Text version
.59
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
27 June 2017
USACE - Nashville District
Adam Walker, Project Manager
J.W. Purcell, Contract Specialist
Britt Henderson, Civil Engineer
CHICKAMAUGA LOCK REPLACEMENT
LOCK CHAMBER CONTRACT
PRE-BID SITE VISIT
File Name
Information as of 19 June 2017
Solicitation number: W912P5-17-B-0001
AGENDA
• Welcome
• Corps/TVA Personnel Introductions
• Total Project Overview
• Lock Chamber Contract
– Contract Information
– Design Features
• Site Visit
• Discussion
CHICKAMAUGA LOCK REPLACEMENT
• Continued degradation of the existing lock necessitates a Replacement Lock - Potential to cutoff 318 navigable river miles.
• New 110 ft x 600 ft lock will pass 9 barges per lockage as opposed to the existing 60 ft x 360 ft lock’s 1 barge per lockage.
PROJECT FUNDING
Project is funded 50% Inland Waterways Trust Fund (IWTF) and 50% Federal Appropriations. IWTF revenues generated from tax on marine diesel fuel.
4th highest priority construction project for IWTF funding.
Project received no funding in FY12-FY14, due to funding constraints of IWTF.
Changes occurred in 2014 that strengthened the IWTF.
WRDA 2014 – Increased diesel fuel fee from $0.20 to
$0.29/gallon Olmsted Dam cost share changed from 50/50 to 85/15
PROJECT FUNDING (CONTINUED)
Like many inland navigation projects, Chickamauga is not currently eligible for the President’s Budget due to Benefit- Cost Ratio requirements.
Project has received funding through Corps of Engineer Work Plans or “Funding Pots” (typically received in the April-May timeframe of Fiscal Year):
• FY15 = $3.0M
• FY16 = $29.9M (Capability = $29.9M)
• FY17 = $37.0M (Capability = $37.0M)
Lock Chamber - contract award anticipated for September
2017 (FY17).
LOCK REPLACEMENT PROJECT – FEBRUARY 2017 7
Disposal Area
Existing Lock Cofferdam
Road & Bridges - $6M Completed Feb 2007
Cofferdam - $86M Awarded Sep 2006, Comp 2012
Lock Chamber Award anticipated: Sep ‘17
Lock & Associated Facilities $749M Road and Bridges 6M
Total $755M
$211M Obl thru FY 16 = 28% completed
Bridge Fabrication - $400K Completed June 2011
Gates & Valves - $17M Awarded Sep 2009, Comp 2012
Cofferdam Stabilization - $3.1M Awarded Sep 2015, Comp 2016
Lock Excavation - $33.2M Sep ’16 Award Base and 2 Options at $26M.
Approach Walls Award anticipated: ??Sep ’21
Approach Beams - $14M Awarded Apr 2010, Comp 2013
Decommissioning/Site Work Award anticipated: ??Sep ’20
CHICKAMAUGA LOCK REPLACEMENT
LOCK CHAMBER CONTRACT - DESIGN FEATURES
Miter Gates, Culvert Valves, and Bulkheads
CHICKAMAUGA LOCK
Current Construction Contract – Lock Excavation
44 Inclined Rock Strand Anchors
51’ Long Secant Pile Ret. Wall
Rock Excavation
- Contract Award Sep 2016 – total contract amount $33.2M
- Base and 2 of 8 Options exercised in FY16 (~$26M)
- ~2 year Contract duration.
LOCK EXCAVATION CONTRACT – 9 JUNE 2017 11
Complete lock features located inside Cofferdam
- Contract Award - Sep 2017
- Contract - Base with 13 Options
LOCK CHAMBER CONTRACT
LOCK CHAMBER – CONTRACT INFORMATION
• Procurement Information
• Full and Open Competition
• IFB for Heavy Construction
• Magnitude of $250M - $500M
• Solicitation Date: 19 June 2017
• Bid Opening: 23 Aug 2017 (10:00 A.M. Central Time)
• Anticipated Award: September 2017
• Based on total price of Base and all Options
• Deadline for Questions – 14 July 2017
• Definitive Requirement Criteria – see Section 00100
(para 1.11)
• Questions and Comments Email: James.W.Purcell@usace.army.mil
LOCK CHAMBER - CONTRACT INFORMATION (CON’T)
• Other Pertinent Information
• Partnering meetings are included in contract
• Options may be exercised in any order
• Notice to Proceed
• Base and Option 1: Upon initial award/exercise
• Options 2 – 13: Upon completion of Lock Excavation contract
• Industry Day (Mar 2017) - Discussion
• Variable Period of Performance - Minimized
• Economic Price Adjustment Clauses – Research determined including clauses was not warranted.
LOCK CHAMBER CONTRACT - PERIOD OF PERFORMANCE
Information as of 19 June 2017
1. Contract Option #
2. Additional days added to contract
3. If option is exercised:
4. Additional days added to contract2
Base 337 N/A 1 164 N/A 2 119 N/A 3 112 N/A 4 70 N/A 5 51 N/A 6 70 N/A 7 38 N/A 8 82 N/A 9 287 N/A 10 386 N/A 11 154 W/in 30 Days of Opt.10
12 0 W/in 30 Days of Opt. 2-11
13 83 N/A
OPTION EXPIRATION DATES
Information as of 19 June 2017
1. Contract Option # 2. Anticipated Date Option Must Be Exercised By:
1 30 Sept 2018 2 30 Sept 2018 3 30 Sept 2019 4 30 Sept 2020 5 30 Sept 2020 6 30 Sept 2021 7 30 Sept 2021 8 30 Sept 2021 9 30 Sept 2022 10 30 Sept 2022 11 30 Sept 2022 12 30 Sept 2022 13 30 Sept 2023
Note: Options may not be exercised sequentially.
