Atch 5 TDP-File_Name_List.pdf

PDF 84 KB Posted

Attached to
Analysis of Mobility Platform (AMP)
Solicitation number
HTC71124RD002
Issued by

About this file

This document provides details for an upcoming solicitation for the Analysis of Mobility Platform (AMP) program. The United States Transportation Command (USTRANSCOM) requires tools and services supporting analysis of the joint deployment distribution enterprise through the AMP program, including AMP-Core, the Air Refueling Model, AMP-Port Analysis Tool, Rapid Course of Action Analysis Tool, Joint Mobility Closure Estimator, and AMP-Transportation Feasibility Assessment.

The solicitation will be for a single-award Indefinite Delivery Indefinite Quantity contract with a base period of one year plus four one-year options. Task areas include program management, technical support, requirements management, design and development support, software maintenance, application administration, security engineering, contingency planning review, configuration management, sustainment enhancement, new capabilities, and cloud migration. The contract has a five-year ordering period from August 2024 through July 2029. The United States Transportation Command Directorate of Acquisition intends to solicit the requirement using North American Industry Classification System code 541511 and anticipates releasing the solicitation on or around March 1, 2024.

View the file

Other files

File Type Posted
Atch 10 Staffing Matrix TO 1.xlsx XLSX spreadsheet
Atch 11 TO1 Cost Price Template.xlsx XLSX spreadsheet
Atch 7 PP Ref Sheet.docx DOCX document
Atch 1 20240212 AMP IDIQ PWS v1 FINAL.pdf PDF
Atch 3 2024.01.17 AMP TO 01 QASP.pdf PDF
Atch 12 AMP SB_SubconPlan_Template.doc DOC document
Atch 8 PP Log.docx DOCX document
Atch 14 QA Template.xlsx XLSX spreadsheet
Atch 4 DD254 and Addendum.pdf PDF
Atch 2 20240212 AMP_PWS_TO01 - v1 FINAL.pdf PDF
Draft HTC71124RD002.pdf PDF
Atch 13 AMP GFE 20240207.pdf PDF
Atch 9 PP Questionnaire.doc DOC document
Atch 6 NDA TDP.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP File Name Original File Name Document Title Comment

1 AmpUserGuide-redacted.pdf AmpUserGuide.pdf

AMP Quickstart and Reference, AMP Version 14.21.4, Revised:

09 AUG 23 (commonly referred to as the AMP Software User’s Manual)

Redacted ITAR and Personnel Names

2 14.21 Enhance Model Usability-Model Performance RDD-90--redacted.pdf 14.21 Enhance Model Usability-Model Performance RDD-90.pdf Enhance Model Usability and Performance Requirement Design Description (RDD) for CRs September 30, 2021

Redacted ITAR and Personnel Names

3 Costing Enhancements RDD_90% no comments-JDPACcomments--redacted.pdf Costing Enhancements RDD_90% no comments-JDPACcomments.pdf Costing Enhancements Requirement Design Description (RDD) September 29, 2022

Redacted ITAR and Personnel Names

4 Editor_Enhancements_RDD-28SEP22--redacted.pdf Editor_Enhancements_RDD-28SEP22.pdf Editor Enhancements Requirement Design Description (RDD) September 28, 2022

Redacted ITAR and Personnel Names

RFP File Name Original File Name Document Title Comment

1 AMP-PAT Help ARAT-redacted.pdf AMP-PAT Help ARAT.pdf Airport Rapid Analysis Tool (ARAT) User’s Manual, VERSION 14.21, 28 Mar 2023

Redacted ITAR and Personnel Names

2 AMP-PAT Help AST-redacted.pdf AMP-PAT Help AST.pdf Airport Simulation Tool (AST) User’s Manual, VERSION 14.21, 28 Mar 2023

Redacted ITAR and Personnel Names

3 AMP-PAT Help ATT-redacted.pdf AMP-PAT Help ATT.pdf Airport Throughput Tool (ATT) User’s Manual, VERSION 14.21, 28 Mar 2023

Redacted ITAR and Personnel Names

4 AMP-PAT Help General-redacted.pdf AMP-PAT Help General.pdf User Manual – General, VERSION 14.21, 28 Mar 2023 Redacted ITAR and Personnel Names

5 AMP-PAT Help IST-redacted.pdf AMP-PAT Help IST.pdf Installation Simulation Tool (IST) User’s Manual, VERSION 14.21, 28 Mar 2023

Redacted ITAR and Personnel Names

6 AMP-PAT Help SST-redacted.pdf AMP-PAT Help SST.pdf Seaport User’s Manual, VERSION 14.21, 28 Mar 2023 Redacted ITAR and Personnel Names

7 AMP-PAT Help STT-redacted.pdf AMP-PAT Help STT.pdf Seaport Throughput Tool (STT) User’s Manual, VERSION 14.21, 28 Mar 2023

Redacted ITAR and Personnel Names

RFP File Name Original File Name Document Title Comment

1 ARM ARDE User Manual 14.21.4-redacted.pdf ARM ARDE User Manual 14.21.4.pdf ARM - Air Refueling Demand Estimator (ARDE) User Manual, Version 14.21.4

Redacted ITAR and Personnel Names

2 ARM Installer User Manual 14.21.4-redacted.pdf ARM Installer User Manual 14.21.4.pdf Installer User Manual, Version 14.21.4 Redacted ITAR and Personnel Names

3 ARM ITS User Manual 14.21.4-redacted.pdf ARM ITS User Manual 14.21.4.pdf Integrated Tanker Scheduler (ITS) User Manual, Version 14.21.4

Redacted ITAR and Personnel Names

4 ARM Quick Start Guide 14.21.4-redacted.pdf ARM Quick Start Guide 14.21.4.pdf Quick-Start Guide, Version 14.21.4 Redacted ITAR and Personnel Names

5 ARM Release Notes 14.21.4-redacted.pdf ARM Release Notes 14.21.4.pdf Release Notes, Version 14.21.4 Redacted ITAR and Personnel Names

6 ARM Simulation User Manual 14.21.4-redacted.pdf ARM Simulation User Manual 14.21.4.pdf Simulation User Manual, Version 14.21.4 Redacted ITAR and Personnel Names

7 ARM Suite Overview 14.21.4-redacted.pdf ARM Suite Overview 14.21.4.pdf Suite Overview, Version 14.21.4 Redacted ITAR and Personnel Names

8 ARM Tools User Manual 14.21.4-redacted.pdf ARM Tools User Manual 14.21.4.pdf Tools User Manual, Version 14.21.4 Redacted ITAR and Personnel Names

9 ARMLicensingInfo-redacted.pdf ARMLicensingInfo.pdf ARM Libraries / Licensing Info Redacted ITAR and Personnel Names

Joint Mobility Closure Estimator (JMCE) RFP File Name Original File Name Document Title Comment

ANALYSIS OF MOBILITY PLATFORM (AMP)

HTC71124RD002

RFP Attachment 5 - Technical Data Package - File Name List Analysis of Mobility Platform (AMP-Core)

Analysis of Mobility Platform- Port Analysis Tools (AMP-PAT)

Air Refueling Model (ARM)

1 JMCE Help-redacted.pdf JMCE Help.pdf JMCE User’s Manual, VERSION 14.18, 24 Jan 2020 Redacted ITAR and Personnel Names

RFP File Name Original File Name Document Title Comment

1 RCAT 14.21.4 Software Users Manual Super-User Addendum final-redacted.pdf RCAT 14.21.4 Software Users Manual Super-User Addendum final.pdf Software User’s Manual – Super User Addendum, VERSION

14.21.4, 09 AUG 2023

Redacted ITAR and Personnel Names

2 RCAT 14.20.0 Application Administration Manual 20220317-redacted.pdf RCAT 14.20.0 Application Administration Manual 20220317.pdf Software Application Administration Manual, VERSION 14.20.0, 17 March 2022

Redacted ITAR and Personnel Names

RFP File Name Original File Name Document Title Comment

1 TFA.Training.AdvancedQuery.June23.pdf TFA.Training.AdvancedQuery.June23.pdf Training – Advanced Query, June23

No Redaction Needed.

No ITAR markings. No names of personnel.

2 TFA.Training.AirTravelTimeTool.June23.pdf TFA.Training.AirTravelTimeTool.June23.pdf Training – Air Travel Time Tool, June23

No Redaction Needed.

No ITAR markings. No names of personnel.

3 TFA.Training.CopySetup.May23.pdf TFA.Training.CopySetup.May23.pdf Training – Copy Setup, May 23

No Redaction Needed.

No ITAR markings. No names of personnel.

4 TFA.Training.DailyBrief.May23.pdf TFA.Training.DailyBrief.May23.pdf Training – Daily Brief, May 23

No Redaction Needed.

No ITAR markings. No names of personnel.

5 TFA.Training.ExclusionZones.June23.pdf TFA.Training.ExclusionZones.June23.pdf Training – Exclusion Zones, June 23

No Redaction Needed.

No ITAR markings. No names of personnel.

6 TFA.Training.ForceModuleScheduling.May23.pdf TFA.Training.ForceModuleScheduling.May23.pdf Training – Force Module Scheduling, May 23

No Redaction Needed.

No ITAR markings. No names of personnel.

7 TFA.Training.LateAndStrandedCargo.May23.pdf TFA.Training.LateAndStrandedCargo.May23.pdf Training – Late and Stranded Cargo, May 23

No Redaction Needed.

No ITAR markings. No names of personnel.

8 TFA.Training.LOI.Jun23.pdf TFA.Training.LOI.Jun23.pdf Training – Letters of Instruction, June 23

No Redaction Needed.

No ITAR markings. No names of personnel.

9 TFA.Training.RequirementGroupEdit.June23.pdf TFA.Training.RequirementGroupEdit.June23.pdf Training – Requirements Group Editor, June 23

No Redaction Needed.

No ITAR markings. No names of personnel.

10 TFA.Training.SealiftLiner.June23.pdf TFA.Training.SealiftLiner.June23.pdf Training – Sealift Liner, June 23

No Redaction Needed.

No ITAR markings. No names of personnel.

11 TFA.Training.StaticSustainment.June23.pdf TFA.Training.StaticSustainment.June23.pdf Training – Static Sustainment, June 23

No Redaction Needed.

No ITAR markings. No names of personnel.

12 TFA.Training.SyncChart.June23.pdf TFA.Training.SyncChart.June23.pdf Training - Sync Chart, June 23

No Redaction Needed.

No ITAR markings. No names of personnel.

13 TFA.Training.TPFDDEditing.2Feb23.pdf TFA.Training.TPFDDEditing.2Feb23.pdf Training - TPFDD Editing, February 23

No Redaction Needed.

No ITAR markings. No names of personnel.

14 TFA.Training.Transshipment.June23.pdf TFA.Training.Transshipment.June23.pdf Training – Transshipment, June 23

No Redaction Needed.

No ITAR markings. No names of personnel.

AMP Transportation Feasibility Assessment (AMP-TFA)

Rapid Course of Action (COA) Analysis Tool (RCAT)

File details come from the government source that posted it. Updated .