Bid Opening Summary Apache.pdf
PDF 70 KB Posted
- Attached to
- AZ FLAP SR88(1) Apache Trail
- Solicitation number
- 6982AF21B000027
About this file
This bid opening summary details a construction project to resurface and repair drainage infrastructure along 11 miles of State Route 88 in Arizona between Roosevelt Dam and Apache Lake Marina. Stormwater Plans, doing business as SWP Glendale, submitted the lowest bid of $17,998,182, while the engineer's estimate for the project was $15,125,662.50. The related federal contract opportunity provides additional context that the purpose of the project is to improve the hardened driving surface and sight distance along the winding mountain road, which was damaged in 2019 floods and has sections with no shoulder. Major work items include roadway excavation, installation of riprap, chip sealing, asphalt paving, concrete work, culvert replacement and installation, and erosion control. The project is funded through the Federal Lands Access Program and has an anticipated cost range of $12-16 million. The solicitation was advertised in late October 2021 and bids were due in early December, with award planned for late December and construction to occur between winter 2022 and fall 2022.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Opening Summary
Project Name: Apache Trail Project Number: AZ FLAP SR88(1) Bid Opening Date: 12/1/2021 Time: 1:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Shei Walsh
Amendments: (1) 10/27/2021 (2) ___
Bidder’s Name Schedule A BID TOTAL
1. Stormwater Plans, dba SWP Glendale, AZ
17,998,182.00 $17,998,182.00
2.
3.
4.
5.
6.
Engineer’s Estimate
$15,125,662.50 $15,125,662.50