Base
| Chickamauga Lock Chamber, W912P5-17-B-0001 | ||||||
| Base Bid Schedule | ||||||
| Concrete Batch Plant | ||||||
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0102-00 | Mobilization and Demobilization - Batch Plant | 01 22 00 | 1 | Job | $ | $ |
| 0105-00 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-00 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
BASE ESTIMATED AMOUNT $
Page &P of &N
Option 1
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 1 Bid Schedule |
| Conveyor, Testing Facilities, QA Facilities |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0103-01 | Mobilization and Demobilization - Conveyor | 01 22 00 | 1 | Job | $ | $ |
| 0104-01 | Mobilization and Demobilization - QA Testing Lab and Field Office | 01 22 00 | 1 | Job | $ | $ |
| 0105-01 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-01 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-01 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 5 | MO | $ | $ |
OPTION 1 ESTIMATED AMOUNT $
Option 2
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 2 Bid Schedule |
| Mobilization, Remaining Excavation, Dental Excavation and Concrete, Rock Bolts, Shotcrete |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0101-02 | Mobilization and Demobilization - General | 01 22 00 | 1 | Job | $ | $ |
| 0105-02 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-02 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-02 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 1 | MO | $ | $ |
| 0108-02 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ |
| 02 | Div 02; Existing Conditions | |||||
| DEMOLITION | ||||||
| 0201-02 | Demolish Spillway Apron | 02 41 17 | 1 | Job | $ | $ |
| 03 | Div 03; Concrete | |||||
| 0303-02 | Reinforcing Steel - Material | 03 20 02 | 2.5 | TON | $ | $ |
| 0311-02 | Cement, Type II, MH - Low Alkali | 03 30 01 | 1,390.0 | TON | $ | $ |
| 0313-02 | Class F Fly Ash | 03 30 01 | 540.0 | TON | $ | $ |
| 0325-02 | Shotcrete Placement (4") | 03 37 13 | 1,120.0 | SY | $ | $ |
| 13 | Div 13; Special Construction | |||||
| 1301-02 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ |
| 31 | Div 31; Earthwork | |||||
| EXCAVATION | ||||||
| 3104-02 | Dental Excavation | 31 23 05 | 10,000.0 | CY | $ | $ |
| 3105-02 | Dental Concrete | 31 23 05 | 10,000.0 | CY | $ | $ |
| 3106-02 | Rock Excavation | 31 23 05 | 9,900.0 | CY | $ | $ |
| 3107-02 | Pre-Splitting | 31 23 06 | 2,700.0 | LF | $ | $ |
| 3108-02 | Line Drilling (6" spacing) | 31 23 06 | 11,200.0 | LF | $ | $ |
| 3110-02 | Preliminary Clean-Ups | 31 60 00 | 19,350.0 | SY | $ | $ |
| 3112-02 | Rock Bolts (Grouted) | 31 68 13 | 1,900.0 | LF | $ | $ |
| 32 | Div 32; Exterior Improvements | |||||
| SITE DEVELOPMENT | ||||||
| 3215-02 | Temporary Seeding | 32 92 19 | 5 | ACR | $ | $ |
OPTION 2 ESTIMATED AMOUNT $
Option 3
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 3 Bid Schedule |
| Mobilization, Foundation Prep, Mud Mat, Drilled Shaft |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0101-03 | Mobilization and Demobilization - General | 01 22 00 | 1 | Job | $ | $ |
| 0105-03 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-03 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-03 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 5 | MO | $ | $ |
| 0108-03 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ |
| 03 | Div 03; Concrete | |||||
| 0303-03 | Reinforcing Steel - Material | 03 20 02 | 58.0 | TON | $ | $ |
| 0304-03 | Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete | 03 20 02 | 58.0 | TON | $ | $ |
| 0311-03 | Cement, Type II, MH - Low Alkali | 03 30 01 | 286.0 | TON | $ | $ |
| 0313-03 | Class F Fly Ash | 03 30 01 | 148.0 | TON | $ | $ |
| 0315-03 | Structural Concrete (5ksi) | 03 70 00 | 1,180.0 | CY | $ | $ |
| 0318-03 | Miscellaneous Concrete (4ksi) | 03 70 01 | 150.0 | CY | $ | $ |
| 05 | Div 05; Metals | |||||
| 0501-03 | Miscellaneous Metal (Check Post, Ladder, Line Hook, Grate, Hatch, Frame, HM Doors, Embedded Metals) | 05 50 15 | 1 | Job | $ | $ |
| 0502-03 | Wall Armor (Excluding Approach Wall Beams) | 05 50 15 | 1 | Job | $ | $ |
| 13 | Div 13; Special Construction | |||||
| 1301-03 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ |
| 31 | Div 31; Earthwork | |||||
| EXCAVATION | ||||||
| 3109-03 | Clean and Backfill Exploratory Holes | 31 32 23 | 200.0 | CF | $ | $ |
| 3110-03 | Preliminary Clean-Ups | 31 60 00 | 19,380.0 | SY | $ | $ |
| 3111-03 | Foundation Preparation | 31 60 00 | 19,400.0 | SY | $ | $ |
| PILES & DRILLED SHAFTS FOR LOCK WALL | ||||||
| 3124-03 | 74" Drilled Shaft (Riverward) | 31 63 26 | 722.0 | LF | $ | $ |
| 3125-03 | 54" Drilled Shaft (Landward) | 31 63 26 | 558.0 | LF | $ | $ |
| 33 | Div 33; Utilities | |||||
| 3313-03 | Grounding | 33 70 02 | 1 | Job | $ | $ |
OPTION 3 ESTIMATED AMOUNT $
Option 4
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 4 Bid Schedule |
| Landwall Concrete from foundation to 5ft above culvert (EL631.5) |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0105-04 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-04 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-04 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 2 | MO | $ | $ |
| 0108-04 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ |
| 03 | Div 03; Concrete | |||||
| 0301-04 | Waterstop | 03 15 14 | 1 | Job | $ | $ |
| 0302-04 | 2" LDPE Foam Expansion Joint | 03 15 14 | 500.0 | SF | $ | $ |
| 0303-04 | Reinforcing Steel - Material | 03 20 02 | 908.1 | TON | $ | $ |
| 0304-04 | Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete | 03 20 02 | 908.1 | TON | $ | $ |
| 0306-04 | Segmental Cofferdam Dowels (#6, #8, #9, #10) | 03 20 02 | 1,815 | EA | $ | $ |
| 0307-04 | Drill and Grout #6 Dowels; Waterstop Recess | 03 20 02 | 15 | EA | $ | $ |
| 0309-04 | Drill and Grout #9 Dowels; Blocks 45 & 46 | 03 20 02 | 20 | EA | $ | $ |
| 0310-04 | Drill and Grout #11 Dowels; Spillway | 03 20 02 | 265 | EA | $ | $ |
| 0311-04 | Cement, Type II, MH - Low Alkali | 03 30 01 | 4,098.0 | TON | $ | $ |
| 0313-04 | Class F Fly Ash | 03 30 01 | 1,600.0 | TON | $ | $ |
| 0315-04 | Structural Concrete (5ksi) | 03 70 00 | 17,308.0 | CY | $ | $ |
| 0316-04 | Mass Concrete (3ksi) | 03 70 00 | 17,713.0 | CY | $ | $ |
| 0318-04 | Miscellaneous Concrete (4ksi) | 03 70 01 | 150.0 | CY | $ | $ |
| 0322-04 | Roughen Cofferdam Surface | 03 30 04 | 10,267.0 | SF | $ | $ |
| 05 | Div 05; Metals | |||||
| 0507-04 | Culvert Liners | 05 50 15 | 1 | Job | $ | $ |
| 13 | Div 13; Special Construction | |||||
| 1301-04 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ |
| 22 | Div 22; Plumbing | |||||
| 2201-04 | Miscellaneous Embedded Plumbing Components | 22 00 00 | 1 | Job | $ | $ |
| 33 | Div 33; Utilities | |||||
| 3301-04 | Miscellaneous Embedded Utilities Components | 33 30 00 | 1 | Job | $ | $ |
| 3313-04 | Grounding | 33 70 02 | 1 | Job | $ | $ |
OPTION 4 ESTIMATED AMOUNT $
Option 5
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 5 Bid Schedule |
| Upper Riverwall Concrete from foundation to 5ft above culvert (EL631.5) |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0105-05 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-05 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-05 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 6 | MO | $ | $ |
| 0108-05 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ |
| 03 | Div 03; Concrete | |||||
| 0301-05 | Waterstop | 03 15 14 | 1 | Job | $ | $ |
| 0302-05 | 2" LDPE Foam Expansion Joint | 03 15 14 | 500.0 | SF | $ | $ |
| 0303-05 | Reinforcing Steel - Material | 03 20 02 | 534.9 | TON | $ | $ |
| 0304-05 | Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete | 03 20 02 | 534.9 | TON | $ | $ |
| 0307-05 | Drill and Grout #6 Dowels; Waterstop Recess | 03 20 02 | 15 | EA | $ | $ |
| 0310-05 | Drill and Grout #11 Dowels; Spillway | 03 20 02 | 265 | EA | $ | $ |
| 0311-05 | Cement, Type II, MH - Low Alkali | 03 30 01 | 2,887.0 | TON | $ | $ |
| 0313-05 | Class F Fly Ash | 03 30 01 | 1,129.0 | TON | $ | $ |
| 0315-05 | Structural Concrete (5ksi) | 03 70 00 | 8,903.0 | CY | $ | $ |
| 0316-05 | Mass Concrete (3ksi) | 03 70 00 | 17,277.0 | CY | $ | $ |
| 0318-05 | Miscellaneous Concrete (4ksi) | 03 70 01 | 150.0 | CY | $ | $ |
| 05 | Div 05; Metals | |||||
| 0507-05 | Culvert Liners | 05 50 15 | 1 | Job | $ | $ |
| 13 | Div 13; Special Construction | |||||
| 1301-05 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ |
| 22 | Div 22; Plumbing | |||||
| 2201-05 | Miscellaneous Embedded Plumbing Components | 22 00 00 | 1 | Job | $ | $ |
| 33 | Div 33; Utilities | |||||
| 3301-05 | Miscellaneous Embedded Utilities Components | 33 30 00 | 1 | Job | $ | $ |
| 3313-05 | Grounding | 33 70 02 | 1 | Job | $ | $ |
OPTION 5 ESTIMATED AMOUNT $
Option 6
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 6 Bid Schedule |
| Lower Riverwall Concrete from foundation to 5ft above culvert (EL631.5), Grouting |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0105-06 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-06 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-06 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 1 | MO | $ | $ |
| 0108-06 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ |
| 03 | Div 03; Concrete | |||||
| 0301-06 | Waterstop | 03 15 14 | 1 | Job | $ | $ |
| 0302-06 | 2" LDPE Foam Expansion Joint | 03 15 14 | 500.0 | SF | $ | $ |
| 0303-06 | Reinforcing Steel - Material | 03 20 02 | 499.7 | TON | $ | $ |
