Amendment A002.pdf
PDF 3 MB Posted
- Solicitation number
- 6982AF25B000013
About this file
This document is Amendment A002 to an Invitations for Bid (IFB) for federal highway construction work issued by the Federal Highway Administration's Central Federal Lands Highway Division for the Kelso-Cima and Kelbaker Roads project (CA NP MOJA 11(2) 10(2), PMIS 310980, 326192) in California. The amendment, effective April 27, 2026, removes and replaces specific bid schedule pages (all A pages including the xlsx file and pages E28-E31) and plan sheets (A9, B1-B7, B9-B11, B13, B55, B62) to incorporate 3R (Resurface, Restore, Rehabilitation) survey and staking clarifications and revisions.
The base schedule (Schedule A) includes comprehensive road reconstruction work with estimated quantities including mobilization, survey and staking for approach roads and drainage structures, slope and clearing control, grade finishing, contractor quality control and testing, clearing and grubbing (51.5 acres), removal of existing structures, roadway excavation (94,200 cubic yards), placed riprap, aggregate base and roadway aggregate, full depth reclamation on 40.8 miles, asphalt concrete pavement placement (86,000 tons), concrete and curb work, tortoise barrier fencing (216,500 linear feet), environmental design features, pavement markings, and labor services. Two optional schedules (X and Y) provide scaled versions of work with reduced quantities. Liquidated damages are set at $7,600 per calendar day for failure to complete work on schedule. The contract requires acknowledgment of the amendment prior to the bid opening date and time, with failure to acknowledge potentially resulting in bid rejection. Standard federal contract clauses apply, including provisions for small business utilization, labor standards compliance, Buy American construction material requirements, and various certifications and administrative requirements.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: Jorey Deml
9A. AMENDMENT OF SOLICITATION NUMBER
5. PROJECT NUMBER (If applicable)
9B. DATED (SEE ITEM 11)
0*
*See Item 14
X
A002 4/27/26 CA NP MOJA 11(2) 10(2)
6982AF25B000013
3/30/26
IFB - Remove and replace the following pages: all A pages (Bid Schedule, including xlsx file), E28-E31, all C pages.
Plans- Remove and replace sheets: A9, B1-B7, B9-B11, B13, B55, B62.
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
BID SCHEDULE
A-6Bid Schedule Project: CA NP MOJA 11(2) 10(2), KELSO CIMA & KELBAKER ROADS
A-6 Amendment A002 4/27/2026
BID SCHEDULE
Project No : CA NP MOJA 11(2) 10(2) Schedule : A Project Name : KELSO CIMA & KELBAKER ROADS Schedule Type : Base
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
A0010 15101-0000 MOBILIZATION ALL LPSM
A0020 15215-1000
SURVEY AND
STAKING, APPROACH
ROAD
123.000 EACH
A0030 15215-3000
SURVEY AND
STAKING, DRAINAGE
STRUCTURE
4.000 EACH
A0040 15215-7000
SURVEY AND
STAKING, PARKING
AREA
3.000 EACH
A0050 15225-0000
SLOPE, REFERENCE,
AND CLEARING AND
GRUBBING CONTROL
47.400 MILE
A002 A0060 15236-2000 SURVEY CONTROL,
GRADE FINISHING 40.800 MILE
A0070 15301-0000 CONTRACTOR
QUALITY CONTROL ALL LPSM
A0080 15401-0000 CONTRACTOR
TESTING ALL LPSM
A0090 15501-0000 CONSTRUCTION
SCHEDULE ALL LPSM
A0100 15701-0000 SOIL EROSION
CONTROL ALL LPSM
A0110 15720-0000
STORMWATER
POLLUTION
PREVENTION PLAN
ALL LPSM
A0120 15802-0000 WATERING FOR DUST
CONTROL ALL LPSM
A0130 20101-0000 CLEARING AND
GRUBBING 51.500 ACRE
A0140 20301-0600 REMOVAL OF CATTLE
GUARD 1.000 EACH
A0150 20301-1800 REMOVAL OF
MONUMENT 1.000 EACH
A001 A0160 20301-2400 REMOVAL OF SIGN 82.000 EACH
A0170 20302-0400 REMOVAL OF CURB,
ASPHALT 280.000 LNFT
A0180 20302-0625 REMOVAL OF CURB,
LOG 480.000 LNFT
A0190 20302-2100 REMOVAL OF PIPE
CULVERT 110.000 LNFT
A0200 20401-0000 ROADWAY
EXCAVATION 94,200.000 CUYD
A0210 20402-0000 SUBEXCAVATION 1,000.000 CUYD
A0220 20441-0000 WASTE 14,300.000 CUYD
A0230 20470-0000 BOULDER 3.000 EACH
A0240 21101-1000
ROADWAY
OBLITERATION,
METHOD 1
5,400.000 SQYD
A0250 21101-2000
ROADWAY
OBLITERATION,
METHOD 2
290.000 SQYD
A-7Bid Schedule
A-7 Amendment A002 4/27/2026
A0260 25101-0300 PLACED RIPRAP,
CLASS 3 11,300.000 CUYD
A0270 30101-0000 AGGREGATE BASE 44,800.000 TON
A0290 30202-2000
ROADWAY
AGGREGATE,
METHOD 2
59,800.000 TON
A0300 30401-5300
FULL DEPTH
RECLAMATION,
METHOD 2, 6-INCH
DEPTH
41.500 MILE
A0310 40101-5600
ASPHALT CONCRETE
PAVEMENT,
GYRATORY MIX, 1/2-
INCH OR 3/4-INCH
NOMINAL MAXIMUM
SIZE AGGREGATE, 0.3
TO <3 MILLION ESAL
86,000.000 TON
A0330 40105-3000 ANTISTRIP ADDITIVE,
TYPE 3 861.000 TON
A0350 40601-0000 FOG SEAL 221.500 TON
A0360 41101-1000 PRIME COAT,
METHOD 1 763.000 TON
A0370 41105-0000 BLOTTER 800.000 TON
A0380 41201-0000 TACK COAT 221.000 TON
A0390 41801-1000
ASPHALT CONCRETE
PAVEMENT PATCH,
TYPE 1
140.000 SQYD
A0400 50101-0600
MINOR CONCRETE
PAVEMENT,
REINFORCED, 6-INCH
DEPTH
150.000 SQYD
A0410 60201-0800 24-INCH PIPE
CULVERT 120.000 LNFT
A0420 60201-0900 30-INCH PIPE
CULVERT 55.000 LNFT
A0430 60210-0800 END SECTION FOR 24-
INCH PIPE CULVERT 6.000 EACH
A0440 60210-0900 END SECTION FOR 30-
INCH PIPE CULVERT 2.000 EACH
A0450 60901-1000 CURB, CONCRETE, 12
-INCH DEPTH 5,770.000 LNFT
A0460 60902-1000
CURB AND GUTTER,
CONCRETE, 12-INCH
DEPTH
1,600.000 LNFT
A0470 61001-0500
SIDEWALK, EXPOSED
AGGREGATE
CONCRETE
700.000 SQYD
A0480 61004-2000
ACCESSIBILITY RAMP,
EXPOSED
AGGREGATE
CONCRETE
25.000 SQYD
A0490 61801-0000 CONCRETE BARRIER 16,100.000 LNFT
A0500 61901-3300 FENCE, TORTOISE
BARRIER 216,500.000 LNFT
A0510 61902-0900 GATE, METAL 6.000 EACH
A0520 61920-2000 REMOVE AND RESET
GATE 3.000 EACH
A0530 61921-1000 REMOVE AND RESET
FENCE 100.000 LNFT
A0540 62201-0250
DUMP TRUCK, 10
CUBIC YARD MINIMUM
CAPACITY
160.000 HOUR
A0550 62201-0450
BACKHOE LOADER, 4
CUBIC FOOT MINIMUM
RATED CAPACITY
BUCKET, 18-INCH
WIDTH
160.000 HOUR
A-8Bid Schedule
A-8 Amendment A002 4/27/2026
A0560 62201-0950
WHEEL LOADER, 3
CUBIC YARD MINIMUM
RATED CAPACITY
160.000 HOUR
A0570 62201-1400
BULLDOZER, 250HP
MINIMUM FLYWHEEL
POWER
160.000 HOUR
A0580 62201-2850
MOTOR GRADER, 12
FOOT MINIMUM
BLADE
160.000 HOUR
A0590 62201-3250
HYDRAULIC
EXCAVATOR, 2.0
CUBIC YARD MINIMUM
CAPACITY WITH
THUMB ATTACHMENT
160.000 HOUR
A0600 62301-0000 GENERAL LABOR 90.000 HOUR
A0610 62302-1100
SPECIAL LABOR,
HIRED SURVEY
SERVICES
90.000 HOUR
A0620 62303-1000
SPECIAL LABOR,
HIRED TECHNICAL
SERVICES
(TRIBAL MONITOR)
ALL LPSM
A0630 62303-1010
SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
BIOLOGICAL
SERVICES
ALL LPSM
A0640 62303-1020
SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
ARCHEOLOGICAL
SERVICES
ALL LPSM
A0650 62407-0000 PLACING
CONSERVED TOPSOIL
