CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF25B000013
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Cima, California 92323, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration, Central Federal Lands Highway Division, solicited bids for road improvements across approximately 56.5 miles within Mojave National Preserve in San Bernardino County, California, with bids due and opened May 19, 2026. This is full and open competition with HUBZone price preference; no narrow set-aside applies.

Work encompasses full-depth reclamation and asphalt resurfacing of 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road, including roadway widening to a consistent 26 feet, reinforcement of 48 low-water crossings (11 on South Kelbaker, 37 on Kelso-Cima) with buried concrete barriers and riprap revetment, minor horizontal and vertical realignment in select areas, rumble strips, signing, pavement markings, and paved pullouts. Morningstar Mine Road receives full-depth reclamation with surface-course aggregate placement. Place of performance is Cima, California. The NAICS code is 237310, Highway, Street, and Bridge Construction; PSC is Y1LB.

The estimated cost range was $80 million to $120 million. Schedule A base work requires completion by June 26, 2028 (23 months from a planned Notice to Proceed of June 22, 2026); optional Schedules X and Y extend completion to August 21, 2028 and October 9, 2028, respectively. Liquidated damages are $7,600 per calendar day. Six contractors submitted responsive bids on May 19, 2026, ranging from Las Vegas Paving's low of $53,892,000 (Schedule A) to Steve Manning Construction's high of $93,313,165 (Schedule A), with an engineer's estimate of $70,722,000 (Schedule A).

The project is located in a natural resource–sensitive area subject to environmental constraints affecting construction scheduling and operations. Work requires desert tortoise barrier fence installation prior to ground-disturbing activities, biologist monitoring during the active tortoise season (March 1 through October 31), a 20-acre limit on simultaneous exposed soil, and Union Pacific Railroad flagging within 25 feet of tracks. Two equal 1.5-inch asphalt lifts (not a single 3-inch lift) are required. The FHWA is responsible for UPRR force account costs ($30,000–$60,000), Right of Entry fees, NDOT encroachment permits, and utility relocations. Contractors may reuse existing asphalt and aggregate as recycled material meeting Section 304 gradation. No temporary asphalt plant is permitted within the preserve, and no Commercial Use Authorization is required. Five amendments were issued between April 17 and May 13, 2026, addressing schedule modifications, bid item reclassifications, exposed soil acreage limits, tortoise fence sequencing, aggregate specifications, and removal of office trailer requirements.

Notice text

THIS IS AN INVITATION FOR BID – PLANS AND SPECIFICATIONS ARE AVAILABLE.

CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS

FULL AND OPEN COMPETITION WITH HUBZone PRICE PREFERENCE

PROJECT DETAILS:

The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access. Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road.

The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with riprap revetment.

The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection,

The estimated cost for the work is between $80,000,000 and $120,000,000.

The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations.  Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work.  Prior experience on projects of similar magnitude in is required.

Principle work items include:

110,000 tons of asphalt concrete pavement,

133,000 tons of roadway aggregate,

81,000 tons of aggregate surface course,

110,000 cubic yards of roadway excavation,

49 miles of full depth reclamation, method 2, 6-inch depth,

17,000 linear feet of concrete barrier (low water crossings),

44 miles of fence, tortoise barrier,

2,400 linear feet of tortoise crossing structure, and

12,000 cubic yards of rip rap

Files

File Type Posted
BidTabulationReport-Kelso Cima.pdf PDF
Bid Opening Summary.pdf PDF
Amendment A005 BidSchedule.xlsx XLSX spreadsheet
Amendment A005.pdf PDF
Amendment A004.pdf PDF
QnA May 11 2026.pdf PDF
QnA May 6 2026.pdf PDF
QnA May 4 2026.pdf PDF
Amendment A003 BidSchedule3.xlsx XLSX spreadsheet
Amendment A003.pdf PDF
QnA April 29 2026.pdf PDF
Amendment A002 BidSchedule.xlsx XLSX spreadsheet
Amendment A002.pdf PDF
QnA April 27 2026.pdf PDF
QnA April 22 2026.pdf PDF
Amendment A001 BidSchedule.xlsx XLSX spreadsheet
Amendment A001.pdf PDF
Interested Vendors List 4 13 2026.gov.pdf PDF
QnA April 10 2026.pdf PDF
CA NP MOJA 11(2) 10(2) XS_signsealed_Part4.pdf PDF
CA NP MOJA 11(2) 10(2) XS_signsealed_Part2.pdf PDF
05 Subgrade Cross Section Report.zip ZIP file
06 Top of Base Course Cross Section Report.zip ZIP file
03 3D Existing Ground Model.zip ZIP file
6982AF25B000013 IFB.pdf PDF
CA NP MOJA 11(2) 10(2) XS_signsealed_Part3.pdf PDF
CA NP MOJA Morning Star Mine Rd Pavement Memo.pdf PDF
CA NP MOJA 11(2) 10(2) XS_signsealed_Part1.pdf PDF
Final Pavement Report - CA NP MOJA 11(2) 10(2) .pdf PDF
BidSchedule .xlsx XLSX spreadsheet
02 3D Surface Models.zip ZIP file
04 3D Breakline File.zip ZIP file
CA NP MOJA 11(2) 10(2) XS_signsealed_Part5.pdf PDF
CA NP MOJA 11(2) 10(2) XS_signsealed_Part6.pdf PDF
CA NP MOJA 11(2) 10(2) Plans_signsealed.pdf PDF
08 Earthwork Summary.zip ZIP file
09 Wilderness Boundary.zip ZIP file
07 Superelevation Report.zip ZIP file
01 Horizontal and Vertical Alignment Listings.zip ZIP file
Show all 39

Notice history

Notice Type Posted
CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS Award Award Notice
This notice Latest solicitation Solicitation
CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Roads Pre-Solicitation
CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Roads Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
UT NP ARCH 100(2) Bridges on Delicate Arch Road Moab, Utah 84532, United States · NAICS 237310 Federal Highway Administration No set-aside
Natchez Trace Parkway Project MS NP NATR 3F26 Mississippi, United States · NAICS 237310 Federal Highway Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors