C-130J Minotaur Missionization

Award Notice Posted

Solicitation number
HSCG2315R2DA002
Agency
Awarded
to L3Harris Technologies Integrated Systems L.P.
Set-aside
No set-aside

Opportunity facts

Contract number
HSCG2315R2DA002 Federal contract award
NAICS code
336411 Aircraft Manufacturing
PSC
Not on record
Place of performance
TBD, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

The U.S. Coast Guard (USCG) is issuing this Request for Proposal (Amendment 2) for the following:

USCG has a requirement to perform post-production modifications (missionization) on newly delivered C-130J aircraft. The Missionization effort involves nose-to-tail modifications to the aircraft to incorporate the next-generation Minotaur Mission System Suite (MSS+) as well as the radar, sensors, and remaining C4ISR equipment that will enable aircrew to gather and process surveillance information for transmission to other shore and surface operators.

Additionally, existing HC-130J aircraft (already missionized) must undergo modifications to be retrofitted with the MSS+ solution. These aircraft currently contain a legacy Mission System Suite (MSS) that is no longer procurable in its current configuration and has become economically unsupportable due to diminishing manufacturing sources (DMS) and material obsolescence. Removing the legacy MSS and incorporating the MSS+ on these aircraft will significantly mitigate the effects of both hardware and software obsolescence, plus offer an increase in Mission System performance over the legacy MSS.

Questions due 6 April 2015-COMPLETED

Amendment 1 includes 1)Q&A responses, 2)minimal SOW changes w TCTO language, 3)GFE/GFI list update, 4)Pricing Sheet update 5)CDRLs update

Request AMRDEC access to KO via email to retrieve actual TCTOs (Adobe Pdf/MS Access Format), drawing and Test Procedures

One on Ones conducted 7 May 2015 - COMPLETED
Aircraft Site Visit conducted 14 May 2015 - COMPLETED

Amendment 2 includes 1)Q&A additional responses 2)minimal SOW changes 3)Revised PPQ 4)Pricing Sheet update 5)CDRLs update 6)GFR clause w/ CIM instruction

Future pics/TCTO updates/direction will be via AMRDEC to expedite info flow.

Proposal due date corrected to 2 July 2015 since 3 July is a holiday.

Update #3 ·

The U.S. Coast Guard (USCG) is issuing this Request for Proposal (Amendment 1) for the following:

USCG has a requirement to perform post-production modifications (missionization) on newly delivered C-130J aircraft. The Missionization effort involves nose-to-tail modifications to the aircraft to incorporate the next-generation Minotaur Mission System Suite (MSS+) as well as the radar, sensors, and remaining C4ISR equipment that will enable aircrew to gather and process surveillance information for transmission to other shore and surface operators.

Additionally, existing HC-130J aircraft (already missionized) must undergo modifications to be retrofitted with the MSS+ solution. These aircraft currently contain a legacy Mission System Suite (MSS) that is no longer procurable in its current configuration and has become economically unsupportable due to diminishing manufacturing sources (DMS) and material obsolescence. Removing the legacy MSS and incorporating the MSS+ on these aircraft will significantly mitigate the effects of both hardware and software obsolescence, plus offer an increase in Mission System performance over the legacy MSS.


Questions due 06 April 2015-COMPLETED

Amendment 1 includes 1)Q&A responses, 2)minimal SOW changes w TCTO language, 3)GFE/GFI list update, 4)Pricing Sheet update 5)CDRLs update

Request AMRDEC access to KO via email to retrieve actual TCTOs (Adobe Pdf/MS Access Format), drawing and Test Procedures

Pay attention to Q&A #125, One on One Phone or In person Site visits to DHS DC HQ/Pax River and notify KO via email if interested ASAP

Proposal due date extended to 3 July 2015

Update #2 ·

The U.S. Coast Guard (USCG) is issuing this Request for Proposal for the following:

USCG has a requirement to perform post-production modifications (missionization) on newly delivered C-130J aircraft. The Missionization effort involves nose-to-tail modifications to the aircraft to incorporate the next-generation Minotaur Mission System Suite (MSS+) as well as the radar, sensors, and remaining C4ISR equipment that will enable aircrew to gather and process surveillance information for transmission to other shore and surface operators.

Additionally, existing HC-130J aircraft (already missionized) must undergo modifications to be retrofitted with the MSS+ solution. These aircraft currently contain a legacy Mission System Suite (MSS) that is no longer procurable in its current configuration and has become economically unsupportable due to diminishing manufacturing sources (DMS) and material obsolescence. Removing the legacy MSS and incorporating the MSS+ on these aircraft will significantly mitigate the effects of both hardware and software obsolescence, plus offer an increase in Mission System performance over the legacy MSS.



Questions due 06 April 2015
Proposals due 03 June 2015

Update #1 ·

The U.S. Coast Guard (USCG) has a requirement to perform post-production modifications (missionization) on newly delivered C-130J aircraft. The Missionization effort involves nose-to-tail modifications to the aircraft to incorporate the next-generation Minotaur Mission System Suite (MSS+) as well as the radar, sensors, and remaining C4ISR equipment that will enable aircrew to gather and process surveillance information for transmission to other shore and surface operators.

Additionally, existing HC-130J aircraft (already missionized) must undergo modifications to be retrofitted with the MSS+ solution. These aircraft currently contain a legacy Mission System Suite (MSS) that is no longer procurable in its current configuration and has become economically unsupportable due to diminishing manufacturing sources (DMS) and material obsolescence. Removing the legacy MSS and incorporating the MSS+ on these aircraft will significantly mitigate the effects of both hardware and software obsolescence, plus offer an increase in Mission System performance over the legacy MSS.

USCG plans to issue one competitive solicitation through FedBizOpps by the end of this calendar year 2014.

Files

File Type Posted
Attachment_J-9_Pricing_Sheet_Amend_2.xlsx XLSX spreadsheet
Q A_Spreadsheet_(28MAY2015).xlsx XLSX spreadsheet
Attachment_J-10_CDRLs_Amend_2.docx DOCX document
Attachment_J-11_PPQ.docx DOCX document
Attachment_J-1___SOW_(15MAY).docx DOCX document
GFR_clause.doc DOC document
CIM_13020_3A.pdf PDF
Q A_Spreadsheet_(23APR2015).xlsx XLSX spreadsheet
Attachment_J-1___SOW_Amend_1.docx DOCX document
Attachment_J-4_GFEGFI_Amend_1.docx DOCX document
Attachment_J-10_CDRLs_Amend_1.docx DOCX document
Attachment_J-9_Pricing_Sheet_Amend_1.xlsx XLSX spreadsheet
Attachment_J-12_AssetMaintSystem.pdf PDF
Attachment_J-4_GFEGFI.pdf PDF
Attachment_J-5_MPCs.pdf PDF
Attachment_J-7_TCTO_List.pdf PDF
Attachment_J-8_DD250.pdf PDF
Attachment_J-11_PPQ.docx DOCX document
Attachment_J-10_CDRLs.pdf PDF
Attachment_J-9_Pricing_Sheet.xlsx XLSX spreadsheet
HSCG2315R2DA002_TDP_Paint_Spec_Instructions.docx DOCX document
HSCG2315R2DA002_RFP.pdf PDF
Attachment_J-1___SOW.pdf PDF
Show all 23

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors