Analysis of Mobility Platform (AMP) Request for Proposal (RFP) HTC71124RD002
Closed Solicitation Posted
- Solicitation number
- HTC71124RD002
- Agency
-
United States Transportation Command
Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541511 Custom Computer Programming Services
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Transportation Command (USTRANSCOM) is seeking proposals for the Analysis of Mobility Platform (AMP) suite of tools, which supports the analysis of the joint deployment distribution enterprise. The AMP program includes a range of simulation and optimization modeling tools used for transportation modeling and analysis. This requirement has 12 task areas, including contract management, technical support, requirements management, software maintenance, cybersecurity, and cloud migration. Proposals will be evaluated based on the vendor's ability to meet these requirements. The solicitation was posted on February 23, 2024, and proposals are due by April 8, 2024.
This solicitation is not set-aside for any specific business type. The primary NAICS code is 541330 (Engineering Services), and the primary PSC code is R425 (Support - Professional: Engineering/Technical). The incumbent contractor is unknown. The total value of the contract is not specified, but it will support USTRANSCOM's transportation modeling and analysis needs. The place of performance is not explicitly stated but is likely at the vendor's facilities and USTRANSCOM locations.
Notice text
6 versions
Update #6 · Latest ·
Amendment 0004 provides clarification on the Defense Counterintelligence and Security Agency (DCSA) Open Storage Facility with DCSA approved SIPRNet drops.Amendment 0003 provides responses to questions submitted. As a result of the questions, Sections L and M and Attachments 9 and 11 are revised.Amendment 0002 revised Attachments 1, 2, 7, 9, 10, and 11. It extends the proposal due date to 08 April 2025.Amdendment 0001 updates the Past Performance Questionnaire submission time and date.AMP is a suite of tools supporting analysis of the joint deployment distribution enterprise (JDDE). Tools range from complex simulation and optimization modeling environments to highly detailed simulation tools. The United States Transportation Command (USTRANSCOM) Joint Distribution Process Analysis Center (JDPAC) is the functional manager for the AMP program, and the tools within the suite include:? AMP-Core? Air Refueling Model (ARM)? AMP-Port Analysis Tool (AMP-PAT)? Rapid Course of Action (COA) Analysis Tool (RCAT)? Joint Mobility Closure Estimator (JMCE)? AMP-Transportation Feasibility Assessment (AMP-TFA)AMP is a transportation modeling and simulation framework used to obtain an end-to-end simulation of the Defense Transportation System (DTS). AMP supports transportation enabler requirements during Time-Phased Force and Deployment Data development processes and provides throughput analysis for airports and seaports. This requirement will have 12 task areas: Contract and Program Management, Technical Support for Studies and Analysis, Requirements Management, Support for Design and Development, Software Maintenance, Application Administration, Security Engineering and Cyber Security Requirements, Support for Annual AMP Contingency Plan Review, Configuration Management, Sustainment Enhancement, New Capability, and Cloud Migration.
Update #5 ·
All proposal submissions including subcontractor sealed packages shall be submitted through the Solicitation Module of the PIEE suite at https://piee.eb.mil/.
Amendment 0003 provides responses to questions submitted. As a result of the questions, Sections L and M and Attachments 9 and 11 are revised.Amendment 0002 revised Attachments 1, 2, 7, 9, 10, and 11. It extends the proposal due date to 08 April 2025.Amdendment 0001 updates the Past Performance Questionnaire submission time and date.AMP is a suite of tools supporting analysis of the joint deployment distribution enterprise (JDDE). Tools range from complex simulation and optimization modeling environments to highly detailed simulation tools. The United States Transportation Command (USTRANSCOM) Joint Distribution Process Analysis Center (JDPAC) is the functional manager for the AMP program, and the tools within the suite include:? AMP-Core? Air Refueling Model (ARM)? AMP-Port Analysis Tool (AMP-PAT)? Rapid Course of Action (COA) Analysis Tool (RCAT)? Joint Mobility Closure Estimator (JMCE)? AMP-Transportation Feasibility Assessment (AMP-TFA)AMP is a transportation modeling and simulation framework used to obtain an end-to-end simulation of the Defense Transportation System (DTS). AMP supports transportation enabler requirements during Time-Phased Force and Deployment Data development processes and provides throughput analysis for airports and seaports. This requirement will have 12 task areas: Contract and Program Management, Technical Support for Studies and Analysis, Requirements Management, Support for Design and Development, Software Maintenance, Application Administration, Security Engineering and Cyber Security Requirements, Support for Annual AMP Contingency Plan Review, Configuration Management, Sustainment Enhancement, New Capability, and Cloud Migration.
Update #4 ·
Amendment 0003 provides responses to questions submitted. As a result of the questions, Sections L and M and Attachments 9 and 11 are revised.Amendment 0002 revised Attachments 1, 2, 7, 9, 10, and 11. It extends the proposal due date to 08 April 2025.Amdendment 0001 updates the Past Performance Questionnaire submission time and date.AMP is a suite of tools supporting analysis of the joint deployment distribution enterprise (JDDE). Tools range from complex simulation and optimization modeling environments to highly detailed simulation tools. The United States Transportation Command (USTRANSCOM) Joint Distribution Process Analysis Center (JDPAC) is the functional manager for the AMP program, and the tools within the suite include:? AMP-Core? Air Refueling Model (ARM)? AMP-Port Analysis Tool (AMP-PAT)? Rapid Course of Action (COA) Analysis Tool (RCAT)? Joint Mobility Closure Estimator (JMCE)? AMP-Transportation Feasibility Assessment (AMP-TFA)AMP is a transportation modeling and simulation framework used to obtain an end-to-end simulation of the Defense Transportation System (DTS). AMP supports transportation enabler requirements during Time-Phased Force and Deployment Data development processes and provides throughput analysis for airports and seaports. This requirement will have 12 task areas: Contract and Program Management, Technical Support for Studies and Analysis, Requirements Management, Support for Design and Development, Software Maintenance, Application Administration, Security Engineering and Cyber Security Requirements, Support for Annual AMP Contingency Plan Review, Configuration Management, Sustainment Enhancement, New Capability, and Cloud Migration.
Update #3 ·
Amendment 0002 revised Attachments 1, 2, 7, 9, 10, and 11. It extends the proposal due date to 08 April 2025.Amdendment 0001 updates the Past Performance Questionnaire submission time and date.AMP is a suite of tools supporting analysis of the joint deployment distribution enterprise (JDDE). Tools range from complex simulation and optimization modeling environments to highly detailed simulation tools. The United States Transportation Command (USTRANSCOM) Joint Distribution Process Analysis Center (JDPAC) is the functional manager for the AMP program, and the tools within the suite include:? AMP-Core? Air Refueling Model (ARM)? AMP-Port Analysis Tool (AMP-PAT)? Rapid Course of Action (COA) Analysis Tool (RCAT)? Joint Mobility Closure Estimator (JMCE)? AMP-Transportation Feasibility Assessment (AMP-TFA)AMP is a transportation modeling and simulation framework used to obtain an end-to-end simulation of the Defense Transportation System (DTS). AMP supports transportation enabler requirements during Time-Phased Force and Deployment Data development processes and provides throughput analysis for airports and seaports. This requirement will have 12 task areas: Contract and Program Management, Technical Support for Studies and Analysis, Requirements Management, Support for Design and Development, Software Maintenance, Application Administration, Security Engineering and Cyber Security Requirements, Support for Annual AMP Contingency Plan Review, Configuration Management, Sustainment Enhancement, New Capability, and Cloud Migration.
Update #2 ·
Amdendment updates the Past Performance Questionnaire submission time and date.AMP is a suite of tools supporting analysis of the joint deployment distribution enterprise (JDDE). Tools range from complex simulation and optimization modeling environments to highly detailed simulation tools. The United States Transportation Command (USTRANSCOM) Joint Distribution Process Analysis Center (JDPAC) is the functional manager for the AMP program, and the tools within the suite include:? AMP-Core? Air Refueling Model (ARM)? AMP-Port Analysis Tool (AMP-PAT)? Rapid Course of Action (COA) Analysis Tool (RCAT)? Joint Mobility Closure Estimator (JMCE)? AMP-Transportation Feasibility Assessment (AMP-TFA)AMP is a transportation modeling and simulation framework used to obtain an end-to-end simulation of the Defense Transportation System (DTS). AMP supports transportation enabler requirements during Time-Phased Force and Deployment Data development processes and provides throughput analysis for airports and seaports. This requirement will have 12 task areas: Contract and Program Management, Technical Support for Studies and Analysis, Requirements Management, Support for Design and Development, Software Maintenance, Application Administration, Security Engineering and Cyber Security Requirements, Support for Annual AMP Contingency Plan Review, Configuration Management, Sustainment Enhancement, New Capability, and Cloud Migration.
Update #1 ·
AMP is a suite of tools supporting analysis of the joint deployment distribution enterprise (JDDE). Tools range from complex simulation and optimization modeling environments to highly detailed simulation tools. The United States Transportation Command (USTRANSCOM) Joint Distribution Process Analysis Center (JDPAC) is the functional manager for the AMP program, and the tools within the suite include:? AMP-Core? Air Refueling Model (ARM)? AMP-Port Analysis Tool (AMP-PAT)? Rapid Course of Action (COA) Analysis Tool (RCAT)? Joint Mobility Closure Estimator (JMCE)? AMP-Transportation Feasibility Assessment (AMP-TFA)AMP is a transportation modeling and simulation framework used to obtain an end-to-end simulation of the Defense Transportation System (DTS). AMP supports transportation enabler requirements during Time-Phased Force and Deployment Data development processes and provides throughput analysis for airports and seaports. This requirement will have 12 task areas: Contract and Program Management, Technical Support for Studies and Analysis, Requirements Management, Support for Design and Development, Software Maintenance, Application Administration, Security Engineering and Cyber Security Requirements, Support for Annual AMP Contingency Plan Review, Configuration Management, Sustainment Enhancement, New Capability, and Cloud Migration.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Analysis of Mobility Platform (AMP) | Pre-Solicitation | |
| Analysis of Mobility Platform RFI | Pre-Solicitation | |
| Analysis of Mobility Platform (AMP) | Special Notice |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USTRANSCOM Commercial Solutions Opening (CSO) | United States Transportation Command | No set-aside | |
| CSO - USTRANSCOM Information Technology (IT) Enterprise Modernization (ITEM) Solutions | United States Transportation Command | No set-aside | |
| ITS4US Deployment Accelerator | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity