QnA 5.6.21.pdf

PDF 138 KB Posted

Attached to
AZ FLAP 202(2) Red Cloud Mine Road Federal contract opportunity
Solicitation number
6982AF21B000007
Issued by
Department of Transportation Federal Highway Administration

About this file

This document provides details for a federal contract opportunity to construct approximately one mile of a new paved road leading to the Imperial National Wildlife Refuge in Yuma County, Arizona. The project is advertised as a total small business set-aside. Work includes excavation, embankment, paving, and installation of around 1,000 linear feet of metal pipe culverts. Significant quantities are 3,000 tons of asphalt concrete pavement, 6,700 tons of aggregate base, and 18,000 cubic yards of roadway excavation. The proposed cost range is between $1.5 million to $2.5 million. Construction is anticipated from August 2021 to January 2022 and must be completed in a manner to minimize disruptions to refuge visitors. The solicitation was issued by the Department of Transportation Federal Highway Administration.

View the file

Other files for this federal contract opportunity

Other files attached to AZ FLAP 202(2) Red Cloud Mine Road, newest first.
File Type Posted
Bid Tabulation AZ FLAP 202(2) Red Cloud Mine Road.pdf PDF
Bid Opening Summary AZ FLAP 202(2) Red Cloud MIne Road.pdf PDF
A002.pdf PDF
QnA 6.3.21.pdf PDF
QnA 5.20.21.pdf PDF
QnA 5.13.21.pdf PDF
A001 Red Cloud Mine Road.pdf PDF
QnA 4.27.21.pdf PDF
FP-14.pdf PDF
AZ FLAP 202(1)_Final Hydraulics Memo.pdf PDF
6982AF21B000007.pdf PDF
AZ FLAP 202(2)_Red Cloud Mine Road_IFB Sealed Plans.pdf PDF
AZ FLAP 202(1)_Geotech and Pavements Report.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for AZ FLAP 202(2) Red Cloud Mine Road

May 6, 2021

Questions Answers 1 What are the necessary licenses & permits associated with procuring this opportunity?

• You must be registered in SAM.gov (see sheet A-ii of the Invitation for

Bid (IFB)).

• All required permits are covered in Section 107 of the FP-14 and SCR’s.

See Sheet E-10 thru E-18. Permits are also attached in the Appendices of the IFB (see the Table of Contents of the IFB).

2 Can the CAD file and survey control points be provided now to compare a quantity take-off to the Bid Schedule?

• CAD files and survey control points will only be provided upon award to the selected contractor.