CDRLs amendment 1 in Word Format (in Track changes state for review please change to final for printing purposes)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CIM_13020_3A.pdf | ||
| Attachment_J-9_Pricing_Sheet_Amend_2.xlsx | XLSX spreadsheet | |
| Q A_Spreadsheet_(28MAY2015).xlsx | XLSX spreadsheet | |
| Attachment_J-10_CDRLs_Amend_2.docx | DOCX document | |
| GFR_clause.doc | DOC document | |
| Attachment_J-11_PPQ.docx | DOCX document | |
| Attachment_J-1___SOW_(15MAY).docx | DOCX document | |
| Attachment_J-1___SOW_Amend_1.docx | DOCX document | |
| Q A_Spreadsheet_(23APR2015).xlsx | XLSX spreadsheet | |
| Attachment_J-4_GFEGFI_Amend_1.docx | DOCX document | |
| Attachment_J-9_Pricing_Sheet_Amend_1.xlsx | XLSX spreadsheet | |
| Attachment_J-5_MPCs.pdf | ||
| Attachment_J-9_Pricing_Sheet.xlsx | XLSX spreadsheet | |
| HSCG2315R2DA002_TDP_Paint_Spec_Instructions.docx | DOCX document | |
| Attachment_J-8_DD250.pdf | ||
| Attachment_J-7_TCTO_List.pdf | ||
| Attachment_J-12_AssetMaintSystem.pdf | ||
| Attachment_J-11_PPQ.docx | DOCX document | |
| HSCG2315R2DA002_RFP.pdf | ||
| Attachment_J-4_GFEGFI.pdf | ||
| Attachment_J-10_CDRLs.pdf | ||
| Attachment_J-1___SOW.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J-10
CONTRACT DATA REQUIREMENTS LIST (CDRL) FOR THE USCG HC‐130J MINOTAUR MISSIONIZATION PROJECT Contents: GENERAL NOTES ABBREVIATIONS DD FORM‐1423
PREPARED BY
UNITED STATES COAST GUARD HC‐130J ACQUISITIONS OFFICE (CG‐9311)
Page of
CDRL GENERAL INSTRUCTIONS SCOPE
This Contract Data Requirements List (CDRL) establishes the required Contractor data deliverables, and their submittal, approval, and distribution requirements.
GENERAL
The Data Item Descriptions (DIDs) (DD Form 1664) specified in the CDRL Block 4 are all "active" at time of contract award. They are available online at the United States Government (USG) Acquisition Streamlining and Standardization Information System (ASSIST). The referenced DID are included as attachments to the respective CDRL DD‐1423.
RIGHTS IN TECHNICAL DATA
In accordance with FAR 52.227‐14 Rights in Data (General), the Contractor shall convey and deliver unlimited rights to all technical and programmatic data produced under this contract. In addition, the Contractor shall convey unlimited rights to all data produced under this contract, but not contracted for delivery.
TAILORED DATA ITEMS
A slash (/) and the letter "T" (e.g., DI‐SESS‐81000E/T) appended to the Block 4 DID number of the DD Form 1423 denotes tailoring of the DID to comply with specific system or program requirements. Thereafter, Block 16 identifies the unique tailoring instructions each applicable DD Form 1423.
MODIFICATION OF DATA REQUIREMENTS
Occasionally during the performance of this contract, the United States Coast Guard (USCG) Contracting Officer (CO) may unilaterally change the place of delivery and the technical office for any CDRL at no change in contract price. If there is a change in the place of delivery, the Contractor and the CO may mutually agree to an extension of the required submittal date.
The following definitions apply to Block 8 of the DD Form 1423:
The use of an "A" in Block 8 indicates that the Government must approve the identified CDRL data. The USCG Office of Primary Responsibility (OPR) designated in Block 6 of the DD Form 1423 consolidates USCG evaluations and respond through the CO to the Contractor within forty‐five (45) days after receipt of the data submittal unless specified otherwise within the CDRL.
If Block 8 is blank, or there is an "N" (or an "N/A") in this block, then USCG approval for these data items is not required. However, this does not relieve the Contractor of the responsibility of compliance with applicable regulations, standards, procedures, etc. All data submissions are subject to USCG review and approval by the procuring agency for departure of said compliance.
