QnA 5.13.21.pdf
PDF 141 KB Posted
- Attached to
- AZ FLAP 202(2) Red Cloud Mine Road Federal contract opportunity
- Solicitation number
- 6982AF21B000007
About this file
This document contains questions and answers from a pre-solicitation conference call for a federal contract opportunity to construct approximately one mile of new paved roadway in Yuma County, Arizona. The key project details include: the solicitation number 6982AF21B000007; a description of the Red Cloud Mine Road project involving excavation, embankment, paving, and culverts; significant construction quantities of asphalt, aggregate base, excavation, riprap and culverts; a cost estimate between $1.5-2.5 million; and an anticipated construction duration from August 2021 to January 2022. Permits and licensing requirements are defined in the Invitation for Bid. CAD files and survey control will only be provided to the selected contractor upon award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Tabulation AZ FLAP 202(2) Red Cloud Mine Road.pdf | ||
| Bid Opening Summary AZ FLAP 202(2) Red Cloud MIne Road.pdf | ||
| A002.pdf | ||
| QnA 6.3.21.pdf | ||
| QnA 5.20.21.pdf | ||
| A001 Red Cloud Mine Road.pdf | ||
| QnA 5.6.21.pdf | ||
| QnA 4.27.21.pdf | ||
| 6982AF21B000007.pdf | ||
| AZ FLAP 202(2)_Red Cloud Mine Road_IFB Sealed Plans.pdf | ||
| AZ FLAP 202(1)_Geotech and Pavements Report.pdf | ||
| FP-14.pdf | ||
| AZ FLAP 202(1)_Final Hydraulics Memo.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for AZ FLAP 202(2) Red Cloud Mine Road
May 13, 2021
Questions Answers 1 What are the necessary licenses & permits associated with procuring this opportunity?
• You must be registered in SAM.gov (see sheet A-ii of the Invitation for
Bid (IFB)).
• All required permits are covered in Section 107 of the FP-14 and SCR’s.
See Sheet E-10 thru E-18. Permits are also attached in the Appendices of the IFB (see the Table of Contents of the IFB).
2 Can the CAD file and survey control points be provided now to compare a quantity take-off to the Bid Schedule?
• CAD files and survey control points will only be provided upon award to the selected contractor.
3 What is the estimated project duration? • The completion date is stated in SCR’s Subsection 108.01 on page E-20 of the IFB.
• The anticipated Notice to Proceed date is stated in clause 52.211-10 on page C-3 of the IFB.