(1-INCH DEPTH) 5,300.000 CUYD
A0660 63301-0000 SIGN SYSTEM 52.000 EACH
A0670 63301-0000 SIGN SYSTEM (LARGE SIGN) 8.000 EACH
A001 A0680 63302-0000 SIGN SYSTEM (SIGN PANEL) 890.000 SQFT
A0690 63308-3000 OBJECT MARKER,
TYPE 3 22.000 EACH
A0700 63309-0200 DELINEATOR, TYPE 2 880.000 EACH
A0710 63312-0000 SPEED HUMP 1.000 EACH
A0720 63316-1000 REMOVE AND RESET
SIGN SYSTEM 121.000 EACH
A0730 63316-3000 REMOVE AND RESET
OBJECT MARKER 13.000 EACH
A0740 63325-0000 MUMBLE STRIP (TRANSVERSE) 150.000 LNFT
A0750 63326-0000 MUMBLE STRIP (CENTERLINE) 3.500 MILE
A0760 63326-0000 MUMBLE STRIP (SHOULDER) 62.200 MILE
A0770 63401-0300
PAVEMENT
MARKINGS, TYPE B,
SOLID
3,360.000 LNFT
A0780 63402-0300
PAVEMENT
MARKINGS, TYPE B,
SOLID
264.000 MILE
A0790 63402-0400
PAVEMENT
MARKINGS, TYPE B,
BROKEN
70.000 MILE
A0800 63405-0050 PAVEMENT
MARKINGS, SYMBOLS 1.000 EACH
A0810 63405-0550
PAVEMENT
MARKINGS, TYPE B,
STRAIGHT ARROW
2.000 EACH
A0820 63405-0700
PAVEMENT
MARKINGS, TYPE B,
"STOP" WORD
MESSAGE
4.000 EACH
A-9Bid Schedule
A-9 Amendment A002 4/27/2026
A0830 63405-0800
PAVEMENT
MARKINGS, TYPE B,
RAILROAD SYMBOL
3.000 EACH
A0840 63405-0850
PAVEMENT
MARKINGS, TYPE B,
ACCESSIBILITY
SYMBOL
2.000 EACH
A0850 63405-0855
PAVEMENT
MARKINGS, TYPE B,
SPEED HUMP
MARKINGS
2.000 EACH
A0860 63501-0000 TEMPORARY TRAFFIC
CONTROL ALL LPSM
A0870 63501-0000 TEMPORARY TRAFFIC
CONTROL
(RAILROAD FLAGGER) ALL LPSM
A0880 63640-0600
RELOCATE
COMMUNICATION
LINE
ALL LPSM
A0890 64603-0000 FIXTURE (ENTRANCE SIGN) 1.000 EACH
A0900 64603-0000 FIXTURE (LANDMARK SIGN) 1.000 EACH
A0910 64702-3100
ENVIRONMENTAL
DESIGN, TORTOISE
CROSSING
STRUCTURE
2,280.000 LNFT
A0920 64703-6500
ENVIRONMENTAL
DESIGN, SMALL
WILDLIFE ESCAPE
RAMP
25.000 EACH
A001 A0950 63306-1800 POST, WOOD, 4-INCH
X 6-INCH 44.000 EACH
A001 A0960 63306-2000 POST, WOOD, 8-INCH
X 6-INCH 4.000 EACH
Submitted By: Schedule Total:
A-10Bid Schedule Project: CA NP MOJA 11(2) 10(2), KELSO CIMA & KELBAKER ROADS
A-10 Amendment A002 4/27/2026
A0080 15401-0000 CONTRACTOR TESTING ALL LPSM $_______________ BID
ALTERNATE ITEM (Government-Furnished Lab) See page A-4
Project No : CA NP MOJA 11(2) 10(2) Schedule : X Project Name : KELSO CIMA & KELBAKER ROADS Schedule Type : Option
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
X0010 15101-0000 MOBILIZATION ALL LPSM
X0020 15215-1000
SURVEY AND
STAKING, APPROACH
ROAD
4.000 EACH
X0030 15215-7000
SURVEY AND
STAKING, PARKING
AREA
1.000 EACH
X0040 15225-0000
SLOPE, REFERENCE,
AND CLEARING AND
GRUBBING CONTROL
3.200 MILE
A002 X0050 15236-2000 SURVEY CONTROL,
GRADE FINISHING 4.900 MILE
X0060 15301-0000 CONTRACTOR
QUALITY CONTROL ALL LPSM
X0070 15401-0000 CONTRACTOR
TESTING ALL LPSM
X0080 15501-0000 CONSTRUCTION
SCHEDULE ALL LPSM
X0090 15701-0000 SOIL EROSION
CONTROL ALL LPSM
X0100 15720-0000
STORMWATER
POLLUTION
PREVENTION PLAN
ALL LPSM
X0110 15802-0000 WATERING FOR DUST
CONTROL ALL LPSM
X0120 20101-0000 CLEARING AND
GRUBBING 6.000 ACRE
X0130 20301-0600 REMOVAL OF CATTLE
GUARD 1.000 EACH
X0140 20301-2400 REMOVAL OF SIGN 9.000 EACH
X0150 20401-0000 ROADWAY
EXCAVATION 10,700.000 CUYD
X0160 20402-0000 SUBEXCAVATION 100.000 CUYD
X0170 20441-0000 WASTE 500.000 CUYD
X0180 21101-1000
ROADWAY
OBLITERATION,
METHOD 1
380.000 SQYD
X0190 21101-2000
ROADWAY
OBLITERATION,
METHOD 2
400.000 SQYD
X0200 30101-0000 AGGREGATE BASE 5,300.000 TON
X0220 30202-2000
ROADWAY
AGGREGATE,
METHOD 2
5,400.000 TON
X0230 30401-5300
FULL DEPTH
RECLAMATION,
METHOD 2, 6-INCH
DEPTH
2.500 MILE
A-11Bid Schedule Project: CA NP MOJA 11(2) 10(2), KELSO CIMA & KELBAKER ROADS
A-11 Amendment A002 4/27/2026
(CONTRACTOR FURNISHED LAB)
X0240 40101-5600
ASPHALT CONCRETE
PAVEMENT,
GYRATORY MIX, 1/2-
INCH OR 3/4-INCH
NOMINAL MAXIMUM
SIZE AGGREGATE, 0.3
TO <3 MILLION ESAL
8,500.000 TON
X0260 40105-3000 ANTISTRIP ADDITIVE,
TYPE 3 88.000 TON
X0280 40601-0000 FOG SEAL 23.000 TON
X0290 41101-1000 PRIME COAT,
METHOD 1 79.000 TON
X0300 41105-0000 BLOTTER 80.000 TON
X0310 41201-0000 TACK COAT 23.000 TON
X0320 50101-0600
MINOR CONCRETE
PAVEMENT,
REINFORCED, 6-INCH
DEPTH
36.000 SQYD
X0330 60901-1000 CURB, CONCRETE, 12
-INCH DEPTH 480.000 LNFT
X0340 61001-0500
SIDEWALK, EXPOSED
AGGREGATE
CONCRETE
130.000 SQYD
X0350 61004-2000
ACCESSIBILITY RAMP,
EXPOSED
AGGREGATE
CONCRETE
11.000 SQYD
X0360 61901-3300 FENCE, TORTOISE
BARRIER 14,200.000 LNFT
X0370 62201-0250
DUMP TRUCK, 10
CUBIC YARD MINIMUM
CAPACITY
30.000 HOUR
X0380 62201-0450
BACKHOE LOADER, 4
CUBIC FOOT MINIMUM
RATED CAPACITY
BUCKET, 18-INCH
WIDTH
30.000 HOUR
X0390 62201-0950
WHEEL LOADER, 3
CUBIC YARD MINIMUM
RATED CAPACITY
30.000 HOUR
X0400 62201-1400
BULLDOZER, 250HP
MINIMUM FLYWHEEL
POWER
30.000 HOUR
X0410 62201-2850
MOTOR GRADER, 12
FOOT MINIMUM
BLADE
30.000 HOUR
X0420 62201-3250
HYDRAULIC
EXCAVATOR, 2.0
CUBIC YARD MINIMUM
CAPACITY WITH
THUMB ATTACHMENT
30.000 HOUR
X0430 62301-0000 GENERAL LABOR 30.000 HOUR
X0440 62302-1100
SPECIAL LABOR,
HIRED SURVEY
SERVICES
20.000 HOUR
X0450 62303-1000
SPECIAL LABOR,
HIRED TECHNICAL
SERVICES
(TRIBAL MONITOR)
ALL LPSM
X0460 62303-1010
SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
BIOLOGICAL
SERVICES
ALL LPSM
X0470 62303-1020
SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
ARCHEOLOGICAL
SERVICES
ALL LPSM
A-12Bid Schedule
A-12 Amendment A002 4/27/2026
X0480 62407-0000 PLACING
CONSERVED TOPSOIL 600.000 CUYD
X0490 63301-0000 SIGN SYSTEM 5.000 EACH
X0500 63301-0000 SIGN SYSTEM (LARGE SIGN) 1.000 EACH
X0510 63302-0000 SIGN SYSTEM (SIGN PANEL) 34.000 SQFT
X0520 63309-0200 DELINEATOR, TYPE 2 106.000 EACH
X0530 63316-1000 REMOVE AND RESET
SIGN SYSTEM 34.000 EACH
X0540 63326-0000 MUMBLE STRIP (CENTERLINE) 1.000 MILE
X0550 63326-0000 MUMBLE STRIP (SHOULDER) 6.400 MILE
X0560 63401-0300
PAVEMENT
MARKINGS, TYPE B,
SOLID
760.000 LNFT
X0570 63402-0300
PAVEMENT
MARKINGS, TYPE B,
SOLID
34.000 MILE
X0580 63402-0400
PAVEMENT
MARKINGS, TYPE B,
BROKEN
4.500 MILE
X0590 63405-0050 PAVEMENT
MARKINGS, SYMBOLS 4.000 EACH
X0600 63405-0850
PAVEMENT
MARKINGS, TYPE B,
ACCESSIBILITY
SYMBOL
1.000 EACH
X0610 63501-0000 TEMPORARY TRAFFIC
CONTROL ALL LPSM
X0620 64702-3100
ENVIRONMENTAL
DESIGN, TORTOISE
CROSSING
STRUCTURE
40.000 LNFT
X0630 64703-6500
ENVIRONMENTAL
DESIGN, SMALL
WILDLIFE ESCAPE
RAMP
2.000 EACH
Submitted By: Schedule Total:
A-13Bid Schedule Project: CA NP MOJA 11(2) 10(2), KELSO CIMA & KELBAKER ROADS
A-13 Amendment A002 4/27/2026
X0070 15401-0000 CONTRACTOR TESTING ALL LPSM $_______________ BID
ALTERNATE ITEM (Government-Furnished Lab) See page A-4
Project No : CA NP MOJA 11(2) 10(2) Schedule : Y Project Name : KELSO CIMA & KELBAKER ROADS Schedule Type : Option
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