The USCG will formally respond to the Contractor within forty‐five (45) days after receiving any data determined by the USCG as being deficient and/or technically disapproved.
The Contract shall not regard data submittal requirements as complete or fulfilled until CG‐9311 determines that all contractual requirements are satisfactory.
When referring to numbers of days for frequency, submittals, and subsequent submittals ‐ all days are "business" days unless otherwise stated elsewhere on the DD Form 1423 or the Statement of Work.
REVISIONS TO DATA SUBMITTALS AND RESUBMITTALS OF DATA
Unless otherwise specified, the Contractor shall revise and resubmit disapproved data within thirty (30) business days after receipt of the official USCG Contracting Officer (CO) notification. If the Contractor determines that they cannot resubmit within the initial forty‐five (45)thirty (30) days, then the Contractor shall notify the USCG writing prior to the due date, and establish a new suspense date.
If "ASREQ" appears in Block 13 of the DD Form 1423 with no explanatory remarks in Block 16, the Contractor shall revise data as necessary to maintain the data's currency and accuracy.
DATA PREPARATION
Data submitted by the Contractor shall conform to the quality requirements specified on the CDRL for each item. If the data preparation instructions contained in Block 16 of the DD Form 1423 are different from the instructions contained in Block 10 of the DID, the DD Form 1423 Block 16 instructions shall take precedence.
DOCUMENTATION MARKING
Documents must be marked on the cover page with an appropriate corresponding distribution statement prior to submittal.
Submitted data is subject to the distribution statements of DD Form 1423, Block 9.
As annotated in Block 9 of the DD Form 1423, the following distribution and warning statements will apply to all data acquired under this contract:
"DISTRIBUTION STATEMENT A" ‐ Approved for public release; distribution is unlimited "DISTRIBUTION STATEMENT B" ‐ Distribution authorized to USG agencies only. The HC‐130J Acquisition Program Office (CG‐9311) will review and approve or disapprove all other requests.
"DISTRIBUTION STATEMENT C" ‐ Distribution authorized to USG agencies and their Contractors. The HC‐ 130J Acquisition Program Office (CG‐9311) will review and approve or disapprove all other requests.
"DISTRIBUTION STATEMENT D" ‐ Distribution authorized to the Department of Homeland Security (DHS) and DHS Contractors only. The HC‐130J Acquisition Program Office (CG‐9311) will review and approve or disapprove all other requests.
"DISTRIBUTION STATEMENT E" ‐ Distribution authorized to DHS Components only.
"DISTRIBUTION STATEMENT F" ‐ Further dissemination only as directed by the HC‐130J Acquisition Program Office
If the Contractor or the USCG requires an export then either party may include the following statement on the document:
"WARNING ‐ This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, USC, App 2401, et seq. Violations of these export laws are subject to severe criminal penalties. Dissemination shall be in accordance with provisions of DoD Directive 5230.25."
The Contractor shall not provide copies of any data acquired under a CDRL to activities not specifically identified in the distribution block of the CDRL without written USCG approval from either the C‐ 130J USCG HC‐130J Office of Acquisitions (CG‐9311), or the C‐130J Contracting Officer (CO).
Formatting and Content Method of Transmittal
In addition to DD 250 requirements (where applicable), DD Form 1423, Block 7, shall specify data transmittal requirements.
Unless otherwise specified on the DD Form 1423, the Contractor shall deliver data items using electronically via an online Data Management System. The Contractor shall use email (see table below) for delivery notification of data deliverables.
| CG‐9311 Data Manager |
| CG9311DM@uscg.mil |
| ALC HC‐130J Product Line |
| ALC130DM@uscg.mil |
| USCG HQ CG‐9311 CO |
| TBD |
Letter of Transmittal (LT) ‐ The Contractor may satisfy the requirement for "LT" delivery via electronic message (e.g. email with attachments or embedded hyperlinks). The message shall convey all contractually required information, including signature and electronic signature. The letter of transmittal and/or notification shall include as a minimum:
Contract number reference Program name Data item number Title CDRL sequence number Revision level Any Contractor control number assigned to those included data The data itself shall also contain the above information.
For electronic message notifications, the Contractor shall include notification of all the applicable required recipients (as identified in Block 14 of the DD Forms 1423).
The Contractor shall ensure receipt of transmittals via email delivery notifications. Deliveries without email delivery receipts are not deliveries.
Unless otherwise specified in Block 16 of the DD Form 1423, the data submittal date is the date of letter of transmittal. If the scheduled delivery date of any data item falls on a weekend (Saturday or Sunday), or
Federal holiday, the next scheduled delivery date for the data item and tracking record will reflect the following business day after the weekend or Federal holiday.
For each data item in the CDRL, the Contractor shall clearly state in the final transmittal letter that this is the last submittal being made and that all contractual requirements concerning that data item have hereby been fulfilled.
The Industrial Security Manual shall govern the submission of classified data.
When the same documentation is required on multiple contracts, the Contractor shall provide only one data submittal per addressee in accordance with (lAW) Block 14 of the applicable DD Forms 1423. When updates are required on one contract and not any other, then all addressees will receive the updates to the documentation lAW the CDRL Block 14 distribution requirements.
The Contractor shall notify the USCG HC‐130J Acquisition Program Office (CG‐9311), the USCG Aviation Logistics Center (ALC) HC‐130J Product Line.
Unless otherwise specified with the applicable DD 1423, all data deliverable shall be compatible with the Microsoft Vista Operating System, Internet Explorer 9, and Microsoft Office 2007 applications.
CDRL Abbreviations
| #MAC |
| Months after contract award ("6MAC" means "6 months after contract award") |
| #MAO |
| (Calendar) months after task or delivery order |
| #TIME |
| Number of times to be submitted ("2TIME" means "2 times") |
| ANNLY |
| Annually, once per year |
| ASGEN |
| As generated |
| ASREQ |
| As required |
| BI‐MO |
| Bimonthly, every two months |
| BI‐WE |
| Biweekly, every two weeks |
| CAD |
| Computer‐aided design |
| CASE |
| Computer‐aided software engineering |
| CFE |
| Contractor furnished equipment |
| DAILY |
| Once per (business) day |
| DFDEL |
| Deferred delivery |
| EOC |
| End of contract |
| EOM |
| End of (calendar) month |
| EOQ |
| End of quarter |
| GFE |
| Government furnished equipment |
| GFI |
| Government furnished information |
| GFM |
| Government furnished material |
| IAW |
| In accordance with |
| IDS |
| Integrated Deepwater System |
| IPDE |
| Integrated product data environment |
| LT |
| Letter of transmittal |
| MNTHLY |
| Monthly, once per month |
| NLT |
| Not later than |
| N/A |
| Not applicable |
| ONE/P |
| One time, with preliminary draft |
| ONE/R |
| One time, with revisions |
| OTIME |
| One time |
| QRTLY |
| Quarterly |
| R/ASR |
| Revisions as required |
| SEMIA |
| Semiannually, every six months |
| TBD |
| To be determined |
| WEKLY |
| Weekly, once per week |
| #DAC |
| (Calendar) days after contract award ("30DAC" means "30 calendar days after contract award") |
| #DACM |
| (Calendar) days after contract modification ("30DACM" means "30 calendar days after contract modification") |
| #DAO |
| (Calendar) days after task or delivery order |
| #DARC |
| (Calendar) days after receipt of comments ("30DARC" means "30 days after receipt of comments") |
| #DARP |
| (Calendar) days after reporting period ("10DARP" means "10 calendar days after the end of the reporting period") |
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
ADMIN
TDP
TM
OTHER
D.
SYSTEM/ITEM
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A001 2.
TITLE
OF
DATA
ITEM
MANAGMENT
PLAN
3.
SUBTITLE
Project
Management
Plan
(PMP)
4.
AUTHORITY
(Data
Acquisition
Document
No.)
DI-MGMT-80004A
5.
CONTRACT
REFERENCE
SOW
5.1.2 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
LT
9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
ONE/R
12.
DATE
OF
FIRST
SUBMISSION
30DAC
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
N/A 13.
DATE
OF
SUBSEQUENT
SUBMISSION
ASREQ
Draft Final Reg Repro 16.
REMARKS
BLOCK
4:
In addition the the content elements of
DI-MGMT-80004A,
the
Contractor shall address the following
PMP topics.
The
Contractor shall address each
PMP element below with regard to who, what, where, when, and how each shall be accomplished:
Program Oversight Resource Planning Scheduling Manufacturing
Planning Configuration
Control
And Data Management Risk
Identification
And Mitigation Production Planning Quality
Assurance Planning
(QAP)
Milestones Quality
Management
Plan Subcontractor
Management
Plan Technical
Approach Task
Coordination Administrative
Oversight
CG-9311
(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
17.
PRICE
GROUP
DD
FORM
1423-1, FEB
PREVIOUS
EDITION
MAY
BE
USED.
Page of Pages
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
ADMIN
TDP
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A002 2.
TITLE
OF
DATA
ITEM
CONFERENCE
AGENDA
3.
SUBTITLE
4.
AUTHORITY
(Data
Acquisition
Document
No.)
DI-ADMN-81249A
5.
CONTRACT
REFERENCE
SOW
5.4.2 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
LT
9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
BLOCK
12.
DATE
OF
FIRST
SUBMISSION
BLOCK
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
N/A 13.
DATE
OF
SUBSEQUENT
SUBMISSION
BLOCK
Draft Final Reg Repro 16.
REMARKS
Block
4:
The
Contractor must address the elements contained in the
DID, and may select additional agenda elements
(headings) with
USCG
approval.
However, as a minimum, the
Contractor format must address the following elements:
Agendas shall be developed and submitted to the
USCG
for the following reviews, audits and/or meetings:
Design
Reviews Audits Program Management
Reviews
(PMR)
Technical
Exchange
Meetings
(TIM)
Integrated
Logistics
Support
(ILS)
Meetings Program Kickoff Production
Readiness
Review Flight
Readiness
Review For all meetings and conferences, the
USCG
will approve all charts, final agenda, and presentation materials For technical design reviews and audits, the agendas shall include
USCG
coordinated and approved entrance and exit criteria consistent with approved Integrated
Master Schedule.
Blocks
8, 10, 12 and
13:
Preliminary copies of the agenda shall be submitted
NLT
Federal business days prior to each scheduled review, audit, and/or meeting.
Final agenda and charts shall be submitted
NLT
business days prior to the scheduled review, audit ,and /or meeting.
The
USCG
recognizes that minor updates due to last minute changes to agenda and presentation materials may be necessary.
If there are changes, final presentation materials shall be published with the meeting minutes At each
Contractor-hosted meeting, the
Contractor shall provide each
USCG
or Government attendee with unrestricted wireless
(Wi-Fi)
Internet access.
The
Contractor
Internet provision shall provide a aggregated throughput of not less than 10 million
(M)-bits per second (Mbps) downlink, and
5 (Mbps) uplink.
CG-9311
(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
ADMIN
TDP
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A003 2.
TITLE
OF
DATA
ITEM
CONFERENCE
MINUTES
3.
SUBTITLE
4.
AUTHORITY
(Data
Acquisition
Document
No.)
DI-ADMN-81250A/T
5.
CONTRACT
REFERENCE
SOW
5.4.3 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
N/A 9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
BLK16
12.
DATE
OF
FIRST
SUBMISSION
BLK16
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
N/A 13.
DATE
OF
SUBSEQUENT
SUBMISSION
BLK16
Draft Final Reg Repro 16.
REMARKS
Block
4:
The minutes shall be Microsoft Word compatible and comply with the
Block
DID.
In addition, the requirements of
DI-ADMN-81250A
are extended and amended as follows:
The Minutes document shall consist of three
(3) major sections.
The
Contractor may include other major or minor sections if required to fully clarify the meeting results or background.
Section
1 - Table of attendees with with the following data elements:
attendee's names, organizations, email addresses, primary telephone numbers, and optionally the attendee's mobile number.
Section
2 - Table format;
if the minutes include
PowerPoint presentations, the Contractor shall index the discussions, remarks, conclusions, and resulting action items to the relevant slide number or title.
At a minimum, the minutes
Section table shall contain four fields:
Presentation
Title Slide or Document Index Discussion summary with relevant decisions Resulting action items with action assignee and target completion date Section
3 - Remarks/Notes:
Attendees may include pertinent remarks or notes.
If meetings include distributed printed material, the
Contractor shall index the comments/actions to the relevant document paragraph or page number.