| 0304-06 | Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete | 03 20 02 | 499.7 | TON | $ | $ |
| 0307-06 | Drill and Grout #6 Dowels; Waterstop Recess | 03 20 02 | 15 | EA | $ | $ |
| 0311-06 | Cement, Type II, MH - Low Alkali | 03 30 01 | 4,135.0 | TON | $ | $ |
| 0313-06 | Class F Fly Ash | 03 30 01 | 3,449.0 | TON | $ | $ |
| 0315-06 | Structural Concrete (5ksi) | 03 70 00 | 13,467.0 | CY | $ | $ |
| 0316-06 | Mass Concrete (3ksi) | 03 70 00 | 23,696.0 | CY | $ | $ |
| 0318-06 | Miscellaneous Concrete (4ksi) | 03 70 01 | 150.0 | CY | $ | $ |
| 05 | Div 05; Metals | |||||
| 0507-06 | Culvert Liners | 05 50 15 | 1 | Job | $ | $ |
| 13 | Div 13; Special Construction | |||||
| 1301-06 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ |
| 22 | Div 22; Plumbing | |||||
| 2201-06 | Miscellaneous Embedded Plumbing Components | 22 00 00 | 1 | Job | $ | $ |
| 31 | Div 31; Earthwork | |||||
| GROUTING | ||||||
| 3133-06 | Drill Grout Holes in Rock | 31 32 23 | 23,884.0 | LF | $ | $ |
| 3134-06 | Pressure Washing (Hydraulic) | 31 32 23 | 178.0 | HR | $ | $ |
| 3135-06 | Pressure Testing (Hydraulic) | 31 32 23 | 701 | EA | $ | $ |
| 3136-06 | Portland Cement in Grout | 31 32 23 | 20,474 | BAG | $ | $ |
| 3137-06 | Grouting Connections | 31 32 23 | 807 | EA | $ | $ |
| 3138-06 | Placing Grout | 31 32 23 | 55,988.0 | CF | $ | $ |
| 3139-06 | Government Requested Standby - Grouting | 31 32 23 | 230.0 | HR | $ | $ |
| 3140-06 | Televiewer Survey | 31 32 23 | 2,195.0 | LF | $ | $ |
| 3141-06 | Verification Core Drilling | 31 32 23 | 1,463.0 | LF | $ | $ |
| 3142-06 | Re-Drill Grout Holes in Rock | 31 32 23 | 2,002.0 | LF | $ | $ |
| 33 | Div 33; Utilities | |||||
| 3301-06 | Miscellaneous Embedded Utilities Components | 33 30 00 | 1 | Job | $ | $ |
| 3313-06 | Grounding | 33 70 02 | 1 | Job | $ | $ |
OPTION 6 ESTIMATED AMOUNT $
Option 7
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 7 Bid Schedule |
| Landwall Concrete from EL 631.5 to EL 645 |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0105-07 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-07 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-07 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 1 | MO | $ | $ |
| 0108-07 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ |
| 03 | Div 03; Concrete | |||||
| 0301-07 | Waterstop | 03 15 14 | 1 | Job | $ | $ |
| 0302-07 | 2" LDPE Foam Expansion Joint | 03 15 14 | 500.0 | SF | $ | $ |
| 0303-07 | Reinforcing Steel - Material | 03 20 02 | 210.8 | TON | $ | $ |
| 0304-07 | Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete | 03 20 02 | 210.8 | TON | $ | $ |
| 0307-07 | Drill and Grout #6 Dowels; Waterstop Recess | 03 20 02 | 15 | EA | $ | $ |
| 0311-07 | Cement, Type II, MH - Low Alkali | 03 30 01 | 2,324.0 | TON | $ | $ |
| 0313-07 | Class F Fly Ash | 03 30 01 | 830.0 | TON | $ | $ |
| 0315-07 | Structural Concrete (5ksi) | 03 70 00 | 791.0 | CY | $ | $ |
| 0316-07 | Mass Concrete (3ksi) | 03 70 00 | 17,193.0 | CY | $ | $ |
| 0318-07 | Miscellaneous Concrete (4ksi) | 03 70 01 | 150.0 | CY | $ | $ |
| 0322-07 | Roughen Cofferdam Surface | 03 30 04 | 10,166.0 | SF | $ | $ |
| 13 | Div 13; Special Construction | |||||
| 1301-07 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ |
| 22 | Div 22; Plumbing | |||||
| 2201-07 | Miscellaneous Embedded Plumbing Components | 22 00 00 | 1 | Job | $ | $ |
| 33 | Div 33; Utilities | |||||
| 3301-07 | Miscellaneous Embedded Utilities Components | 33 30 00 | 1 | Job | $ | $ |
| 3313-07 | Grounding | 33 70 02 | 1 | Job | $ | $ |
OPTION 7 ESTIMATED AMOUNT $
Option 8
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 8 Bid Schedule |
| Riverwall Concrete EL 631.5 to EL 660 |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0105-08 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-08 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-08 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 2 | MO | $ | $ |
| 0108-08 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ |
| 03 | Div 03; Concrete | |||||
| 0301-08 | Waterstop | 03 15 14 | 1 | Job | $ | $ |
| 0302-08 | 2" LDPE Foam Expansion Joint | 03 15 14 | 500.0 | SF | $ | $ |
| 0303-08 | Reinforcing Steel - Material | 03 20 02 | 411.9 | TON | $ | $ |
| 0304-08 | Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete | 03 20 02 | 411.9 | TON | $ | $ |
| 0307-08 | Drill and Grout #6 Dowels; Waterstop Recess | 03 20 02 | 15 | EA | $ | $ |
| 0311-08 | Cement, Type II, MH - Low Alkali | 03 30 01 | 4,389.0 | TON | $ | $ |
| 0313-08 | Class F Fly Ash | 03 30 01 | 1,682.0 | TON | $ | $ |
| 0315-08 | Structural Concrete (5ksi) | 03 70 00 | 920.0 | CY | $ | $ |
| 0316-08 | Mass Concrete (3ksi) | 03 70 00 | 43,530.0 | CY | $ | $ |
| 0318-08 | Miscellaneous Concrete (4ksi) | 03 70 01 | 150.0 | CY | $ | $ |
| 13 | Div 13; Special Construction | |||||
| 1301-08 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ |
| 22 | Div 22; Plumbing | |||||
| 2201-08 | Miscellaneous Embedded Plumbing Components | 22 00 00 | 1 | Job | $ | $ |
| 33 | Div 33; Utilities | |||||
| 3301-08 | Miscellaneous Embedded Utilities Components | 33 30 00 | 1 | Job | $ | $ |
| 3313-08 | Grounding | 33 70 02 | 1 | Job | $ | $ |
OPTION 8 ESTIMATED AMOUNT $
Option 9
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 9 Bid Schedule |
| Remainder of Concrete including Handrail, Instrumentation, Access Bridge Installation, Misc Work |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0105-09 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-09 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-09 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 9 | MO | $ | $ |
| 0108-09 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ |
| 03 | Div 03; Concrete | |||||
| 0301-09 | Waterstop | 03 15 14 | 1 | Job | $ | $ |
| 0302-09 | 2" LDPE Foam Expansion Joint | 03 15 14 | 500.0 | SF | $ | $ |
| 0303-09 | Reinforcing Steel - Material | 03 20 02 | 1,760.8 | TON | $ | $ |
| 0304-09 | Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete | 03 20 02 | 1,760.8 | TON | $ | $ |
| 0306-09 | Segmental Cofferdam Dowels (#6, #8, #9, #10) | 03 20 02 | 1,815.0 | EA | $ | $ |
| 0307-09 | Drill and Grout #6 Dowels; Waterstop Recess | 03 20 02 | 15 | EA | $ | $ |
| 0309-09 | Drill and Grout #9 Dowels; Blocks 45 & 46 | 03 20 02 | 20 | EA | $ | $ |
| 0310-09 | Drill and Grout #11 Dowels; Spillway | 03 20 02 | 530 | EA | $ | $ |
| 0311-09 | Cement, Type II, MH - Low Alkali | 03 30 01 | 7,463.0 | TON | $ | $ |
| 0312-09 | Cement, Type I/II - Low Alkali | 03 30 01 | 1.2 | TON | $ | $ |
| 0313-09 | Class F Fly Ash | 03 30 01 | 2,849.0 | TON | $ | $ |
| 0315-09 | Structural Concrete (5ksi) | 03 70 00 | 849.0 | CY | $ | $ |
| 0316-09 | Mass Concrete (3ksi) | 03 70 00 | 74,738.5 | CY | $ | $ |
| 0318-09 | Miscellaneous Concrete (4ksi) | 03 70 01 | 15.0 | CY | $ | $ |
| 0319-09 | Precast Concrete | 03 41 33 | 1 | Job | $ | $ |
| 0322-09 | Roughen Cofferdam Surface | 03 30 04 | 12,464.0 | SF | $ | $ |
| 05 | Div 05; Metals | |||||
| 0503-09 | Handrail (Project Wide) | 05 50 15 | 1 | Job | $ | $ |
| 0505-09 | Culvert Intake Trashracks | 05 50 15 | 1 | Job | $ | $ |
| 0506-09 | Spillway Operating Deck Access Stairway | 05 51 00 | 1 | Job | $ | $ |
| 10 | Div 10; Specialties | |||||
| 1001-09 | Permanent Exterior Signage | 10 14 01 | 1 | Job | $ | $ |
| 13 | Div 13; Special Construction | |||||
| 1301-09 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ |
| 22 | Div 22; Plumbing | |||||
| 2201-09 | Miscellaneous Embedded Plumbing Components | 22 00 00 | 1 | Job | $ | $ |
| 32 | Div 32; Exterior Improvements | |||||
| SITE DEVELOPMENT | ||||||
| 3215-09 | Temporary Seeding | 32 92 19 | 5.0 | ACR | $ | $ |
| PRE-FABRICATED BRIDGES | ||||||
| 3218-09 | Install Downstream Prefabricated Bridge | 32 34 30 | 1 | Job | $ | $ |
| 3219-09 | Install Upstream Prefabricated Bridge | 32 34 30 | 1 | Job | $ | $ |
| 33 | Div 33; Utilities | |||||
| 3301-09 | Miscellaneous Embedded Utilities Components | 33 30 00 | 1 | Job | $ | $ |
| 3313-09 | Grounding | 33 70 02 | 1 | Job | $ | $ |
OPTION 9 ESTIMATED AMOUNT $
Option 10
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 10 Bid Schedule |
| Installation of Culvert Valves and Miter Gates including machinery and second pour concrete |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0105-10 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-10 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-10 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 7 | MO | $ | $ |
| 0108-10 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ |
| 03 | Div 03; Concrete | |||||
| 0303-10 | Reinforcing Steel - Material | 03 20 02 | 36.0 | TON | $ | $ |
| 0305-10 | Place Rebar for 2nd Stage Concrete | 03 20 02 | 36.0 | TON | $ | $ |
| 0312-10 | Cement, Type I/II - Low Alkali | 03 30 01 | 54.0 | TON | $ | $ |
| 0317-10 | 2nd Stage Concrete (5ksi) | 03 80 00 | 1,000.0 | CY | $ | $ |
| 0321-10 | Concrete Block - Monolith M1 at Pier 2 | 03 80 00 | 1 | Job | $ | $ |
| 05 | Div 05; Metals | |||||
| 0504-10 | Caisson and Stoplog Recess Fillers | 05 50 15 | 1 | Job | $ | $ |
| 13 | Div 13; Special Construction | |||||
| 1301-10 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ |
| 22 | Div 22; Plumbing | |||||
| 2202-10 | Service Water System | 22 00 00 | 1 | Job | $ | $ |
| 2203-10 | Compressed Air System | 22 15 09 | 1 | Job | $ | $ |
| 2204-10 | Drainage Systems (Gallery) | 22 00 00 | 1 | Job | $ | $ |