Y2000 15101-0000 MOBILIZATION ALL LPSM
Y2010 15215-1000
SURVEY AND
STAKING, APPROACH
ROAD
8.000 EACH
Y2020 15225-0000
SLOPE, REFERENCE,
AND CLEARING AND
GRUBBING CONTROL
6.100 MILE
A002 Y2030 15236-2000 SURVEY CONTROL,
GRADE FINISHING 7.900 MILE
Y2040 15301-0000 CONTRACTOR
QUALITY CONTROL ALL LPSM
Y2050 15401-0000 CONTRACTOR
TESTING ALL LPSM
Y2060 15501-0000 CONSTRUCTION
SCHEDULE ALL LPSM
Y2070 15701-0000 SOIL EROSION
CONTROL ALL LPSM
Y2080 15720-0000
STORMWATER
POLLUTION
PREVENTION PLAN
ALL LPSM
Y2090 15802-0000 WATERING FOR DUST
CONTROL ALL LPSM
Y2100 20101-0000 CLEARING AND
GRUBBING 9.500 ACRE
Y2110 20301-2400 REMOVAL OF SIGN 7.000 EACH
Y2120 20401-0000 ROADWAY
EXCAVATION 8,700.000 CUYD
Y2130 20402-0000 SUBEXCAVATION 200.000 CUYD
Y2140 21101-2000
ROADWAY
OBLITERATION,
METHOD 2
100.000 SQYD
Y2150 25101-0300 PLACED RIPRAP,
CLASS 3 1,165.000 CUYD
Y2160 30101-0000 AGGREGATE BASE 4,600.000 TON
Y2180 30202-2000
ROADWAY
AGGREGATE,
METHOD 2
12,500.000 TON
Y2190 30401-5300
FULL DEPTH
RECLAMATION,
METHOD 2, 6-INCH
DEPTH
4.500 MILE
Y2200 40101-5600
ASPHALT CONCRETE
PAVEMENT,
GYRATORY MIX, 1/2-
INCH OR 3/4-INCH
NOMINAL MAXIMUM
SIZE AGGREGATE, 0.3
TO <3 MILLION ESAL
16,300.000 TON
Y2220 40105-3000 ANTISTRIP ADDITIVE,
TYPE 3 170.000 TON
Y2240 40601-0000 FOG SEAL 43.000 TON
Y2250 41101-1000 PRIME COAT,
METHOD 1 146.000 TON
A-14Bid Schedule Project: CA NP MOJA 11(2) 10(2), KELSO CIMA & KELBAKER ROADS
A-14 Amendment A002 4/27/2026
(CONTRACTOR FURNISHED LAB)
Y2260 41105-0000 BLOTTER 154.000 TON
Y2270 41201-0000 TACK COAT 43.000 TON
Y2280 60901-1000 CURB, CONCRETE, 12
-INCH DEPTH 650.000 LNFT
Y2290 61801-0000 CONCRETE BARRIER 1,860.000 LNFT
Y2300 62201-0250
DUMP TRUCK, 10
CUBIC YARD MINIMUM
CAPACITY
50.000 HOUR
Y2310 62201-0450
BACKHOE LOADER, 4
CUBIC FOOT MINIMUM
RATED CAPACITY
BUCKET, 18-INCH
WIDTH
50.000 HOUR
Y2320 62201-0950
WHEEL LOADER, 3
CUBIC YARD MINIMUM
RATED CAPACITY
50.000 HOUR
Y2330 62201-1400
BULLDOZER, 250HP
MINIMUM FLYWHEEL
POWER
50.000 HOUR
Y2340 62201-2850
MOTOR GRADER, 12
FOOT MINIMUM
BLADE
50.000 HOUR
Y2350 62201-3250
HYDRAULIC
EXCAVATOR, 2.0
CUBIC YARD MINIMUM
CAPACITY WITH
THUMB ATTACHMENT
50.000 HOUR
Y2360 62301-0000 GENERAL LABOR 50.000 HOUR
Y2370 62302-1100
SPECIAL LABOR,
HIRED SURVEY
SERVICES
40.000 HOUR
Y2380 62303-1010
SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
BIOLOGICAL
SERVICES
ALL LPSM
Y2390 62303-1020
SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
ARCHEOLOGICAL
SERVICES
ALL LPSM
Y2400 62407-0000 PLACING
CONSERVED TOPSOIL
(1-INCH DEPTH) 940.000 CUYD
Y2410 63301-0000 SIGN SYSTEM 5.000 EACH
Y2420 63309-0200 DELINEATOR, TYPE 2 251.000 EACH
Y2430 63316-1000 REMOVE AND RESET
SIGN SYSTEM 21.000 EACH
Y2440 63326-0000 MUMBLE STRIP (CENTERLINE) 2.000 MILE
Y2450 63326-0000 MUMBLE STRIP (SHOULDER) 12.000 MILE
Y2460 63402-0300
PAVEMENT
MARKINGS, TYPE B,
SOLID
64.000 MILE
Y2470 63402-0400
PAVEMENT
MARKINGS, TYPE B,
BROKEN
7.000 MILE
Y2480 63501-0000 TEMPORARY TRAFFIC
CONTROL ALL LPSM
Submitted By: Schedule Total:
A-15Bid Schedule
A-15 Amendment A002 4/27/2026
Total-Schedule(s) and Option(s) Bid Total
Schedule A, Option X, Option Y $0.00
BID SCHEDULE SUMMARY
Schedule Bid Total
Schedule A - Base $0.00
Schedule Bid Total
Schedule X - Option $0.00
Schedule Bid Total
Schedule Y - Option $0.00
A-16Bid Schedule
A-16 Amendment A002 4/27/2026