Should there be no point of reference
(slides, electronic documents, printed materials, photos, etc.)
the
Contractor shall enter the topic of discussion in each index field.
The
Contractor shall record and deliver minutes for all scheduled programmatic and technical meeting.
Block
12:
All minutes shall be submitted within 7 calendar days after completion of the meeting for USCG approval, review, and comment.
Block
14:
The
Contractor shall provide minutes to each meeting attendee.
CG-9311(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
ADMIN
TDP
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A004 2.
TITLE
OF
DATA
ITEM
INTEGRATED
MASTER
SCHEDULE
(IMS)
3.
SUBTITLE
4.
AUTHORITY
(Data
Acquisition
Document
No.)
DI-MGMT-81861
5.
CONTRACT
REFERENCE
SOW
5.2.1 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
LT
9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
MTHLY
12.
DATE
OF
FIRST
SUBMISSION
30DAC
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
BLOCK
13.
DATE
OF
SUBSEQUENT
SUBMISSION
10DARP
Draft Final Reg Repro 16.
REMARKS
Block
4:
Deliver in
Microsoft
Project
2007, Adobe
PDF (searchable), Microsoft
Excel compatible formats.
The
Contractor shall develop, maintain, and update the
IMS throughout the performance of the contract.
The
Contractor's
IMS will present at least
5 Production
WBS
levels.
The
IMS shall include
USCG
Inspection Hold Points that coincide with
WBS
levels corresponding to major subsystem installation and checkout.
The
Hold
Points shall be subject to
USCG
approval.
The
G an tt Chart view shall clearly depict the project's critical path in a
BOLD
blue color.
Each submittal shall include a spreadsheet that with data elements clearly indicating changes in task completion, milestones, and completion percentages.
The
Contractor’s
IMS
shall provide all significant project milestones, production schedules, test schedules, key events, and contract deliverables.
The
Contractor shall notify the
Government of delays to completion of Program
Milestones
(those events with a duration of zero
(0) days within the
IMS)
exceeding one
(1) day.
The
Contractor shall notify the
USCG
within hours of Contractor schedule change acceptance.
The
Contractor shall update the
IMS as updates occur.
The
IMS updates shall clearly annotate and highlight all changes since the last
IMS
update.
The
IMS shall display the original baseline, actual, and current estimates for completion.
Blocks
10, 12, and
13:
Initial submittal shall be provided calendar days after contract award.
Subsequent submittal shall be monthly thereafter and within calendar days after the end of the reporting month.
CG-9311(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
TDP
X
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A005 2.
TITLE
OF
DATA
ITEM
Request for Deviation
(RFD)
3.
SUBTITLE
4.
AUTHORITY
(Data
Acquisition
Document
No.)
DI-CMAN-80640C/T
5.
CONTRACT
REFERENCE
SOW
5.9.1 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
LT
9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
ASREQ
12.
DATE
OF
FIRST
SUBMISSION
ASREQ
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
N/A 13.
DATE
OF
SUBSEQUENT
SUBMISSION
ASREQ
Draft Final Reg Repro 16.
REMARKS
Block
4:
Contractor format is acceptable.
The
Contractor shall prepare a deviation documenting a departure from the
USCG approved specification wherein a change to that specification is deemed not warranted.
The deviation shall also contain:
A Safety Impact
Assessment, completed using
Task of MIL-STD-882E as a guide, and An evaluation of the effect of the total safety impact of all existing deviations to the aircraft.
Contractor shall use
MIL-STD-973
as a guide when determining applicability as a deviation.
CG-9311(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
TDP
X
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A006 2.
TITLE
OF
DATA
ITEM
PRODUCT
DRAWINGS,
MODELS,
AND
ASSOCIATED
LISTS
3.
SUBTITLE
Technical
Data
Package
(TDP)
Production
Drawing
Models with
Associated
Lists 4.
AUTHORITY
(Data
Acquisition
Document
No.)
DI-SESS-81000E
5.
CONTRACT
REFERENCE
SOW
5.10.4, 5.11.5 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
LT
9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
BLOCK16
12.
DATE
OF
FIRST
SUBMISSION
30DAC/BLOCK
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
N/A 13.
DATE
OF
SUBSEQUENT
SUBMISSION
BLOCK16
Draft Final Reg Repro
REMARKS
Blocks
,12
13:
The
Contractor shall provide incremental submittals of production-level drawing, models, and associated lists.
TDP
File Formats:
All Drawing and Schematics
- Contractor's
CAD
application
"native" or
"source" file format(s).
Three Dimensional
(3D) Drawing and Models
- 1 ea.
ISO 13303.21-compliant
STEP
(STP).
Two Dimensional
(2D) Drawing and Schematics
- 1 ea.
of AutoCAD
DWG
and
DXF.
The
Contractor shall deliver a preliminary
TDP
days after contract award.
The
Contractor shall notify the
USCG
monthly of all changes to the
TDP
after the first preliminary delivery.
The
Contractor shall delivery the final
TDP
NLT
days of the last aircraft modification completion and
USCG
DD250
execution.
The final
TDP
shall be complete in all respects prior to final submission to the
USCG.
TDP
File Formats:
All Drawing and Schematics
- Contractor's
CAD
application
"native" or
"source" file format(s).
Three Dimensional
(3D) Drawing and Models
- 1 ea.
ISO 13303.21-compliant
STEP
(STP).
Two Dimensional
(2D) Drawing and Schematics
- 1 ea.
of AutoCAD
DWG
and
DXF.
CG-9311(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
ADMIN
TDP
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A007 2.
TITLE
OF
DATA
ITEM
ENGINEERING
CHANGE
PROPOSALS
(ECP)
3.
SUBTITLE
4.
AUTHORITY
(Data
Acquisition
Document
No.)
DI-CMAN-80639C
5.
CONTRACT
REFERENCE
SOW
5.8.1 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
LT
9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
ASREQ
12.
DATE
OF
FIRST
SUBMISSION
ASREQ
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
N/A 13.
DATE
OF
SUBSEQUENT
SUBMISSION
ASREQ
Draft Final Reg Repro 16.
REMARKS
CONTRACTOR
CONTENT
FORMAT
PERMITTED
IAW
BLOCK
CG-9311(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
MISC
TDP
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A008 2.
TITLE
OF
DATA
ITEM
TECHNICAL
REPORT-STUDY/SERVICES
3.
SUBTITLE
SUPPLY
ITEM
CHANGE
RECORD
(SICR)
4.
AUTHORITY
(Data
Acquisition
Document
No.)
Dl-MISC-80508B 5.
CONTRACT
REFERENCE
SOW
5.12.1 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
LT
9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
ONE/R
12.
DATE
OF
FIRST
SUBMISSION
ASREQ
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
N/A 13.
DATE
OF
SUBSEQUENT
SUBMISSION
ASREQ
Draft Final Reg Repro 16.
REMARKS
Block
4:
Contractor format acceptable.
Contractor shall use the attached document and
ALC
INST
5213.1F for guidance.
Contractor shall deliver
SICR
data electronically via pdf ) or (.
docx file.
SICR
data shall be provided if the
Contractor:
1.)
Utilizes a part without an established part number in the
USCG
supply system
2.)
Utilizes a part that incorporates a part or part number modification.
The
Contractor is not required to provide
SICR
data for component changes within
Line
Replaceable
Units
(LRU).
In all cases the
Contractor shall provide relevant technical data with
SICR
submissions required to support interchangeability.
Block
8:
Approval will be provided within calendar days of submittal date or
Contractor shall consider report automatically approve d if no comments are received.
CG-9311(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
SUPPLY ITEM CHANGE REQUEST (SICR)
Use/ Relationships: The Contractor shall provide Supply Item Change Request (SICR) data for any part number changes that occur to the MSS+ configuration during the period of performance of this contract. For the purposes of SICR data, changes are defined as changes that incorporate a part or part number modification, or changes that incorporate a part without an established part number in the USCG supply system. These changes shall include, but are not limited to; Line Replaceable Units (LRUs) and/or piece parts (i.e. nuts, bolts, bulbs, etc.) but not include component changes within a LRU. The SICR data must include technical data to support interchangeability.
(1) Old P/N
· Part Number
· Cage Code
· Nomenclature
· NSN
(2) New P/N
· Part Number o Cage Code o Shelf Life
· Nomenclature
(3) Reason for P/N Change
· Administrative Purposes only (Same Form, Fit, Function, and interface)
· Material Change (if Yes Explain)
· Manufacturer Change (does it affect interchangeability? if yes Explain)
· Design Change (if Yes Explain)
· Other Reason (Explain)
(4) Interchangeability:
· Same Form, Fit, Function, and Interface as old P/N (Two-way Interchangeable)
· One-way Interchangeable: (Explain)
· If old Item is repairable, can old item be upgraded to new item (Y or N) (If yes provide procedures to upgrade old item)
· Conditional Interchangeability (Explain)
(Examples: Only applicable to certain aircraft; Form and Fit not the same for all aircraft)
· Not Interchangeable: (Explain):
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
NDTI
TDP
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A009 2.
TITLE
OF
DATA
ITEM
TEST/INSPECTION
REPORT
3.
SUBTITLE
4.
AUTHORITY
(Data
Acquisition
Document
No.)
DI-NDTI-80809B
5.
CONTRACT
REFERENCE
SOW
5.17.4 6.
REQUIRING
OFFICE
USCG
CG-9311
7.
DD
REQ
LT
9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
ASREQ
12.
DATE
OF
FIRST
SUBMISSION
60DAC
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
N/A 13.
DATE
OF
SUBSEQUENT
SUBMISSION
ASREQ
Draft Final Reg Repro 16.
REMARKS
Block
4:
Comply with Block
4;
Contractor format permitted to augment the data elements of Block
4;
USCG
approval of format.
This
CDRL
applies to all Contractor generated test reports
(lab, ground, and flight).
Blocks
10, 12 and
13:
Reports will be submitted no later than days after completion of each tests
CG-9311(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
17.
PRICE
GROUP
DD
FORM
1423-1, FEB
PREVIOUS
EDITION
MAY
BE
USED.
Page of Pages
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
ADMIN
TDP
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A010 2.
TITLE
OF
DATA
ITEM
CONFIGURATION
MANGEMENT
PLAN
3.
SUBTITLE
4.
AUTHORITY
(Data
Acquisition
Document
No.)
N/A 5.
CONTRACT
REFERENCE
SOW
5.5.6 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
LT
9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
ASREQ
12.
DATE
OF
FIRST
SUBMISSION
30DAC
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
N/A 13.
DATE
OF
SUBSEQUENT
SUBMISSION
ASREQ
Draft Final Reg Repro 16.
REMARKS
The
Contractor’s
CM
Plan shall adhere to principles and guidance contained in MIL-STD-61A and
USCG
CIM
4130.6B.
CG-9311(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
SESS
TDP
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A011 2.
TITLE
OF
DATA
ITEM
CONFIGURATION
IDENTIFICATION
& REPORTING
(CI&R)
3.
SUBTITLE
4.
AUTHORITY
(Data
Acquisition
Document
No.)
DI-SESS-81121A
5.
CONTRACT
REFERENCE
SOW
5.6.8 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
LT
9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
MNTHLY
12.
DATE
OF
FIRST
SUBMISSION
30DAC
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
N/A 13.
DATE
OF
SUBSEQUENT
SUBMISSION
ASREQ
Draft Final Reg Repro 16.
REMARKS
The
Contractor shall develop and maintain an aircraft modification work breakdown structure
IAW
MIL-HDBK-881.
The
Contractor shall develop product drawings
IAW
MIL-STD-31000A
and
DID#
DI-DRPR-81000.
The
Contractor shall develop and provide changes to the
GFI Technical
Data Packages
IAW
DID# DI-SESS-80776A.
The
Contractor shall prepare baseline description documents per
DID#
DI-SESS-81121A.
Configuration
Control
(CC).
CG-9311(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
ADMIN
TDP
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A012 2.
TITLE
OF
DATA
ITEM
CONFIGURATION
STATUS ACCOUNTING
(CSA)
3.
SUBTITLE
4.
AUTHORITY
(Data
Acquisition
Document
No.)
DI-CMAN-81253A
5.
CONTRACT
REFERENCE
SOW
5.7.3 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
N/A 9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
ASREQ
12.
DATE
OF
FIRST
SUBMISSION
30DAC
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
N/A 13.
