CA FTNP SEKI 13(2) Mineral King Road

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF24B000017
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
California, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is seeking bids for a comprehensive road rehabilitation project within Sequoia and Kings Canyon National Park in California. The solicitation covers the rehabilitation of up to 12.09 miles of Mineral King Road, which involves pulverizing existing pavement, placing aggregate base, conducting asphalt paving, and implementing various infrastructure improvements. Key contract requirements include constructing soldier pile walls, soil nail walls, special rock embankment, and comprehensive drainage improvements such as ditch paving, culvert replacement, and inlet installation. The project will be evaluated through a full and open competitive process with a HUBZone price preference, with bids due by November 6, 2024. Potential bidders must demonstrate capability to work in a remote, environmentally sensitive mountainous terrain while maintaining intermittent public access during construction.

The solicitation is not set aside for any specific small business category, making it open to all qualified contractors. The estimated project cost ranges from $25 million to $35 million, with construction anticipated from April 2025 through October 2027. Principal work items include 22,500 linear feet of ditch excavation, 1,900 cubic yards of rip rap, 700 cubic yards of special rock embankment, and 26,000 tons of asphalt pavement. The project will be performed in Tulare County, California, specifically within the Sequoia and Kings Canyon National Park boundaries. Key infrastructure work includes installing 380 linear feet of steel H piles, 9,800 linear feet of culverts ranging from 24" to 48", and 70 concrete box inlets, with the project requiring complex engineering solutions in a challenging geographical environment.

Notice text

2 versions

Update #2 · Latest ·

THIS IS AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE AVAILABLE

 
Full and Open Competition with HUBZone price preference 


PROJECT NUMBER: CA FTNP SEKI 13(2) 
PROJECT NAME: MINERAL KING ROAD 
PROJECT DESCRIPTION: 
The project proposes to rehabilitate up to 12.09 miles of Mineral King Road located within Sequoia and Kings Canyon National Park (SEKI). The project is located east of Visalia in Tulare County, CA. 
SCOPE OF THE WORK: 
The scope includes pulverization of the existing pavement, aggregate base placement, and asphalt paving of the roadway. Parking lots will be rehabilitated or paved to improve visitor access. Soldier pile walls, soil nail walls, and areas of special rock embankment will be constructed throughout the project to stabilize the roadway. The project also includes drainage improvements such as ditch paving and grading, inlet installation, culvert replacement, and inlet and outlet protection measures. 

The Mineral King Road Project is in remote mountainous terrain with areas of limited roadway bench width. Public access will have to be maintained during construction with intermittent allowable closures depending on season and time. The road is inaccessible during winter due to extreme weather and snowpack. The project is in an environmentally sensitive resource area within the National Park Service. 


PRINCIPAL WORK ITEMS: 
22,500 LF Ditch Excavation 
1,900 CY Rip Rap 
700 CY Special Rock Embankment 

6,500 Tons Roadway Aggregate, Method 2 
7.5 Miles Full Depth Reclamation, Method 2 
4.5 Miles Full Depth Reclamation, Method 2 with Cement 
26,000 Tons Asphalt Pavement 
380 LF Steel H Piles, In Place 
9,800 LF 24" to 48" Culverts 
70 Each Inlet (Concrete Box Inlet) 
37,000 LF Paved Ditch, Asphalt 
80 Each Dry Stacked Headwall 

ANTICIPATED SCHEDULE: 
Preshow Onsite Meeting - October 2024 
Advertisement - October 2024 
Construction - April 2025 through October 2027 

Estimated Cost Range:  $25M to $35M

Update #1 ·

THIS IS AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE AVAILABLE

 
Full and Open Competition with HUBZone price preference 


PROJECT NUMBER: CA FTNP SEKI 13(2) 
PROJECT NAME: MINERAL KING ROAD 
PROJECT DESCRIPTION: 
The project proposes to rehabilitate up to 12.09 miles of Mineral King Road located within Sequoia and Kings Canyon National Park (SEKI). The project is located east of Visalia in Tulare County, CA. 
SCOPE OF THE WORK: 
The scope includes pulverization of the existing pavement, aggregate base placement, and asphalt paving of the roadway. Parking lots will be rehabilitated or paved to improve visitor access. Soldier pile walls, soil nail walls, and areas of special rock embankment will be constructed throughout the project to stabilize the roadway. The project also includes drainage improvements such as ditch paving and grading, inlet installation, culvert replacement, and inlet and outlet protection measures. 

The Mineral King Road Project is in remote mountainous terrain with areas of limited roadway bench width. Public access will have to be maintained during construction with intermittent allowable closures depending on season and time. The road is inaccessible during winter due to extreme weather and snowpack. The project is in an environmentally sensitive resource area within the National Park Service. 


PRINCIPAL WORK ITEMS: 
22,500 LF Ditch Excavation 
1,900 CY Rip Rap 
700 CY Special Rock Embankment 
1800 SF Soil Nail Retaining Wall 
6,500 Tons Roadway Aggregate, Method 2 
7.5 Miles Full Depth Reclamation, Method 2 
4.5 Miles Full Depth Reclamation, Method 2 with Cement 
26,000 Tons Asphalt Pavement 
380 LF Steel H Piles, In Place 
9,800 LF 24" to 48" Culverts 
70 Each Inlet (Concrete Box Inlet) 
37,000 LF Paved Ditch, Asphalt 
80 Each Dry Stacked Headwall 

ANTICIPATED SCHEDULE: 
Preshow Onsite Meeting - October 2024 
Advertisement - October 2024 
Construction - April 2025 through October 2027 

Estimated Cost Range:  $25M to $35M

Files

Show all 15

Notice history

Notice Type Posted
CA FTNP SEKI 13(2) Mineral King Road Award Award Notice
This notice Latest solicitation Solicitation
CA FTNP SEKI 13(2) Mineral King Road Pre-Solicitation
CA FTNP SEKI 13(2) Mineral King Road Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
GOGA 336173 - Repair Conzelman Road NAICS 237310 National Office No set-aside
ND NP THRO 204(1) Buck Hill Road Medora, North Dakota, United States · NAICS 237310 Federal Highway Administration No set-aside
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements Tishomingo, Oklahoma 73460, United States · NAICS 237310 Federal Highway Administration Total Small Business
GAOA Facilities, Barracks Inyo NF Lone Pine, California, United States · NAICS 236220 Forest Service Total Small Business
Natchez Trace Parkway Project MS NP NATR 3F26 Mississippi, United States · NAICS 237310 Federal Highway Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity