkali 03 30 01 7,463.0 TON $ $ 0312-09 Cement, Ty I/II - Low Alkali 03 30 01 1.2 TON $ $ 0313-09 Class F Fly Ash 03 30 01 2,849.0 TON $ $ 0315-09 Structural Concrete (5ksi) 03 70 00 849.0 CY $ $ 0316-09 Mass Concrete (3ksi) 03 70 00 74,738.5 CY $ $ 0318-09 Miscellaneous Concrete (3ksi) 03 70 01 15.0 CY $ $ 0319-09 Precast Concrete 03 41 33 1 Job $ $ 0322-09 Roughen Cofferdam Surface 03 30 04 12,464.0 SF $ $

0501-09 --DELETED--

0502-09 --DELETED--

0503-09 Handrail (Project Wide) 05 50 15 1 Job $ $

0504-09 --DELETED--

0505-09 Culvert Intake Trashracks 05 50 15 1 Job $ $ 0506-09 Spillway Operating Deck Access Stairway 05 51 00 1 Job $ $

10 Div 10; Specialties

1001-09 Permanent Exterior Signage 10 14 01 1 Job $ $

1301-09 Instrumentation Program 13 50 00 1 Job $ $

2201-09 Miscellaneous Embedded Plumbing Components 22 00 00 1 Job $ $ 32 Div 32; Exterior Improvements

OPTION 9 ESTIMATED AMOUNT $ _____________

Option 10 Bid Schedule

Installation of Culvert Valves and Miter Gates including machinery and second pour concrete

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

0105-10 Premiums for Performance and Payment

01 22 00 1 Job $ $

0106-10 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0107-10 Maintain Testing Lab and COE Field

Offices

01 50 00 7 MO $ $

0108-10 Diversion and Care of Water 01 57 24 1 Job $ $

0303-10 Reinforcing Steel - Material 03 20 02 36.0 TON $ $ 0305-10 Place Rebar for 2nd Stage Concrete 03 20 02 36.0 TON $ $ 0312-10 Cement, Ty I/II - Low Alkali 03 30 01 54.0 TON $ $ 0317-10 2nd Stage Concrete (5ksi) 03 80 00 1,000.0 CY $ $ 0321-10 Concrete Block - Monolith M1 at Pier 2 03 80 00 1 Job $ $

0504-10 Caisson and Stoplog Recess Fillers 05 50 15 1 Job $ $

0505-10 --DELETED--

0507-10 --DELETED--

1301-10 Instrumentation Program 13 50 00 1 Job $ $

2202-10 Service Water System 22 00 00 1 Job $ $ 2203-10 Compressed Air System 22 15 09 1 Job $ $ 2204-10 Drainage Systems (Gallery) 22 00 00 1 Job $ $ 2205-10 Gate Spray System 22 00 00 1 Job $ $

35 Div 35; Waterway & Marine Const

3501-10 Install Miter Gates Embedded Metals 35 20 17 1 Job $ $ 3502-10 Install Miter Gates 35 20 17 1 Job $ $ 3503-10 Floating Mooring Bits 35 59 29 12 EA $ $

SITE DEVELOPMENT

3215-09 Temporary Seeding 32 92 19 5.0 ACR $ $

PRE-FABRICATED BRIDGES

3218-09 Install Downstream Prefabricated Bridge 32 34 30 1 Job $ $ 3219-09 Install Upstream Prefabricated Bridge 32 34 30 1 Job $ $

3301-09 Miscellaneous Embedded Utilities Components 33 30 00 1 Job $ $ 3313-09 Grounding 33 70 02 1 Job $ $

3504-10 Culvert Valve Operating Machinery and Embedded Metals

35 20 18 1 Job $ $

3505-10 Install Culvert Valve, Trunnion, and Embedded Metals

35 20 18 1 Job $ $

3506-10 Install Culvert Valve Bulkhead, and Embeddd Metals

35 20 18 1 Job $ $

3508-10 Miter Gate Operating Machinery and Embedded Metals

35 20 18 1 Job $ $

41 Div 41; Matl Process/Handling Equipment

4101-10 Lock Hydraulic System 41 24 27 1 Job $ $

OPTION 10 ESTIMATED AMOUNT $ _____________

Option 11 Bid Schedule

Operations Building, Control Shelters, Electrical and small Mechanical Items

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

0105-11 Premiums for Performance and Payment

01 22 00 1 Job $ $

0106-11 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0107-11 Maintain Testing Lab and COE Field Offices 01 50 00 5 MO $ $ 0108-11 Diversion and Care of Water 01 57 24 1 Job $ $