C-1
Contract Clauses
52.202-1 Definitions (JUN 2020)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (MAY 2014)
52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020)
52.203-7 Anti-Kickback Procedures. (JUN 2020)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)
52.203-13 Contractor Code of Business Ethics and Conduct (NOV 2021)
52.203-14 Display of Hotline Poster(s) (NOV 2021)
(a) Definition.
United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) Display of fraud hotline poster(s). Except as provided in paragraph (c)—
(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites-
(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and
(ii) Any DHS fraud hotline poster subsequently identified by the Contracting Officer.
(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.
(3) Any required posters may be obtained as follows:
Amendment A002 4/27/2026
C-2
General Fraud https://www.oig.dot.gov/sites/default/files/files/OIG-generic-2.pdf
(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in all subcontracts that exceed the threshold specified in Federal Acquisition Regulation 3.1004(b)(1) on the date of subcontract award, except when the subcontract—
(1) Is for the acquisition of a commercial product or commercial service; or
(2) Is performed entirely outside the United States.
(End of clause)
52.203-17 Contractor Employee Whistleblower Rights and Requirements to Inform Employees of Whistleblower Rights (NOV 2023)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN
2020)(DEVIATION NOV 2025)
52.204-13 System for Award Management Maintenance. (OCT 2018)(DEVIATION NOV
52.204-14 Service Contract Reporting Requirements (OCT 2016)(DEVIATION NOV 2025)
52.204-19 Incorporation by Reference of Representations and Certifications. (DEC
2014)(DEVIATION NOV 2025)
52.204-91 Contractor Identification (DEVIATION NOV 2025)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JAN 2025)(DEVIATION
SEP 2025)(DEVIATION JAN 2026)
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (NOV
2015)(DEVIATION SEP 2025)(DEVIATION JAN 2026)
C-3
52.210-1 Market Research. (Nov 2021)(DEVIATION JUN 2025)
52.211-12 Liquidated Damages - Construction. (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $ 7,600.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.211-13 Time Extensions. (SEP 2000)
52.214-26 Audit and Records – Sealed Bidding. (JUN 2020)(DEVIATION OCT 2025)
52.214-27 Price Reduction for Defective Certified Cost or Pricing Data – Modifications – Sealed Bidding. (JUN 2020)
52.214-28 Subcontractor Certified Cost or Pricing Data – Modifications – Sealed Bidding.
(JUN 2020)(DEVIATION OCT 2025)
52.217-7 Option for Increased Quantity - Separately Priced Line Item. (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the options by written notice to the Contractor within 60 days for Option X after the award of Schedule A and within 90 days for Option Y after the award of Schedule A. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns. (OCT 2022)(DEVIATION NOV 2025)
(a) Evaluation preference. (1) Offers will be evaluated by adding a factor of 10 percent to the price of all offers, except-
(i) Offers from HUBZone small business concerns that have not waived the evaluation preference; and
(ii) Otherwise successful offers from small business concerns.
C-4
(b) Waiver of evaluation preference. A HUBZone small business concern may choose to waive the evaluation preference. If the concern waives the preference, the factor will be added to its offer for evaluation purposes.
□ Offeror chooses to waive the evaluation preference.
(c) Joint venture. A HUBZone joint venture agrees that, in the performance of the contract, at least 40 percent of the aggregate work performed by the joint venture shall be completed by the HUBZone small business parties to the joint venture. Work performed by the HUBZone small business parties to the joint venture must be more than administrative functions.
(End of provision)
52.219-8 Utilization of Small Business Concerns (JAN 2025)(DEVIATION NOV 2025)
52.219-9 Small Business Subcontracting Plan (JAN 2025)(DEVIATION NOV 2025) - Alternate I (NOV 2016)(DEVIATION NOV 2025)
52.219-14 Limitations on Subcontracting (OCT 2022)(DEVIATION NOV 2025)
52.219-16 Liquidated Damages -- Subcontracting Plan (SEP 2021)(DEVIATION NOV 2025)
52.219-27 Notice of Set-Aside for, or Sole -Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB
2024)(DEVIATION NOV 2025)
52.219-28 Post-Award Small Business Program Rerepresentation (JAN 2025)(DEVAITION
NOV 2025)
52.222-1 Notice to the Government of Labor Disputes. (FEB 1997)(DEVIATION OCT
52.222-3 Convict Labor. (JUN 2003)(DEVIATION OCT 2025)
52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (MAY 2018)(DEVIATION OCT 2025)
52.222-6 Construction Wage Rate Requirements. (AUG 2018)(DEVIATION FEB
2025)(DEVIATION OCT 2025)
52.222-7 Withholding of Funds. (MAY 2014)(DEVIATION OCT 2025)
52.222-8 Payrolls and Basic Records. (JUL 2021)(DEVIATION OCT 2025)
52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)(DEVIATION OCT
C-5
52.222-11 Subcontracts (Labor Standards). (MAY 2014)(DEVIATION FEB
2025)(DEVIATION OCT 2025)
52.222-12 Contract Termination - Debarment. (MAY 2014)(DEVIATION FEB 2025)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)(DEVIATION OCT 2025)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-34 Project Labor Agreement (JAN 2024)(DEVIATION OCT 2025)
(a) Definitions. As used in this clause-
Construction means construction, reconstruction, rehabilitation, modernization, alteration, conversion, extension, repair, or improvement of buildings, structures, highways, or other real property.
Labor organization means a labor organization as defined in 29 U.S.C. 152(5) of which building and construction employees are members.
Large-scale construction project means a Federal construction project within the United States for which the total estimated cost of the construction contract(s) to the Federal Government is $35 million or more.
Project labor agreement means a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f).
(b) The Contractor must maintain in a current status throughout the life of the contract the project labor agreement entered into prior to the award of the contract.
(c) Subcontracts. The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts with subcontractors engaged in construction on the construction project.
52.222-35 Equal Opportunity for Veterans. (JUN 2020)(DEVIATION OCT 2025)
52.222-36 Affirmative Action for Workers with Disabilities. (JUN 2020)(DEVIATION OCT
C-6
52.222-37 Employment Reports on Veterans (JUN 2020)(DEVIATION OCT 2025)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC
2010)(DEVIATION OCT 2025)
52.222-50 Combating Trafficking in Persons (OCT 2025)(DEVIATION OCT 2025)
52.222-54 Employment Eligibility Verification (JAN 2025)(DEVIATION OCT 2025)
52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022)(DEVIATION OCT
52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026)
(a) Definitions. As used in this clause— Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor.
Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources.
(b) In connection with the performance of work under this contract, the Contractor agrees as follows:
(1) The Contractor will not engage in any racially discriminatory DEI activities;
(2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause;
(3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts;
(4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and
(5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.
(6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4).
(c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.
C-7
52.223-2 Reporting of Biobased Products Under Service and Construction Contract. (MAY
2024)(DEVIATION FEB 2025)(DEVIATION DEC 2025)
Biobased product means a product determined by the U.S. Department of Agriculture (USDA) to be a commercial product or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials and forestry materials, or that is an intermediate ingredient or feedstock. The term includes, with respect to forestry materials, forest products that meet biobased content requirements, notwithstanding the market share the product holds, the age of the product, or whether the market for the product is new or emerging. ( 7 U.S.C. 8101) (7 CFR 4270.2).
USDA-designated product category a generic grouping of biobased products that are listed by USDA in a procurement guideline (7 CFR part 4270) and for which USDA has provided minimum biobased content standards (see https://www.biopreferred.gov/resources/categories.html).