| 2205-10 | Gate Spray System | 22 00 00 | 1 | Job | $ | $ |
| 35 | Div 35; Waterway & Marine Const | |||||
| 3501-10 | Install Miter Gates Embedded Metals | 35 20 17 | 1 | Job | $ | $ |
| 3502-10 | Install Miter Gates | 35 20 17 | 1 | Job | $ | $ |
| 3503-10 | Floating Mooring Bitts | 35 59 29 | 12 | EA | $ | $ |
| 3504-10 | Culvert Valve Operating Machinery and Embedded Metals | 35 20 18 | 1 | Job | $ | $ |
| 3505-10 | Install Culvert Valve, Trunnion, and Embedded Metals | 35 20 18 | 1 | Job | $ | $ |
| 3506-10 | Install Culvert Valve Bulkhead, and Embeddd Metals | 35 20 18 | 1 | Job | $ | $ |
| 3508-10 | Miter Gate Operating Machinery and Embedded Metals | 35 20 18 | 1 | Job | $ | $ |
| 41 | Div 41; Matl Process/Handling Equipment | |||||
| 4101-10 | Lock Hydraulic System | 41 24 27 | 1 | Job | $ | $ |
OPTION 10 ESTIMATED AMOUNT $
Option 11
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 11 Bid Schedule |
| Operations Building, Control Shelters, Electrical and small Mechanical Items |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | ||||||
| 0105-11 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ | |
| 0106-11 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ | |
| 0107-11 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 5 | MO | $ | $ | |
| 0108-11 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ | |
| 13 | Div 13; Special Construction | ||||||
| 1301-11 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ | |
| 22 | Div 22; Plumbing | $ | $ | ||||
| 2202-11 | Service Water System | 22 00 00 | 1 | Job | $ | $ | |
| 2203-11 | Compressed Air System | 22 15 09 | 1 | Job | $ | $ | |
| 2204-11 | Drainage Systems (Gallery) | 22 00 00 | 1 | Job | $ | $ | |
| 2205-11 | Gate Spray System | 22 00 00 | 1 | Job | $ | $ | |
| 23 | Div 23; Heat, Vent & Air Cond | ||||||
| 2301-11 | HVAC Systems | 23 00 00 | 1 | Job | $ | $ | |
| 26 | Div 26; Electrical | ||||||
| 2601-11 | Electrical Power Equipment | 26 20 00 | 1 | Job | $ | $ | |
| 2602-11 | General Electrical Work | 26 20 00 | 1 | Job | $ | $ | |
| 2603-11 | Lock and Gallery Lighting | 26 56 00 | 1 | Job | $ | $ | |
| 27 | Div 27; Communications | ||||||
| 2701-11 | Fiber Optic Data Transmission System | 27 21 10 | 1 | Job | $ | $ | |
| 2702-11 | Building Telecommunications Cabling System | 27 10 00 | 1 | Job | $ | $ | |
| 28 | Div 28; Elec Safety & Security | ||||||
| 2801-11 | Lock Operations CCTV System | 28 23 23 | 1 | Job | $ | $ | |
| 2802-11 | Security IDS and CCTV System | 28 20 01 | 1 | Job | $ | $ | |
| 2803-11 | Fire Detection System | 28 31 64 | |||||
| 28 31 00 | 1 | Job | $ | $ | |||
| 35 | Div 35; Waterway & Marine Const | ||||||
| 3507-11 | Tow Haulage System | 35 11 50 | 1 | Job | $ | $ | |
| 3509-11 | Lock Operations Building | 01 22 00 | 1 | Job | $ | $ | |
| 40 | Div 40; Process Integration | ||||||
| 4001-11 | Lock Control System | 40 95 00 | 1 | Job | $ | $ | |
| 41 | Div 41; Matl Process/Handling Equipment | ||||||
| 4101-11 | Lock Hydraulic System | 41 24 27 | 1 | Job | $ | $ |
OPTION 11 ESTIMATED AMOUNT $
Option 12
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 12 Bid Schedule |
| Bay 5 Shear Wall |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0105-12 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-12 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-12 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 1 | MO | $ | $ |
| 0108-12 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ |
| 03 | Div 03; Concrete | |||||
| 0301-12 | Waterstop | 03 15 14 | 1 | Job | $ | $ |
| 0303-12 | Reinforcing Steel - Material | 03 20 02 | 33.6 | TON | $ | $ |
| 0304-12 | Place Rebar for Monolith, Structural, Mass, and Miscellaneous Concrete | 03 20 02 | 33.6 | TON | $ | $ |
| 0311-12 | Cement, Type II, MH - Low Alkali | 03 30 01 | 229.4 | TON | $ | $ |
| 0313-12 | Class F Fly Ash | 03 30 01 | 89.1 | TON | $ | $ |
| 0315-12 | Structural Concrete (5ksi) | 03 70 00 | 1,650.0 | CY | $ | $ |
| 13 | Div 13; Special Construction | |||||
| 1301-12 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ |
| 31 | Div 31; Earthwork | |||||
| BAY 5 STRAND ANCHORS | ||||||
| 3126-12 | Furnish and Install Post Tensioned Anchors | 31 68 15 | 3,040.0 | LF | $ | $ |
| 3127-12 | Additional Performance Tests | 31 68 15 | 3 | EA | $ | $ |
| 3128-12 | Additional Proof Tests | 31 68 15 | 3 | EA | $ | $ |
| 3129-12 | Additional Watertightness Testing | 31 68 15 | 16 | EA | $ | $ |
| 3130-12 | Consolidation Grouting | 31 68 15 | 1,259.0 | CF | $ | $ |
| 3131-12 | Redrilling Consolidation Grout | 31 68 15 | 1,952.0 | LF | $ | $ |
| 3132-12 | Government Requested Standby - Consolidation Grouting | 31 68 15 | 32.0 | HR | $ | $ |
OPTION 12 ESTIMATED AMOUNT $
Option 13
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Option 13 Bid Schedule |
| Commissioning of the new lock & Breach (including Care & Diversion of Water) |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| 01 | Div 01; General Requirements | |||||
| 0105-13 | Premiums for Performance and Payment Bonds | 01 22 00 | 1 | Job | $ | $ |
| 0106-13 | Maintenance and Protection of Traffic | 01 50 00 | 1 | Job | $ | $ |
| 0107-13 | Maintain Testing Lab and COE Field Offices | 01 50 00 | 3 | MO | $ | $ |
| 0108-13 | Diversion and Care of Water | 01 57 24 | 1 | Job | $ | $ |
| 0109-13 | Commissioning | 01 91 13 | 1 | Job | $ | $ |
| 13 | Div 13; Special Construction | |||||
| 1301-13 | Instrumentation Program | 13 50 00 | 1 | Job | $ | $ |
| 40 | Div 40; Process Integration | |||||
| 4001-13 | Lock Control System | 40 95 00 | 1 | Job | $ | $ |
OPTION 13 ESTIMATED AMOUNT $
Summary
| Chickamauga Lock Chamber, W912P5-17-B-0001 |
| Bid Schedule Summary |
| BID ITEM | DESCRIPTION | SPECIFICATION NUMBER | EST. QTY. | UNIT | UNIT | |
| PRICE | ESTIMATED |
AMOUNT
| BASE ESTIMATED AMOUNT | $ |
| OPTION 1 ESTIMATED AMOUNT | $ |
| OPTION 2 ESTIMATED AMOUNT | $ |
| OPTION 3 ESTIMATED AMOUNT | $ |
| OPTION4 ESTIMATED AMOUNT | $ |
| OPTION 5 ESTIMATED AMOUNT | $ |
| OPTION 6 ESTIMATED AMOUNT | $ |
| OPTION 7 ESTIMATED AMOUNT | $ |
| OPTION 8 ESTIMATED AMOUNT | $ |
| OPTION 9 ESTIMATED AMOUNT | $ |
| OPTION 10 ESTIMATED AMOUNT | $ |
| OPTION 11 ESTIMATED AMOUNT | $ |
| OPTION 12 ESTIMATED AMOUNT | $ |
| OPTION 13 ESTIMATED AMOUNT | $ |
TOTAL ESTIMATED AMOUNT (BASE+ALL OPTIONS) $