1301-11 Instrumentation Program 13 50 00 1 Job $ $

2202-11 Service Water System 22 00 00 1 Job $ $ 2203-11 Compressed Air System 22 15 09 1 Job $ $ 2204-11 Drainage Systems (Gallery) 22 00 00 1 Job $ $ 2205-11 Gate Spray System 22 00 00 1 Job $ $

23 Div 23; Heat, Vent & Air Cond

2301-11 HVAC Systems 23 00 00 1 Job $ $ 26 Div 26; Electrical

2601-11 Electrical Power Equipment 26 20 00 1 Job $ $ 2602-11 General Electrical Work 26 20 00 1 Job $ $ 2603-11 Lock and Gallery Lighting 26 56 00 1 Job $ $

27 Div 27; Communications

2701-11 Fiber Optic Data Transmission System 27 21 10 1 Job $ $ 2702-11 Building Telecommunications Cabling

System 27 10 00 1 Job $ $

28 Div 28; Elec Safety & Security

2801-11 Lock Operations CCTV System 28 23 23 1 Job $ $ 2802-11 Security IDS and CCTV System 28 20 01 1 Job $ $ 2803-11 Fire Detection System 28 31 64

28 31 00 1 Job $ $

35 Div 35; Waterway & Marine Const

3507-11 Tow Haulage System 35 11 50 1 Job $ $ 3509-11 Lock Operations Building 01 22 00 1 Job $ $

40 Div 40; Process Integration

4001-11 Lock Control System 40 95 00 1 Job $ $ 41 Div 41; Matl Process/Handling Equipment

4101-11 Lock Hydraulic System 41 24 27 1 Job $ $

OPTION 11 ESTIMATED AMOUNT $ _____________

Option 12 Bid Schedule

Bay 5 Shear Wall

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

0105-12 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $ 0106-12 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0107-12 Maintain Testing Lab and COE Field Offices 01 50 00 1 MO $ $ 0108-12 Diversion and Care of Water 01 57 24 1 Job $ $

0301-12 Waterstop 03 15 14 1 Job $ $ 0303-12 Reinforcing Steel - Material 03 20 02 33.6 TON $ $ 0304-12 Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete

03 20 02 33.6 TON $ $

0311-12 Cement, Ty II, MH - Low Alkali 03 30 01 229.4 TON $ $ 0313-12 Class F Fly Ash 03 30 01 89.1 TON $ $ 0315-12 Structural Concrete (5ksi) 03 70 00 1,650.0 CY $ $

1301-12 Instrumentation Program 13 50 00 1 Job $ $

BAY 5 STRAND ANCHORS

3126-12 Furnish and Install Post Tensioned Anchors 31 68 15 3,040.0 LF $ $ 3127-12 Additional Performance Tests 31 68 15 3 EA $ $ 3128-12 Additional Proof Tests 31 68 15 3 EA $ $ 3129-12 Additional Watertightness Testing 31 68 15 16 EA $ $ 3130-12 Consolidation Grouting 31 68 15 1,259.0 CF $ $ 3131-12 Redrilling Consolidation Grout 31 68 15 1,952.0 LF $ $ 3132-12 Government Requested Standby -

Consolidation Grouting

31 68 15 32.0 HR $ $

OPTION 12 ESTIMATED AMOUNT $ _____________

OPTION 13 ESTIMATED AMOUNT $ _____________

BASE ESTIMATED AMOUNT $ _____________

OPTION 1 ESTIMATED AMOUNT $ _____________

OPTION 2 ESTIMATED AMOUNT $ _____________

OPTION 3 ESTIMATED AMOUNT $ _____________

OPTION 4 ESTIMATED AMOUNT $ _____________

OPTION 5 ESTIMATED AMOUNT $ _____________

OPTION 6 ESTIMATED AMOUNT $ _____________

OPTION 7 ESTIMATED AMOUNT $ _____________

OPTION 8 ESTIMATED AMOUNT $ _____________

OPTION 9 ESTIMATED AMOUNT $ _____________

OPTION 10 ESTIMATED AMOUNT $ _____________

OPTION 11 ESTIMATED AMOUNT $ _____________

OPTION 12 ESTIMATED AMOUNT $ _____________

OPTION 13 ESTIMATED AMOUNT $ _____________

TOTAL ESTIMATED AMOUNT (BASE+ALL OPTIONS) $ _____________

Option 13 Bid Schedule

Commissioning of the new lock & Breach (including Care & Diversion of Water)