DATE
OF
SUBSEQUENT
SUBMISSION
ASREQ
Draft Final Reg Repro 16.
REMARKS
Contractor format permitted
IAW
Block
4;
comply with block
4 DID
CG-9311(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
CONTRACT
DATA
REQUIREMENTS
LIST
(1
Data
Item) Form
Approved
OMB
No.
0704-0188 The public reporting burden for this collection of information is estimated to average hours per response, including the ti me for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comm e nts regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the
Department of
Defense, Executive
Services and
Communications
Directorate
(0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB
control number.
Please do not return your form to the above organization.
Send completed form to the
Government
Issuing
Contracting
Officer for the
Contract/PR
No.
listed in
Block
E.
A.
CONTRACT
LINE
ITEM
NO.
00001/00002 B.
EXHIBIT
A C.
CATEGORY:
ADMIN
TDP
USCG
HC/C-130J
MISSIONIZATION
E.
CONTRACT/PR
NO.
F.
CONTRACTOR
1.
DATA
ITEM
NO.
A013 2.
TITLE
OF
DATA
ITEM
DATA
MANAGEMENT
PLAN
3.
SUBTITLE
4.
AUTHORITY
(Data
Acquisition
Document
No.)
N/A 5.
CONTRACT
REFERENCE
SOW
5.10.3, 5.10.4 6.
REQUIRING
OFFICE
USCG
HQ
CG-9311
7.
DD
REQ
N/A 9.
DIST
STATEMENT
REQUIRED
C 10.
FREQUENCY
ONE/R
12.
DATE
OF
FIRST
SUBMISSION
30DAC
14.
DISTRIBUTION
a.
ADDRESSEE
b.
COPIES
8.
APP
CODE
A 11.
AS
OF
DATE
13.
DATE
OF
SUBSEQUENT
SUBMISSION
ASREQ
Draft Final Reg Repro 16.
REMARKS
See attached
Data
Plan
Elements.
CG-9311(DM)
ALC/HC-130J
PL
15.
TOTAL
G.
PREPARED
BY
H.
DATE
I.
APPROVED
BY
J.
DATE
18.
ESTIMATED
TOTAL
PRICE
| Data Plan Elements |
| Description |
| Data description |
| A description of the information to be gathered; the nature and scale of the data that will be generated or collected. |
| Existing data |
| A survey of existing data relevant to the project and a discussion of whether and how these data will be integrated. |
| Format |
| Formats in which the data will be generated, maintained, and made available, including a justification for the procedural and archival appropriateness of those formats. |
| Metadata |
| A description of the metadata to be provided along with the generated data, and a discussion of the metadata standards used. |
| Storage and backup |
| Storage methods and backup procedures for the data, including the physical and cyber resources and facilities that will be used for the effective preservation and storage of the research data. |
| Security |
| A description of technical and procedural protections for information, including confidential information, and how permissions, restrictions, and embargoes will be enforced. |
| Responsibility |
| Names of the individuals responsible for data management in the research project. |
| Intellectual property rights |
| Entities or persons who will hold the intellectual property rights to the data, and how IP will be protected if necessary. Any copyright constraints (e.g., copyrighted data collection instruments) should be noted. |
| Access and sharing |
| A description of how data will be shared, including access procedures, embargo periods, technical mechanisms for |
dissemination and whether access will be open or granted only to specific user groups. A timeframe for data sharing and publishing should also be provided.
Audience The potential secondary users of the data.
Selection and retention periods
A description of how data will be selected for archiving, how long the data will be held, and plans for eventual transition or termination of the data collection in the future.
Archiving and preservation The procedures in place or envisioned for long-term archiving and preservation of the data, including succession plans for the data should the expected archiving entity go out of existence.
Ethics and privacy A discussion of how informed consent will be handled and how privacy will be protected, including any exceptional arrangements that might be needed to protect participant confidentiality, and other ethical issues that may arise.
Budget The costs of preparing data and documentation for archiving and how these costs will be paid.
Requests for funding may be included.
Data organization How the data will be managed during the project, with information about version control, naming conventions, etc.
Quality
Assurance Procedures for ensuring data quality during the project.
Legal requirements A listing of all relevant federal or funder requirements for data management and data sharing.