General Information
LOCK CHAMBER CONTRACT - PROJECT ORIENTATION
Upstream Downstream
Land Wall
River Wall
BASE AND OPTIONS
Base Concrete Batch Plant
Option 1 Conveyor, Testing Facilities, QA Facilities
Option 2 Mobilization, Excavation, Dental Concrete, Rock Bolts
Option 3 Mobilization, Foundation Prep, Mud Mat, Drilled Shafts
Option 4 Landwall Concrete from foundation to 5 ft above culvert (EL 631.5)
Option 5 Upper Riverwall Concrete from foundation to 5 ft above culvert (EL 631.5)
Option 6 Lower Riverwall Concrete from foundation to 5 ft above culvert (EL 631.5)
Option 7 Landwall Concrete from EL 631.5 to EL 645
Option 8 Riverwall Concrete from EL 631.5 to EL 660
Option 9 Remainder of Concrete including Handrail, Instrumentation, Access Bridge Installation, Misc Work
Option 10 Installation of Culvert Valves and Miter Gates including machinery and second pour concrete
Option 11 Operations Building, Control Shelters, Electrical and small Mechanical Items
Option 12 Bay 5 Shear Wall
Option 13 Commissioning of the new lock
Note: Options may not be exercised sequentially.
LOCK CHAMBER CONTRACT - OPTIONS
Concrete Sections
Monolith R5Monolith L5
Option 4
Option 5 & 6
Option 8
Option 7
Option 9
Construction Limits
LOCK CHAMBER CONTRACT –
INITIAL CONSTRUCTION LIMITS UNTIL LOCK
EXCAVATION CONTRACT IS COMPLETE
Contractor Area Restricted Area
Drilled Shafts
Excavation
LOCK REPLACEMENT PROJECT –
STILLING BASIN AREA
Tie-In with Existing Spillway
U-Frame Monolith - Concrete Sections
EXAMPLE OF U-FRAMED MONOLITHS
Photo of Kentucky Lock Addition Project
Concrete Sections
Monolith R5Monolith L5
Previously completed Segmental Cofferdam Wall
EXAMPLE OF TYPICAL MONOLITHS
Photo of Kentucky Lock Addition Project
Concrete Sections – Tie-in with Existing Segmental Cofferdam
Operations Building
Control Shelters
Operations Building
Bay 5 Shear Wall
Bay 5
Bay 5 Shear Wall
SITE VISIT – 27 JUNE 2017 (0900 TO ~1200 EDT)
CHICKAMAUGA LOCK AND DAM
PPE needed during site walk
SITE VISIT – 28 JUNE 2017 (0930-1130 CDT)
GOVERNMENT FURNISHED ITEMS @ MUSCLE SHOALS
Information as of 19 June 2017
TVA River Ops Storage Area 34°46'58.7"N 87°37'24.2"W
SITE VISIT – 29 JUNE 2017 (0900-1100 CDT)
J. PERCY PRIEST DAM - NASHVILLE
Information as of 19 June 2017
U.S. Army Corps of Engineers Regulatory Office 3701 Bell Road Nashville, TN 37214
DISCUSSION / Q&A SESSION TO
FOLLOW SITE WALK IN POWER
HOUSE.
| Chickamauga Lock Replacement�Lock Chamber Contract�Pre-Bid Site Visit |
| Agenda |
| Corps/TVA Personnel Introductions |
| Chickamauga Lock Replacement |
| Project Funding |
| Project Funding (continued) |
| Lock Replacement Project – February 2017 |
| Slide Number 8 |
| Slide Number 9 |
| Chickamauga Lock |
| Lock excavation contract – 9 June 2017 |
| Slide Number 12 |
| Lock Chamber – Contract Information |
| Lock Chamber - Contract Information (Con’t) |
| Lock Chamber contract - Period of Performance |
| Lock Chamber contract�Option Expiration Dates |
| Lock Chamber Contract - Design Features |
| Lock Chamber Contract - Project Orientation |
| Lock Chamber contract �Base and Options |
| Lock Chamber Contract - Options |
| Lock Chamber contract |
| Lock Chamber contract – �Initial Construction Limits until Lock Excavation contract is complete |
| Lock Chamber Contract - Design Features |
| Lock Chamber Contract - Design Features |
| Lock Replacement Project – �stilling basin area |
| Lock Chamber Contract - Design Features |
| Lock Chamber Contract - Design Features |
| Example of U-Framed Monoliths |
| Lock Chamber Contract - Design Features |
| Example of Typical Monoliths |
| Lock Chamber Contract - Design Features |
| Lock Chamber Contract - Design Features |
| Lock Chamber Contract - Design Features |
| Lock Chamber Contract - Design Features |
| Site Visit – 27 June 2017 (0900 to ~1200 EDT) �Chickamauga Lock and Dam |
| Slide Number 36 |
| Site Visit – 29 June 2017 (0900-1100 CDT)�J. Percy Priest Dam - Nashville |
| Discussion / Q&A Session To Follow Site walk in Power House. |