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

0105-13 Performance & Payment Bonds Premiums 01 22 00 1 Job $ $ 0106-13 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0107-13 Maintain Testing Lab and COE Field Offices 01 50 00 3 MO $ $ 0108-13 Diversion and Care of Water 01 57 24 1 Job $ $ 0109-13 Commissioning 01 91 13 1 Job $ $

1301-13 Instrumentation Program 13 50 00 1 Job $ $

40 Div 40; Process Integration

4001-13 Lock Control System 40 95 00 1 Job $ $

Bid Schedule Summary

NUMBER

EST.

QTY. UNIT UNIT

PRICE

ESTIMATED

INSTRUCTIONS TO BIDDERS

1.0 GENERAL REQUIREMENTS

1.1 Intent: The intent of this solicitation is to award one contract for the Chickamauga Lock Chamber Replacement at Chickamauga Lock in Chattanooga, TN.

1.2 Disclosure of Magnitude of Construction Project: The estimated magnitude of this requirement is between $250,000,000 and $500,000,000.

1.3 Basis of Selection of Award: Award shall be made to the lowest priced bidder who is found to be responsive and responsible. See Federal Acquisition Regulation (FAR) clause 52.214-19, Contract Award— Sealed Bidding—Construction, for more information.

In accordance with FAR clause 52.217-5, the Government intends to evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Any, some or all of the options may be exercised at any time but no later than 30 May 2023.

1.4 Type of Contract: The Government intends to award one firm-fixed price contract.

1.5 Who May Submit: The procurement is a full and open competition. Small businesses may submit bids.

1.6 North American Industry Classification System (NAICS) Code and Small Business Size Standard: The NAICS code for this project is 237990, Other Heavy and Civil Engineering Construction is applicable to this project. It has a size standard of $36.5M.

1.7 Specifications and Drawings: Specifications and Drawings will be provided as separate files and will be available on FBO. See the complete drawings and specification package located at www.fbo.gov.

The Specifications and Drawings are part of the solicitation/contract and shall be considered in that respect (see DFARS clause 252.236-7001, Contract Drawings and Specifications).

1.8 Pre-Bid Site Visit and Opportunity to view Representative Rock Cores: An organized site visit and an opportunity to view representative rock cores has been scheduled to occur during the solicitation period.

Offerors should inspect the job site prior to submitting a bid. Offerors should take such other steps as may be reasonably necessary to ascertain the nature and location of the work and the general and local conditions that can affect the work or the cost thereof. Failure to do so will not relieve offerors from the responsibility for properly estimating the difficulty or cost of successfully performing the work. The Government assumes no responsibility for any understanding or representations concerning conditions made by any of its officers, agents or employees, unless included in the solicitation, the specifications or related documents. Please refer to the Federal Acquisition Regulations (FAR) clause 52.236-27 Alt I, incorporated by full text in this solicitation, for information pertaining to the scheduled site visits and rock core viewing.

REGISTRATION: Only registered persons will be permitted to attend the site visits and/or rock core viewing.

In addition to the information below, please also provide your firm’s name, firm’s CAGE and/or DUNS number, and name and position title of primary point-of-contact and their telephone number and email address.

Please provide this information via email to James.W.Purcell@usace.army.mil . On the Pre-bid registration form, please indicate whether you will be attending just the pre-bid site visit, just the rock core viewing, or both.

Contractors and/or potential contractors wishing to attend a pre-bid meeting held at or in a TVA restricted/controlled areas (such as a Power Plant or Dam) shall submit a Nashville District (LRN) Security Access Form to the Contract Specialist ten (10) days prior to the site visit or meeting. If submitting the document in less than ten days, the Offeror may not receive approval for participation. The Contract Specialist will notify the Contractor if the request is approved or denied. Any pre-bid meeting which will cover anything other than http://www.fbo.gov/ mailto:James.W.Purcell@usace.army.mil public domain information shall be limited to US Citizens, except under unique circumstances. The Security Access Form and guidance is available at http://www.lrn.usace.army.mil/BusinessWithUs/Contracting/ContractSecurityRequirements

U.S. CITIZENS: The Offeror shall submit a Nashville District Corps of Engineers U.S. Citizen Pre-Bid and/or Site Visit Request Form to the LRN Point of Contact, Contract Specialist J.W. Purcell, no later than ten (10) days prior to the site visit. If submitting the document in less than ten days, the Offeror may not receive approval for participation. The LRN POC will notify the individual(s) if the request is approved or denied. The Security Access Form and guidance is available as a pdf attachment on www.fbo.gov with this solicitation and is titled Pre-Bid Meeting and/or Site Visit Request Form.

FOREIGN NATIONALS (FNs): All non-U.S. Citizens, including permanent residents wishing to attend the site visit must be approved in advance. FNs wishing to attend a site visit shall submit a completed Nashville District Corps of Engineers Foreign National Pre-Bid Meeting Request Form and legible color copies of two of the following documents: Passport (unexpired or expired), Certificate of U.S. Citizenship (INS Form N-560 04 N- 561), Certificate of Naturalization (INS Form N-550 or N-570), unexpired foreign Passport with I-551 stamp or attached INS Form I-94 indicating unexpired employment authorization, an Alien Registration Receipt Card with photo (INS Form I-151 or I-551), unexpired Temporary Resident Card (INS Form I-688), unexpired Employment Authorization Card (INS Form I-688A), unexpired Reentry Permit (INS Form I-327), unexpired Refugee Travel Document (INS Form I-571), or unexpired Employment Authorization Documentation issued by the INS which contains a photograph (INS Form I-688B) to the LRN Point of Contact, Contract Specialist J.W. Purcell, who will forward the documents to the LRN-SM mailbox (dll-celrn-sm@usace.army.mil) for approval. These documents must be submitted seventeen (17) days prior to the site visit. FN requests require approval at the Headquarters U.S. Army Corps of Engineers (HQUSACE) level. Exceptions will be considered on a case by case basis but will be limited. The form is available as a pdf attachment on www.fbo.gov with this solicitation and is titled Foreign National Pre-Bid Meeting Request Form.

POINT-OF-CONTACT: For questions and /or concerns regarding the site visit, please contact Contract Specialist J.W. Purcell via email at the address referenced above.

This will be the only site visits for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel and time restrictions.

1.9 POC for Communication/Questions: Any communications regarding this procurement must be made in writing to the Nashville Contracting Branch, Attn: J.W. Purcell at email James.W.Purcell@usace.army.mil or facsimile: (615) 736-7124. Inquiries must identify the solicitation number, the requestor’s company name, address, email address, telephone and facsimile numbers to include area code.

Phone calls or requests to arrange meetings at the Nashville District during the solicitation period to discuss project requirements or company’s capabilities are highly discouraged and will not be scheduled.

QUESTIONS: Questions regarding the solicitation must be submitted to J.W. Purcell at email James.W.Purcell@usace.army.mil no later than 11:00 AM CT on July 25, 2017.

1.10 Amendments Prior to Date Set for Closing of Invitaion for Bid (IFB). The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for submission of bid. Such revisions and amendments, if any will be announced by an amendment or amendments to this IFB. If the revisions and amendments are of a nature which requires material changes in quantities or prices proposed or both, the date set for receipt of bids may be postponed by such number of days as in the opinion of the issuing officer will enable bidder to revise their bid. In such cases, the amendment will include an announcement of the new date for receipt of bid.

1.11 Determination of Responsibility Requirements:

http://www.lrn.usace.army.mil/BusinessWithUs/Contracting/ContractSecurityRequirements http://www.fbo.gov/ mailto:dll-celrn-sm@usace.army.mil http://www.fbo.gov/

a. To ensure award is made to a responsible bidder, a determination of responsibility will be conducted. As part of this responsibility determination, the Contracting Officer will utilize the guidance contained in FAR Subpart 9.1, Responsible Prospective Contractors. In accordance with FAR 9.104-1, to be determined responsible, a prospective contractor must:

(1) Have adequate financial resources to perform the contract, or the ability to obtain them;

(2) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;

(3) Have a satisfactory performance record, similar in scope and magnitude of that stated in the contract requirement;

(4) Have a satisfactory record of integrity and business ethics;

(5) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors);

(6) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and

(7) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

b. Definitive Responsibility Criteria. In addition to examining the criteria in FAR 9.104-1, the Contracting Officer will also examine whether the low bidder can meet the requirements of four (4) definitive responsibility criteria. The apparent low bidder will be required to meet the following experience requirements:

(1) Within the past ten years, have experience…