QnA 5.6.21.pdf
PDF 138 KB Posted
- Attached to
- AZ FLAP 202(2) Red Cloud Mine Road Federal contract opportunity
- Solicitation number
- 6982AF21B000007
About this file
This document provides details for a federal contract opportunity to construct approximately one mile of a new paved road leading to the Imperial National Wildlife Refuge in Yuma County, Arizona. The project is advertised as a total small business set-aside. Work includes excavation, embankment, paving, and installation of around 1,000 linear feet of metal pipe culverts. Significant quantities are 3,000 tons of asphalt concrete pavement, 6,700 tons of aggregate base, and 18,000 cubic yards of roadway excavation. The proposed cost range is between $1.5 million to $2.5 million. Construction is anticipated from August 2021 to January 2022 and must be completed in a manner to minimize disruptions to refuge visitors. The solicitation was issued by the Department of Transportation Federal Highway Administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Tabulation AZ FLAP 202(2) Red Cloud Mine Road.pdf | ||
| Bid Opening Summary AZ FLAP 202(2) Red Cloud MIne Road.pdf | ||
| A002.pdf | ||
| QnA 6.3.21.pdf | ||
| QnA 5.20.21.pdf | ||
| QnA 5.13.21.pdf | ||
| A001 Red Cloud Mine Road.pdf | ||
| QnA 4.27.21.pdf | ||
| FP-14.pdf | ||
| AZ FLAP 202(1)_Final Hydraulics Memo.pdf | ||
| 6982AF21B000007.pdf | ||
| AZ FLAP 202(2)_Red Cloud Mine Road_IFB Sealed Plans.pdf | ||
| AZ FLAP 202(1)_Geotech and Pavements Report.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for AZ FLAP 202(2) Red Cloud Mine Road
May 6, 2021
Questions Answers 1 What are the necessary licenses & permits associated with procuring this opportunity?
• You must be registered in SAM.gov (see sheet A-ii of the Invitation for
Bid (IFB)).
• All required permits are covered in Section 107 of the FP-14 and SCR’s.
See Sheet E-10 thru E-18. Permits are also attached in the Appendices of the IFB (see the Table of Contents of the IFB).
2 Can the CAD file and survey control points be provided now to compare a quantity take-off to the Bid Schedule?
• CAD files and survey control points will only be provided upon award to the selected contractor.