AZ FLAP SR88(1) Apache Trail

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF21B000027
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Roosevelt, Arizona, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a contractor to perform emergency repair work along approximately 11 miles of State Route 88 between Roosevelt Dam and Apache Lake Marina in Maricopa County, Arizona. The scope of work includes roadway excavation, installation of riprap, application of chip seal and asphalt pavement, replacement and upgrade of drainage culverts and low water crossings, erosion control, and revegetation. The solicitation was advertised in October 2021 with a bid opening planned for early December 2021 and anticipated contract award by late December 2021.

The project has no set-aside designations. The estimated cost range for the project is between $12 million and $16 million. Major work items include approximately 16,000 cubic yards of roadway excavation, 5,150 cubic yards of riprap, 111,000 square yards of chip seal, 38,000 tons of roadway aggregate, and 6,200 tons of asphalt concrete pavement. Construction work is scheduled to occur between winter 2022 and fall 2022 along 11.16 miles of State Route 88 in Maricopa County, Arizona. The Department of Transportation Federal Highway Administration seeks these emergency repair services.

Notice text

Project Location

The Apache Trail project consists of approximately 11.16 miles of AZ State Route 88 between Roosevelt Dam (MP 240) and Apache Lake Marina (MP 229) in Maricopa County, Arizona. State Route 88 is currently closed south of the project due to flood damage. Access for construction will be from the north. The figure below provides a visual summary of the project location.

Scope of the Work

The purpose of the project is to provide a hardened driving surface along the 11.16 miles while also improving sight distance with slope cuts in about 5 locations. The majority of the project will surfaced with a double chip seal on aggregate base, while some of the steeper sections will be asphalt paved. The project does not propose widening. Additionally, recent flood damage has required that several drainage features be improved. Numerous pipe culverts will be replaced and some will be upgraded to reinforced concrete box structures. The project involves a variety of emergency repair work including slope scaling, excavation, pipe culverts, reinforced concrete box culverts, ditch reconditioning, drainage repairs, riprap, chip seal, asphalt paving, erosion control, and revegetation. 

Items worth noting:

  • This is a very narrow and winding section of road with steep grades and no shoulder in several locations. Coordination with public traffic will be required. Daytime delays will be a maximum of 15 minutes.
  • Several drainage structures are currently completely plugged and the bench in portions of the project has been narrowed due to flood events in the Fall of 2019.
  • State Route 88 south of the Apache Lake Marina is currently closed. ADOT has not indicated a timeline for reopening this segment and it therefore the project should not be assumed to be accessible from the south.
  • One slope cut will likely require blasting techniques to excavate hard rock.
  • The road has historic characteristics that will require archeological monitors for certain work items. Additionally, environmental resources exist adjacent to the road in several locations.

Principal Work Items

Approximate quantities for major work items:

  • 16,000 cubic yards of roadway excavation
  • 5,150 cubic yards of rip rap
  • 111,000 square yards of chip seal
  • 38,000 tons of roadway aggregate
  • 6,200 tons of asphalt concrete pavement
  • 3,000 square yards of concrete pavement (low water crossings with cutoff walls)
  • 1,700 linear feet of pipe culvert
  • 465 linear feet of reinforced concrete box culvert

Anticipated Schedule

Advertise:  Late October

Bid Opening: Early December

Award:  Late December

Construction:  Winter 2022 – Fall 2022

Funding

The anticipated cost range is between $12,000,000 and $16,000,000.

Attachments

Show all 12

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
AZ FLAP SR88(1) Apache Trail Award Award Notice
AZ FLAP SR88(1) Apache Trail This notice · Latest solicitation Solicitation
AZ FLAP SR88(1) Apache Trail Pre-Solicitation
AZ FLAP SR88(1) Apache Trail Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity