Plans - Final - CA FTNP SEKI 13(2) Mineral King Road.pdf
PDF 57 MB Posted
- Attached to
- CA FTNP SEKI 13(2) Mineral King Road
- Solicitation number
- 6982AF24B000017
About this file
This document is an Invitation for Bid (IFB) for the CA FTNP SEKI 13(2) Mineral King Road project. The scope of work includes pulverization of existing pavement, aggregate base placement, asphalt paving, construction of soldier pile walls, soil nail walls, and special rock embankment, as well as drainage improvements such as ditch paving, culvert replacement, and inlet installation. The project is located within Sequoia and Kings Canyon National Park in California and is estimated to cost between $25M and $35M. The work is anticipated to be performed from April 2025 through October 2027, with a pre-bid meeting scheduled for October 2024 and the solicitation to be advertised in October 2024. This is a full and open competition with a HUBZone price preference. The procuring agency is the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .