11-17-21 Q and A SI and A Sheet Str 00031 Pine Creek Bridge SR88.pdf

PDF 50 KB Posted

Attached to
AZ FLAP SR88(1) Apache Trail
Solicitation number
6982AF21B000027
Issued by

About this file

This solicitation is for an Arizona Federal Lands Access Program project to repair and resurface approximately 11 miles of State Route 88 between Roosevelt Dam and Apache Lake Marina in Maricopa County, Arizona. The project scope includes roadway excavation, installation of drainage structures including pipe culverts and reinforced concrete box culverts, slope stabilization, chip sealing, asphalt paving, and concrete work. The estimated cost range is between $12 million and $16 million. The advertisement date is late October 2021, the bid opening is early December 2021, and award is anticipated in late December 2021. Construction would take place between winter 2022 and fall 2022. The soliciting agency is the Arizona Department of Transportation working with the Federal Highway Administration.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARIZONA DEPARTMENT OF TRANSPORTATION

Structure Inventory and Appraisal

BRIDGE GROUP

11/17/2021Date Printed :

Feature Under :Structure Name :Structure Number :

Agency: Location :Road Name :MP :Route :

A300 - GENERAL COMMENTS

SUFFICIENCY RATING

A206a,b,c-

Bridge Rail Type, Geometric Conform, and

Structural Conform:

BRIDGE RAILING

A219-Culv Fill Height (feet):

A218-Culv Length (feet):

A217-Culv Barrel Height(feet):

CULVERT INFORMATION

A234-Steel In-Depth Insp Freq(months):

N93C-Date Spec Insp:

N93B-Date Underwater Insp:

N93A-Date Fract Crit Insp:

N92C-Special Insp:

N92B-Underwater Insp:

N92A-Fracture Critical:

CRITICAL FEATURES

A228-Next Insp Date:

A207-Inspection Quarter:

N91-Insp Freq (months):

N90-Inspection Date:

INSPECTION

A225-Deck Area (sq. feet):

A223-TRACS Number:

A205-Orig Project Station:

A204-Orig Project Number:

N106-Year of Reconstruction:

N27-Year Built:

CONSTRUCTION PROJECT DATA

A233-Posted Vert Clr SB/WB (ft-in):

A233-Posted Vert Clr NB/EB (ft-in):

A222-Date of Load Rtg:

A211-Posted Limit (Tons):

N103-Temp Str Designation:

N70-Bridge Posting:

N66-Inventory Load Rtg/Factor:

N65-Method Used for Inv. Rtg:

N64-Operating Load Rtg/Factor:

N63-Method Used for Oper. Rtg:

N41-Open, Post, Close:

N31-Design Loading:

LOAD, RATE, and POST

A221-Scour Countermeasure:

A220-Found Embed (feet):

A202-Foundation Type:

N113-Scour Critical Rtg:

BRIDGE SCOUR DATA

N36-Traffic Safety Features:

N72-Appr Rdw Align:

N71-Waterway Adequacy:

N69-Underclearance Rtg:

N68-Deck Geometry:

N67-Struct Evaluation:

APPRAISAL RATINGS

N62-Culvert:

N61-Channel:

N60-Substructure:

N59-Superstructure:

N58-Deck:

CONDITION RATINGS

N97-Year of Cost Estimate:

N96-Total Project Cost (x1000):

N95-Rdwy Improv Cost (x1000):

N94-Br Improv Cost (x1000):

N76-Length of Str Imp (feet):

N75-Type of Work:

PROPOSED IMPROVEMENTS

N46-Number of Appr Spans:

N45-Number of Main Spans:

N44-Str Type, Appr:

N43-Str Type, Main:

N42-Service Type:

SERVICE, TYPE, and SPAN INFORMATION

N56-Min Lat Under Clr Lt (feet):

N55-Min Lat Under Clr Rt (feet):

N54-Min Vert Under Clr (feet):

N53-Min Vert Over Clr (feet):

VERTICAL & HORIZONTAL CLEARANCE

N112-NBIS Br Length?

N52-Deck Width Out-Out (feet):

N51-Br Width Curb-Curb (feet):

N50b-Rt Curb/Swlk Width (feet):

N50a-Lt Curb/Swlk Width (feet):

N49-Structure Length (feet):

N48-Max Span Length (feet):

N32:Appr Rdwy Width (feet):

DIMENSIONS

A201-Wear Surf Thickness (inches)

N108-Wear Surf Prot System:

N107-Deck Str Type:

N37-Historical Significance:

N35-Structure Flared:

N34-Skew:

N33-Bridge Median:

GENERAL DATA

N116-Nav Min Vert Clr (feet):

N111-Nav Pier/Abut Prot:

N40-Nav Horiz Clr (feet):

N39-Nav Vert clr (feet):

N38-Navigation Control:

NAVIGATION

A229-Agency:

N22-Bridge Owner:

N21-Maint Responsibility:

RESPONSIBILITY

A200-Is N5 the Princ. Rte?

N115-Year of Future ADT:

N114-Future ADT:

N110-National Truck Network:

N109-Percent Truck Traffic:

N104-Hwy System:

N102-Direction of Traffic:

N101-Parallel Bridge:

N100-Defense Hwy:

N47-Inv Rte Tot Horiz Clr (feet):

N30-Year of ADT:

N29-Avg Daily Traffic:

N99-Border Bridge Number:

N98-Border St Code - % Resp:

N17-Longitude :

N16-Latitude:

N4-Place Code :

N3-County Code :

N2-State Hwy District :

N1-State Code :

LOCATION INFORMATION

N26-Functional Class:

N11-Inv Rte Milepoint:

N10-Inv Rte Min Vert Clr (feet):

N28-Lanes:

N5-Inv Rte:

N20-Toll:

N19-Detour Length (miles):

INVENTORY ROUTE DATA

ROADWAY RECORD ON UNDER

Sufficiency Rating:

Inspection Type:

Southeast

Maricopa

Unknown

33 Deg 35 Min 54.08 Sec

111 Deg 12 Min 10.72 Sec

1 3 1 00088 0 -

1 0

99.99

233.50

16.0

N

Y

ADOT

0.00

0.00

N

8 0 0

0.5

0.5

16.0

18.5

Y

99.99

N 0.00

N 0.0

0.0

1 5

2 11

0 0

N

N

N

0 0 0 0

A

03/26/2015

0-0

0-0

31 1

$177

$155

$884

109+51.00

01/16/2020

Routine

January 2022

N

N

N

65.30

This is a historically significant structure and any repairs should be coordinated with the State

Historic Preservation Officer.

00031 Pine Creek Bridge Pine Creek

8.4 mi SW Jct SR 188ADOTSR 88 233.588

BRIDGE CONDITION

Bridge Condition: Fair

File details come from the government source that posted it. Updated .