(b) Requirement. The Contractor shall—
(1) Report to https://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any biobased products in USDA-designated product categories purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
C-8
52.223-3 Hazardous Material Identification and Material Safety Data. (FEB
2021)(DEVIATION DEC 2025)
Sustainable product means—
(1) A product that contains recovered material designated by the EPA under the Comprehensive Procurement Guidelines (42 U.S.C. 6962) (40 CFR part 247)
( https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products).
(2) An energy-efficient product or low standby power device (42 U.S.C. 8259b) (10 CFR part 436, subpart C) ( https://www.energy.gov/eere/femp/search-energy-efficient-products, https://www.energystar.gov/products?s=mega, and https://www.energy.gov/femp/low-standby-power-product-list).
(3) A biobased product that meets the content requirements of the USDA under the BioPreferred® program (7 U.S.C. 8102) (7 CFR Part 4270) ( https://www.biopreferred.gov/).
(4) A substance identified in the EPA’s Significant New Alternatives Policy (SNAP) program as a safe alternative to an ozone-depleting substance (42 U.S.C. 7671l) (40 CFR part 82, subpart G) ( https://www.epa.gov/snap/unacceptable-and-acceptable-substitutes-tables).
(b) Requirements. The Government has identified in the statement of work or elsewhere in the contract the sustainable products that are required during the performance of this contract. The Contractor shall ensure that it provides sustainable products as required by this contract, when the products are—
(1) Delivered to the Government;
(2) Furnished for use by the Government;
(3) Incorporated into the construction of a public building or public work; or
(c) Furnished for use in performing services under this contract, where the cost of the products is a direct cost to this contract.
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2024)
52.223-23 Sustainable Products and Services (May 2024)(DEVIATION FEB
2025)(DEVIATION DEC 2025)
(a) Definitions. As used in this clause—
Sustainable product means—
(1) A product that contains recovered material designated by the EPA under the Comprehensive Procurement Guidelines (42 U.S.C. 6962) (40 CFR part 247)
( https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products).
(2) An energy-efficient product or low standby power device (42 U.S.C. 8259b) (10 CFR part 436, subpart C) ( https://www.energy.gov/eere/femp/search-energy-efficient-
C-9 products, https://www.energystar.gov/products?s=mega, and https://www.energy.gov/femp/low-standby-power-product-list).
(3) A biobased product that meets the content requirements of the USDA under the BioPreferred® program (7 U.S.C. 8102) (7 CFR Part 4270) ( https://www.biopreferred.gov/).
(4) A substance identified in the EPA’s Significant New Alternatives Policy (SNAP) program as a safe alternative to an ozone-depleting substance (42 U.S.C. 7671l) (40 CFR part 82, subpart G) ( https://www.epa.gov/snap/unacceptable-and-acceptable-substitutes-tables).
(b) Requirements. The Government has identified in the statement of work or elsewhere in the contract the sustainable products that are required during the performance of this contract. The Contractor shall ensure that it provides sustainable products as required by this contract, when the products are—
(1) Delivered to the Government;
(2) Furnished for use by the Government;
(3) Incorporated into the construction of a public building or public work; or
(c) Furnished for use in performing services under this contract, where the cost of the products is a direct cost to this contract.
52.224-1 Privacy Act Notification. (APR 1984)
52.224-2 Privacy Act. (APR 1984)
52.225-11 Buy American-Construction Materials under Trade Agreements (NOV
C-10
2023) (DEVIATION NOV 2025)
Caribbean Basin country construction material means a construction material that—
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
C-11
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Designated country means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, North Macedonia, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);
(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means—
C-12
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if—
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Free Trade Agreement country construction material means a construction material that-
(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country;
or
C-13 another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.
Least developed country construction material means a construction material that-
(1) Is wholly the growth, product, or manufacture of a least developed country; or another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
United States means the 50 States, the District of Columbia, and outlying areas.
WTO GPA country construction material means a construction material that-
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
(b) Construction materials.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C.1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction material, excluding COTS fasteners. In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.
(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.
C-14
(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
[Contracting Officer is to list applicable excepted materials or indicate "none"]
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1) The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) [Reserved]
(3) [Reserved]
(B) For domestic construction material that is a critical item or contains critical components.
(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) [Reserved]
(3) [Reserved]
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
C-15
(c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
C-16
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material Unit of Price description measure Quantity (dollars)*
Item 1:
Foreign construction material.
Domestic construction material.
Item 2:
Foreign construction material.
Domestic construction material.
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[ List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. ]
[ Include other applicable supporting information. ]
52.226-7 Drug Free Workplace (May 2024)
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. (MAY 2024)
52.227-1 Authorization and Consent. (JUN 2020)
52.227-2 Notice and…