This document is a Bid Opening Summary for the MINERAL KING ROAD project, Contract Number CA FTNP SEKI 13 (2). The project proposes to rehabilitate up to 12.09 miles of Mineral King Road within Sequoia and Kings Canyon National Park, including pulverization of existing pavement, aggregate base placement, asphalt paving, parking lot rehabilitation, construction of soldier pile walls, soil nail walls, and drainage improvements. The project is located in remote mountainous terrain with limited roadway bench width.
The bid opening was held on 11/6/2024, with four bidders submitting proposals. The lowest bid was $41,999,999.00 from Papich Construction, while the Engineer's Estimate was $33,858,081.00. The project is being procured through full and open competition with a HUBZone price preference. The anticipated construction schedule is from April 2025 through October 2027, with an estimated cost range of $25M to $35M. The Federal Highway Administration is the agency responsible for this contract opportunity.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Opening Summary
Project Name: MINERAL KING ROAD Project Number: CA FTNP SEKI 13 (2) Bid Opening Date: 11/6/2024 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Jorey Deml
Amendments: (1) A001-10/25/24 (2) A002- 11/4/2024
Bidder’s Name Schedule A Option X Option Y BID TOTAL
1. Steve Manning
Construction Redding, CA
$22,709.588.00 $9,798,967.50 $9,864,714.30 $42,373,269.80
2. Granite Construction Fresno, CA
$28,348,363.50 $9,441,503.25 $12,480,993.50 $50,280,860.25
3. Papich Construction Arroyo Grande,CA
$22,536,225.13 $8,269,502.84 $11,194,271.03 $41,999,999.00
4. Martin Brothers Construction Sacramento,CA
$22,296,500.00 $8,899,210.65 $11,688,397.50 $42,884,108.15
Engineer’s Estimate
$17,061,598.00 $7,671,151.00 $9,125,332.00 $33,858,081.00