Analysis of Mobility Platform (AMP)
Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- HTC71124RD002
- Agency
-
United States Transportation Command
Department of Defense
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541511 Custom Computer Programming Services
- Place of performance
- Scott AFB, Illinois, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Transportation Command Joint Distribution Process Analysis Center will solicit proposals for a single-award Indefinite Delivery Indefinite Quantity contract to provide program management, engineering, and cloud migration support for the Analysis of Mobility Platform suite of transportation modeling and simulation tools. Services will be performed across 12 task areas and evaluated based on best value source selection procedures, with the solicitation to be released on March 1, 2024. The contract will have a five-year ordering period from August 2024 through July 2029, with the potential for a six-month extension and task orders including a one-year base period and four one-year options.
The pre-solicitation notice does not designate any set-asides. The requirement will be solicited under NAICS code 541511 for computer systems design services with an anticipated maximum contract value of $150 million. Services will involve modeling and simulation of deployment, distribution, and transportation operations to support analysis of the joint deployment distribution enterprise.
Notice text
4 versions
Update #4 · Latest ·
Final RFP/Solicitation will be posted on Friday, 23 Feb 2024 to the PIEE/Solicitation Module. There will be a few provision/clause revisions in the Final RFP. The overall content within the Draft RFP has not been revised. Questions are due no later than 0900 (CT) on 08 March 2024 and submitted on the RFP Attachment 14. Proposal due date has changed to 1100 (CT) on 25 March 2024.
This presolicitation notice serves as notification to industry of the draft solicitation for the Analysis of Mobility Platform procurement, hereafter referred to as AMP.
AMP is a suite of tools supporting analysis of the joint deployment distribution enterprise (JDDE). Tools range from complex simulation and optimization modeling environments to highly detailed simulation tools. The United States Transportation Command (USTRANSCOM) Joint Distribution Process Analysis Center (JDPAC) is the functional manager for the AMP program, and the tools within the suite include:
-
-
- AMP-Core
- Air Refueling Model (ARM)
- AMP-Port Analysis Tool (AMP-PAT)
- Rapid Course of Action (COA) Analysis Tool (RCAT)
- Joint Mobility Closure Estimator (JMCE)
- AMP-Transportation Feasibility Assessment (AMP-TFA)
-
AMP is a transportation modeling and simulation framework used to obtain an end-to-end simulation of the Defense Transportation System (DTS). AMP supports transportation enabler requirements during Time-Phased Force and Deployment Data development processes and provides throughput analysis for airports and seaports. This requirement will have 12 task areas: Contract and Program Management, Technical Support for Studies and Analysis, Requirements Management, Support for Design and Development, Software Maintenance, Application Administration, Security Engineering and Cyber Security Requirements, Support for Annual AMP Contingency Plan Review, Configuration Management, Sustainment Enhancement, New Capability, and Cloud Migration.
The United States Transportation Command Directorate of Acquisition (TCAQ) intends to solicit and award a single award Indefinite Delivery Indefinite Quantity (IDIQ) contract, with cost plus fixed fee and firm fixed price line items. Task Orders issued against the IDIQ will be structured accordingly. The five- year ordering period for the AMP IDIQ is 01 August 2024 through 31 July 2029. Task Order 01 may include Transition from 01 August 2024 – 30 September 2024; however, no other performance will begin prior to 01 October 2024. Both the IDIQ and the task orders will include FAR 52.217-8, Option to Extend Services, which permits extension of the IDIQ and task order for an additional six-months (01 October 2029 – 31 March 2030). Task Orders will also include FAR 52.217-9, Option to Extend the Term of the Contract. The first task order will be a base period of one-year, plus four one-year option periods.
The Government will utilize the DoD Source Selection procedures to award to the offeror determined to represent the best value to the Government. This requirement will be solicited as full and open utilizing 541511. The anticipated date for release of the solicitation is on or around March 1, 2024. If your company is interested in the AMP requirement, it is advised to continuously monitor the Contract Opportunities site at www.sam.gov. Offerors may request the technical data package prior to the solicitation release. All responsible sources may submit a proposal which shall be considered by the agency.
Update #3 ·
Final RFP/Solicitation will be posted on Friday, 23 Feb 2024 to PIEE/Solicitation Module. There will be a few provision/clause revisions in the Final RFP. The overall content within the Draft RFP has not be revised. The
This presolicitation notice serves as notification to industry of the draft solicitation for the Analysis of Mobility Platform procurement, hereafter referred to as AMP.
AMP is a suite of tools supporting analysis of the joint deployment distribution enterprise (JDDE). Tools range from complex simulation and optimization modeling environments to highly detailed simulation tools. The United States Transportation Command (USTRANSCOM) Joint Distribution Process Analysis Center (JDPAC) is the functional manager for the AMP program, and the tools within the suite include:
-
-
- AMP-Core
- Air Refueling Model (ARM)
- AMP-Port Analysis Tool (AMP-PAT)
- Rapid Course of Action (COA) Analysis Tool (RCAT)
- Joint Mobility Closure Estimator (JMCE)
- AMP-Transportation Feasibility Assessment (AMP-TFA)
-
AMP is a transportation modeling and simulation framework used to obtain an end-to-end simulation of the Defense Transportation System (DTS). AMP supports transportation enabler requirements during Time-Phased Force and Deployment Data development processes and provides throughput analysis for airports and seaports. This requirement will have 12 task areas: Contract and Program Management, Technical Support for Studies and Analysis, Requirements Management, Support for Design and Development, Software Maintenance, Application Administration, Security Engineering and Cyber Security Requirements, Support for Annual AMP Contingency Plan Review, Configuration Management, Sustainment Enhancement, New Capability, and Cloud Migration.
The United States Transportation Command Directorate of Acquisition (TCAQ) intends to solicit and award a single award Indefinite Delivery Indefinite Quantity (IDIQ) contract, with cost plus fixed fee and firm fixed price line items. Task Orders issued against the IDIQ will be structured accordingly. The five- year ordering period for the AMP IDIQ is 01 August 2024 through 31 July 2029. Task Order 01 may include Transition from 01 August 2024 – 30 September 2024; however, no other performance will begin prior to 01 October 2024. Both the IDIQ and the task orders will include FAR 52.217-8, Option to Extend Services, which permits extension of the IDIQ and task order for an additional six-months (01 October 2029 – 31 March 2030). Task Orders will also include FAR 52.217-9, Option to Extend the Term of the Contract. The first task order will be a base period of one-year, plus four one-year option periods.
The Government will utilize the DoD Source Selection procedures to award to the offeror determined to represent the best value to the Government. This requirement will be solicited as full and open utilizing 541511. The anticipated date for release of the solicitation is on or around March 1, 2024. If your company is interested in the AMP requirement, it is advised to continuously monitor the Contract Opportunities site at www.sam.gov. Offerors may request the technical data package prior to the solicitation release. All responsible sources may submit a proposal which shall be considered by the agency.
Update #2 ·
This presolicitation notice serves as notification to industry of the draft solicitation for the Analysis of Mobility Platform procurement, hereafter referred to as AMP.
AMP is a suite of tools supporting analysis of the joint deployment distribution enterprise (JDDE). Tools range from complex simulation and optimization modeling environments to highly detailed simulation tools. The United States Transportation Command (USTRANSCOM) Joint Distribution Process Analysis Center (JDPAC) is the functional manager for the AMP program, and the tools within the suite include:
-
-
- AMP-Core
- Air Refueling Model (ARM)
- AMP-Port Analysis Tool (AMP-PAT)
- Rapid Course of Action (COA) Analysis Tool (RCAT)
- Joint Mobility Closure Estimator (JMCE)
- AMP-Transportation Feasibility Assessment (AMP-TFA)
-
AMP is a transportation modeling and simulation framework used to obtain an end-to-end simulation of the Defense Transportation System (DTS). AMP supports transportation enabler requirements during Time-Phased Force and Deployment Data development processes and provides throughput analysis for airports and seaports. This requirement will have 12 task areas: Contract and Program Management, Technical Support for Studies and Analysis, Requirements Management, Support for Design and Development, Software Maintenance, Application Administration, Security Engineering and Cyber Security Requirements, Support for Annual AMP Contingency Plan Review, Configuration Management, Sustainment Enhancement, New Capability, and Cloud Migration.
The United States Transportation Command Directorate of Acquisition (TCAQ) intends to solicit and award a single award Indefinite Delivery Indefinite Quantity (IDIQ) contract, with cost plus fixed fee and firm fixed price line items. Task Orders issued against the IDIQ will be structured accordingly. The five- year ordering period for the AMP IDIQ is 01 August 2024 through 31 July 2029. Task Order 01 may include Transition from 01 August 2024 – 30 September 2024; however, no other performance will begin prior to 01 October 2024. Both the IDIQ and the task orders will include FAR 52.217-8, Option to Extend Services, which permits extension of the IDIQ and task order for an additional six-months (01 October 2029 – 31 March 2030). Task Orders will also include FAR 52.217-9, Option to Extend the Term of the Contract. The first task order will be a base period of one-year, plus four one-year option periods.
The Government will utilize the DoD Source Selection procedures to award to the offeror determined to represent the best value to the Government. This requirement will be solicited as full and open utilizing 541511. The anticipated date for release of the solicitation is on or around March 1, 2024. If your company is interested in the AMP requirement, it is advised to continuously monitor the Contract Opportunities site at www.sam.gov. Offerors may request the technical data package prior to the solicitation release. All responsible sources may submit a proposal which shall be considered by the agency.
Update #1 ·
This presolicitation notice serves as notification to industry of the upcoming solicitation for the Analysis of Mobility Platform procurement, hereafter referred to as AMP.
AMP is a suite of tools supporting analysis of the joint deployment distribution enterprise (JDDE). Tools range from complex simulation and optimization modeling environments to highly detailed simulation tools. The United States Transportation Command (USTRANSCOM) Joint Distribution Process Analysis Center (JDPAC) is the functional manager for the AMP program, and the tools within the suite include:
-
-
- AMP-Core
- Air Refueling Model (ARM)
- AMP-Port Analysis Tool (AMP-PAT)
- Rapid Course of Action (COA) Analysis Tool (RCAT)
- Joint Mobility Closure Estimator (JMCE)
- AMP-Transportation Feasibility Assessment (AMP-TFA)
-
AMP is a transportation modeling and simulation framework used to obtain an end-to-end simulation of the Defense Transportation System (DTS). AMP supports transportation enabler requirements during Time-Phased Force and Deployment Data development processes and provides throughput analysis for airports and seaports. This requirement will have 12 task areas: Contract and Program Management, Technical Support for Studies and Analysis, Requirements Management, Support for Design and Development, Software Maintenance, Application Administration, Security Engineering and Cyber Security Requirements, Support for Annual AMP Contingency Plan Review, Configuration Management, Sustainment Enhancement, New Capability, and Cloud Migration.
The United States Transportation Command Directorate of Acquisition (TCAQ) intends to solicit and award a single award Indefinite Delivery Indefinite Quantity (IDIQ) contract, with cost plus fixed fee and firm fixed price line items. Task Orders issued against the IDIQ will be structured accordingly. The five- year ordering period for the AMP IDIQ is 01 August 2024 through 31 July 2029. Task Order 01 may include Transition from 01 August 2024 – 30 September 2024; however, no other performance will begin prior to 01 October 2024. Both the IDIQ and the task orders will include FAR 52.217-8, Option to Extend Services, which permits extension of the IDIQ and task order for an additional six-months (01 October 2029 – 31 March 2030). Task Orders will also include FAR 52.217-9, Option to Extend the Term of the Contract. The first task order will be a base period of one-year, plus four one-year option periods.
The Government will utilize the DoD Source Selection procedures to award to the offeror determined to represent the best value to the Government. This requirement will be solicited as full and open utilizing 541511. The anticipated date for release of the solicitation is on or around March 1, 2024. If your company is interested in the AMP requirement, it is advised to continuously monitor the Contract Opportunities site at www.sam.gov. All responsible sources may submit a proposal which shall be considered by the agency.
Files
| File | Type | Posted |
|---|---|---|
| Atch 10 Staffing Matrix TO 1.xlsx | XLSX spreadsheet | |
| Atch 11 TO1 Cost Price Template.xlsx | XLSX spreadsheet | |
| Atch 7 PP Ref Sheet.docx | DOCX document | |
| Atch 1 20240212 AMP IDIQ PWS v1 FINAL.pdf | ||
| Atch 3 2024.01.17 AMP TO 01 QASP.pdf | ||
| Atch 5 TDP-File_Name_List.pdf | ||
| Atch 12 AMP SB_SubconPlan_Template.doc | DOC document | |
| Atch 8 PP Log.docx | DOCX document | |
| Atch 14 QA Template.xlsx | XLSX spreadsheet | |
| Atch 4 DD254 and Addendum.pdf | ||
| Atch 2 20240212 AMP_PWS_TO01 - v1 FINAL.pdf | ||
| Draft HTC71124RD002.pdf | ||
| Atch 13 AMP GFE 20240207.pdf | ||
| Atch 9 PP Questionnaire.doc | DOC document | |
| Atch 6 NDA TDP.docx | DOCX document |
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| Analysis of Mobility Platform (AMP) Request for Proposal (RFP) HTC71124RD002 | Solicitation | |
| This notice | Pre-Solicitation | |
| Analysis of Mobility Platform RFI | Pre-Solicitation | |
| Analysis of Mobility Platform (AMP) | Special Notice |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USTRANSCOM Commercial Solutions Opening (CSO) | United States Transportation Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity