About this opportunity

This solicitation seeks construction services for the AZ FLAP 202(2) Red Cloud Mine Road project located in Yuma County, Arizona. The Federal Highway Administration within the Department of Transportation is procuring the construction of approximately one mile of new paved roadway providing access to the Imperial National Wildlife Refuge. Key requirements include excavation, embankment, asphalt paving, aggregate base, riprap, and installation of approximately 1,000 linear feet of metal pipe culverts. The evaluation criteria will be lowest price technically acceptable. The deadline for questions was June 3, 2021 and bids are due by June 8, 2021.

This project is designated as a total small business set-aside. The NAICS code is 237110 and PSC code is D304. The engineer's estimate is $2,144,000. Arrow Indian Contractors, Inc. provided the lowest bid of $2,002,315.48. Key details include 3,000 tons of asphalt pavement, 6,700 tons of aggregate base, 18,000 cubic yards of excavation, 1,700 cubic yards of riprap, and construction from August 2021 to January 2022 in Yuma, Arizona. The estimated value ranges from $1,500,000 to $2,500,000.

Notice text

THIS PROJECT IS ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE.

THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE.

PROJECT NUMBER: AZ FLAP 202(2)

PROJECT NAME: Red Cloud Mine Road

PROJECT DESCRIPTION: This project consists of the construction of approximately 1 mile of a new paved alignment leading to Imperial National Wildlife Refuge within Yuma County, Arizona. Work generally includes excavation, embankment, paving, and culverts.

SIGNIFICANT QUANTITIES:

3,000 tons of asphalt concrete pavement, gyratory mix,

6,700 tons of aggregate base, 

18,000 cubic yards of roadway excavation,

1,700 cubic yards of riprap, and

1,000 linear feet of metal pipe culverts.

MISCELLANEOUS:  Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to refuge visitors throughout construction and achieve customer satisfaction. 

COST RANGE: The proposed project is estimated at a cost between $1,500,000 and $2,500,000.

CONSTRUCTION DURATION: Construction is anticipated from August, 2021 to January, 2022.

Files

File Type Posted
Bid Tabulation AZ FLAP 202(2) Red Cloud Mine Road.pdf PDF
Bid Opening Summary AZ FLAP 202(2) Red Cloud MIne Road.pdf PDF
A002.pdf PDF
QnA 6.3.21.pdf PDF
QnA 5.20.21.pdf PDF
QnA 5.13.21.pdf PDF
A001 Red Cloud Mine Road.pdf PDF
QnA 5.6.21.pdf PDF
QnA 4.27.21.pdf PDF
AZ FLAP 202(1)_Final Hydraulics Memo.pdf PDF
FP-14.pdf PDF
6982AF21B000007.pdf PDF
AZ FLAP 202(2)_Red Cloud Mine Road_IFB Sealed Plans.pdf PDF
AZ FLAP 202(1)_Geotech and Pavements Report.pdf PDF
Show all 14

Notice history

Notice Type Posted
AZ FLAP 202(2) Red Cloud Mine Road Award Award Notice
This notice Latest solicitation Solicitation
AZ FLAP 202(2) Red Cloud Mine Road Pre-Solicitation
AZ FLAP 202(2) Red Cloud Mine Road Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
AZ BL COLO 7528(1) Burro Creek Road Kingman, Arizona 86401, United States · NAICS 237310 Federal Highway Administration Total Small Business
UT NP ARCH 100(2) Bridges on Delicate Arch Road Moab, Utah 84532, United States · NAICS 237310 Federal Highway Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors