AZ FLAP SR88(1) Apache Trail

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF21B000027
Agency
Federal Highway Administration Department of Transportation
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Roosevelt, Arizona 85545, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks a contractor to complete roadway improvements along 11.16 miles of Arizona State Route 88 between Roosevelt Dam and Apache Lake Marina in Maricopa County. The Department of Transportation Federal Highway Administration will procure construction services including roadway excavation, drainage features, culverts, chip sealing, asphalt paving and revegetation. Proposals will be evaluated based on technical qualifications, past performance and price. The anticipated schedule includes advertising in early October, a bid opening in early November, award in mid-November and construction from winter 2021 through fall 2022.

There is no set-aside designation. Principal work includes approximately 16,000 cubic yards of excavation, 5,150 cubic yards of riprap, 111,000 square yards of chip sealing, 38,000 tons of aggregate and 3,000 square yards of concrete pavement. The anticipated cost range for the project is between $12-15 million.

Notice text

AZ FLAP SR88(1) Apache Trail

Project Location

The Apache Trail project consists of approximately 11.16 miles of AZ State Route 88 between Roosevelt Dam (MP 240) and Apache Lake Marina (MP 229) in Maricopa County, Arizona. State Route 88 is currently closed south of the project due to flood damage. Access for construction will be from the north. The figure below provides a visual summary of the project location.

Scope of the Work

The purpose of the project is to provide a hardened driving surface along the 11.16 miles while also improving sight distance with slope cuts in about 5 locations. The majority of the project will surfaced with a double chip seal on aggregate base, while some of the steeper sections will be asphalt paved. The project does not propose widening. Additionally, recent flood damage has required that several drainage features be improved. Numerous pipe culverts will be replaced and some will be upgraded to reinforced concrete box structures. The project involves a variety of emergency repair work including slope scaling, excavation, pipe culverts, reinforced concrete box culverts, ditch reconditioning, drainage repairs, riprap, chip seal, asphalt paving, erosion control, and revegetation. 

Items worth noting:

  • This is a very narrow and winding section of road with steep grades and no shoulder in several locations. Coordination with public traffic will be required. Daytime delays will be a maximum of 15 minutes.
  • Several drainage structures are currently completely plugged and the bench in portions of the project has been narrowed due to flood events in the Fall of 2019.
  • State Route 88 south of the Apache Lake Marina is currently closed. ADOT has not indicated a timeline for reopening this segment and it therefore the project should not be assumed to be accessible from the south.
  • One slope cut will likely require blasting techniques to excavate hard rock.
  • The road has historic characteristics that will require archeological monitors for certain work items. Additionally, environmental resources exist adjacent to the road in several locations.

Principal Work Items

Approximate quantities for major work items:

  • 16,000 cubic yards of roadway excavation
  • 5,150 cubic yards of rip rap
  • 111,000 square yards of chip seal
  • 38,000 tons of roadway aggregate
  • 6,200 tons of asphalt concrete pavement
  • 3,000 square yards of concrete pavement (low water crossings with cutoff walls)
  • 1,700 linear feet of pipe culvert
  • 465 linear feet of reinforced concrete box culvert

Anticipated Schedule

Advertise:  Early October

Bid Opening: Early November

Award:  Mid November

Construction:  Winter 2021 – Fall 2022

Funding

The anticipated cost range is between $12,000,000 and $15,000,000.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
AZ FLAP SR88(1) Apache Trail Award Award Notice
AZ FLAP SR88(1) Apache Trail Latest solicitation Solicitation
AZ FLAP SR88(1) Apache Trail This notice Pre-Solicitation
AZ FLAP SR88(1) Apache Trail Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity